MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
.- - - - =. - . .. . - . - . . . .. . .
rom OPERATING DATA REPORT Ed DOCKET NO. 50-266 m DATE october 5, 1983 I 83
% o COMPLETED BY C. W. FAY TELEPHONE 414 277 2811
~
oo OPERATING STATUS Tuo ........................
i 37 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1
- 2. REPORTIN6 PERIOD: SEPTEMBER 1983
. NOTES
- 3. LICENSED THERMAL POWER (MUT): 1518. . .
- 4. NAMEPLATE RATIN6 (6ROSS MWE): 523.8 . .
] 5. DESIGN ELECTRICAL RATIN6 (NET MWE): 497. . .
- 6. MAXIMUM DEPENDABLE CAPACITY (6ROSS MUE)
- 519. . .
] 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495. ........................
- 8. IF CHAN6ES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 390.0
- 10. REASONS FOR RESTRICTIONS, (IF ANY)
- Power level restricted because of self-imposed hot leg limitation in an attempt to limit steam generator tube corrosion.
THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 6,551 113,087
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,502.6 94,074.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.4 625.4 1 14. HOURS GENERATOR ON LINE 720.0 6,495.9 91,604.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 793.5
- 16. 6ROSS THERMAL ENER6Y 6ENERATED (MUH) 842,740 7,584,827 123,533,816
- 17. GROSS ELECTRICAL ENER6Y 6ENERATED (MWH) 278,960 2,519,690 41,395,480
- 18. NET ELECTRICAL ENER6Y 6ENERATED (MWH) 263,725 2,384,844 39,366,562
- 19. UNIT SERVICE FACTOR 100.0 99.2 81.0
- 20. UNIT AVAILABILITY FACTOR 100.0 99.2 81.7
- 21. UNIT CAPACITY FACTOR (USIN6 MDC NET) 74.0 73.5 71.2 i 22. UNIT CAPACITY FACTOR (USING BER NET) 73.7 73.2 70.0
- 23. UNIT FORCED OUTA6E RATE 0.0 0.1 2.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE, DATE, AND DURATION OF EACH):
i Twenty-six week refueling and steam generator replacement outage scheduled to commence on October 1, 1983.
! 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE October 5, 1983 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH September, 1983 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 359 11 309 21 365 2 362 12 370 22 367 3 363 13 371 23 368
] 4 371 14 369 24 368 4
5 369 15 368 25 371 6 371 16 369 26 372 7 372 17 367 27 372 8 371 18 366 28 371 1
9 372 19 366 29 372 10 367 20 367 30 366 31 AD-28A
] (1-77)
ll ! . !! - : i: ; j !,, '. i 'i
(!;A 0D 1 -
2 N 78 8B
.o
) _
D SF a
- t e _
SF co hr ec -
de ud ege<
l e _
d as evaoa mguna t I
CFEDCBAR c N I ;ogoc r
- - - - - - - - e a
OOAORRMEs tp dp e e a q o
%eojo o% r U h e m e g fiu n R N e r ir u u n i: mrjoacC E I Co5- yeovo4 D m ranaletp P T titalem O
( isotine R S eotronan T l i
xnr paaTy rgnt c
L U i M T lltr eF c O D -
a iaR a Re N O iEvie oi en T W nrens rl ps I I N
) r it u oe S o nr Tr re r gi ee t S A c s E e N
( &t t( Nv p D .
e i e oe t x Lo x .n e P p in p t m O l c l b W a e a e E i n i ,r R n s n aeE
) e ) myoe r v 1 R
E E 9 D x 8 U _
a 3 C m T I
0osycecu o e n O 3 N S
432lM
- - - e _
t C OAMMh . -
a tuaao Tu htnnd eouu: os e
rmaa P all . ra C
(
eiS t en TO vd EM D p
xcc e LP UO r nC EL NC lSa to PE IK acm ir r HT TE Rr OE T na ee NDDN
)
m cc E AAN ut 5 ri BTM.O YEE SE rv ox
( Sate ee 4 COP 5 Nhtix n 1 . c o 0 uh U e io h cA 4 t i -
ri Reoni ec / W o n 2 cb Etnsb t 2 . b t 6 ei Gs i i 7 e 6 _
t - oft o 7 F r B 0ffo n - a e I 1o rG 2 y 5 a
- 6rD - 8 ,
c 1 API 1 h S ) Ltrn 1 1 a Eaes 9 U m R pt 8 n Y e Ear 3 i Fnru t '
it c 1 lr -
ey
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-266 Unit Name Point Beach Unit 1 Date October 5, 1983 e Completed By C. W. Fay Telephone 414/277-2811
. Unit 1 operated at approximately 369 MWe net throughout the
' period. At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on September 30, 1983, Unit 1 commenced load reduction for the steam generator replacement outage. The unit was taken off line at 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> on October 1, 1983.
The primary-to-secondary leakage remains stable at less than 10 gallons per day.
On September 26, 1983, a breach was found in a passive fire barrier in the west wall of the 4 KV vital switchgear room. The fire barrier was penetrated for the purpose of running cables in the cable tray which penetrates the wall by contractors in early spring this year. The problem was rectified the same day. A Significant Operating Event will be written on this incident.
On September 20, 1983, the annual NRC-required Emergency Plan drill was conducted and lasted approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.
On September 7, 1983, Unit 1 developed a control rod problem giving an urgent alarm. I&C was called in and after approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> a faulty circuit board was replaced in the rod control system and the rod control system returned to normal.
On September 29, 1983, at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />, the smoke detection system for the cable spreading room and the 4160 V vital switchgear room was discovered out of service. Upon discovery, hourly inspections were commenced. The detection system was returned to service on September 30, 1983 at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> and a 30-day Licensee Event Report will be drafted for submittal to the NRC.
J d
OPERATING LATA REPORT
- DOCKET $0. 50-301 DATE october 5, 1983 COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATIN6 STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR FLANT UNIT 2 . NOTES .
- 2. REPORTING PERIOD: SEPTEMBER 1983 . .
. 3. LICENSED THERMAL POWER (NUT): 1518. . >
- 4. NAMEPLATE RATIN6 (8ROSS MWE): 523.8 . .
- 5. DESI6N ELECTRICAL RATING (NET M4E): 497. . .
- 6. MAXIMUM DEPENDADLE CAPACITY (6ROSS MUE): 519. . .
- 7. WAXIMUM DEPENDABLE CAPACITY (NET MUE): 495. ........................
, 8. IF CHANGES 2; CUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROU6H 7) SINCE LAST REPORT, 6IVE REASONS:
NOT APPLICABLE
- 9. PCUER LEVEL TO WHICH RESTRICTED, IF ANY (NET KWE): NOT APPLICABLE 4
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS HONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 6,551 97,872
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,164.4 86,222.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.5 198.3 i 14. HOURS 6ENERATOR ON LINE 720.0 4,044.3 84,699.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 1.5 182.7 l 16. 6ROSS THERMAL ENER6Y 6ENERATED (MWH) 1,087,367 6,054,148 117,569,742 J 17. GROSS ELECTRICAL ENER6Y SENERATED (MWH) 367,200 2,034,790 39,836,190
! 18. NET ELECTRICAL ENER6Y GENERATED (MUN) 350,863 1,937,320 37,926,287 I 19. UNIT SERVICE FACTOR 100.0 61.7 86.5
- 20. UNIT AVAILABILITY FACTOR 100.0 61.8 06.7
- 21. UNIT CAPACITY FACTOR (USIN6 MDC NET) 98.4 59.7 78.8
- 22. UNIT CAPACITY FACTOR (USIN6 DER NET) 98.1 59.5 78.0
- 23. UNIT FORCED OUTA6E RATE 0.0 0.7 1.5
- 24. SHUTDOWNS SCHEDULED DVER NEXT & MOMTHS (TYPE, BATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF SIARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS RE8UESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
DOCKET NOo 301 UNIT NAME Point Beach Unit 2 DATE October 5, 1983 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL a
MONTH September, 1983 l
)
I AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 430 11 493 21 485
- 2 482 12 490 22 485 3 485 13 491 23 486 l 4 472 14 489 24 488 5 492 15 489 25 490
- 6 491 16 490 26 491 1
- 7 491 17 488 27 490 8 491 18 481 28 491
!; 9 492 19 486 29 491 l 10 492 20 486 30 472 l 31 AD-28A (1-77)
oO HI Z I N O
-a co +
co to o
in N D
. . . . ct O
en N O:r O.
(D O 1
S'$. Type H
(D C'
Duration (Hours) w '
= O N to o O to > % Reason I I I i 1 1 1 I O N
O O > O :o x 3 to en et t o.t (D (D m .n O biethod Of C D' (D 5 O C m P- C D Z (D M H M C C D H "
Shutting 3 b H M m D m H (D et t m 8 ct P et W H (D 9 DOwn Reactor O
- H (n O tt + 3 (D to CD (D O rt M O D D D 8 =
XDM M Q U ct td C tWD8M O H 3 8 H H tt M (D N O O O P P D 'c W tc O Z O P tn < P O O P- (D D 8 5 3 M G U (n MH 'O (n Z Z "M P cr C O (D tn O 3M 8M MO M Q P- 0 (D ct in >
0 to tu O Z
- m rt (t - Z< t O O H- O . O (D ct X t1 0 X
'O P3 'O tt B O H O bd tr E 9 (D > 0 CG P- 3 P- M lc D m D System -
~ * ~
Code 4 s w
tn a X co C P W O 3
COmpOngnt d y Code @
en A W N Pd 3 1 1 1 I O tt O
O > 3 3 D* D ct C D W O 8C 3" rt 3 3 0, O to (D 0 C C a O M9DW *d A P' P' Mm O
- rt O3 8O O P en < Q, tt 3 D XOO O M *0 CO
'O M DO tu t* ZO P' en W rt O 'c td HM DG3 M =8 *3 tu PM to M O to 8 3D 0 (D 2OOZ
- 5 OO tu >>Z C rt tD 8 3 O LD A MH *< tu tu
tn td - (n m et tu (D O A O O 'e ui OX Z D' rt P- X 3 H . O O o C D' C O P O D' O> A rt P- 1 MH Sc (D O D P- iD 0 N E O D w O CT tu rt D (a tf rt N
- CT rt o (D H O (n H H -4 (D Ha et i O m rt O w *c M to ommO D I D C H Pd O MO ,N'< 01 m i mMU i @ - O H W 'd H H' tY in w tg et n 3 y p N in W (D (n
(D td W M W P- -
'd D M C rt .
P tt iO P' M i w 0 '<
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date October 4, 1983 Completed By C. W. Fay Telephone 414/277-2811 Unit 2 operated at approximately 487 MWe net throughout the period with no significant load changes.
The primary-to-secondary leakage remains stable at less than 10 gallons per day.
On September 12, 1983, the Unit 2 containment hatch was-left unlocked. A Significant Operating Event was written on the incident.
Safety-related maintenance included repairing a 2P2C charging pump leak and dismantling and inspection of the rotating element from 2P15A.
J
, , _ . ,. __ .-__,.w... .m.,m..
J' ntecomwn Bectrw miacounur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 October 10, 1983 Director of Regulatory Operations U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Gentlemen:
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of September 1983.
Very truly yours, N
Vice Presi ent-Nuclear Power C. W. Fay Attachments Copics to J. G. Keppler - NRC Region III NRC Resident Inspector C. F. Riederer - PSCW 8
i