rom OPERATING DATA REPORT Ed DOCKET NO. 50-266 m DATE october 5, 1983 I 83

% o COMPLETED BY C. W. FAY TELEPHONE 414 277 2811

~

oo OPERATING STATUS Tuo ........................

i 37 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1

2. REPORTIN6 PERIOD: SEPTEMBER 1983

. NOTES

3. LICENSED THERMAL POWER (MUT): 1518. . .
4. NAMEPLATE RATIN6 (6ROSS MWE): 523.8 . .

] 5. DESIGN ELECTRICAL RATIN6 (NET MWE): 497. . .

6. MAXIMUM DEPENDABLE CAPACITY (6ROSS MUE)
519. . .

] 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495. ........................

8. IF CHAN6ES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
390.0
10. REASONS FOR RESTRICTIONS, (IF ANY)
Power level restricted because of self-imposed hot leg limitation in an attempt to limit steam generator tube corrosion.

THIS MONTH YR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720 6,551 113,087
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,502.6 94,074.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.4 625.4 1 14. HOURS GENERATOR ON LINE 720.0 6,495.9 91,604.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 793.5
16. 6ROSS THERMAL ENER6Y 6ENERATED (MUH) 842,740 7,584,827 123,533,816
17. GROSS ELECTRICAL ENER6Y 6ENERATED (MWH) 278,960 2,519,690 41,395,480
18. NET ELECTRICAL ENER6Y 6ENERATED (MWH) 263,725 2,384,844 39,366,562
19. UNIT SERVICE FACTOR 100.0 99.2 81.0
20. UNIT AVAILABILITY FACTOR 100.0 99.2 81.7
21. UNIT CAPACITY FACTOR (USIN6 MDC NET) 74.0 73.5 71.2 i 22. UNIT CAPACITY FACTOR (USING BER NET) 73.7 73.2 70.0
23. UNIT FORCED OUTA6E RATE 0.0 0.1 2.6
24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE, DATE, AND DURATION OF EACH):

i Twenty-six week refueling and steam generator replacement outage scheduled to commence on October 1, 1983.

! 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE October 5, 1983 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH September, 1983 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 359 11 309 21 365 2 362 12 370 22 367 3 363 13 371 23 368

] 4 371 14 369 24 368 4

5 369 15 368 25 371 6 371 16 369 26 372 7 372 17 367 27 372 8 371 18 366 28 371 1

9 372 19 366 29 372 10 367 20 367 30 366 31 AD-28A

] (1-77)

ll  ! . !! - : i: ; j  !,, '. i 'i

(!;A 0D 1 -

2 N 78 8B

.o

) _

D SF a

t e _

SF co hr ec -

de ud ege<

l e _

d as evaoa mguna t I

CFEDCBAR c N I ;ogoc r

- - - - - - - - e a

OOAORRMEs tp dp e e a q o

%eojo o% r U h e m e g fiu n R N e r ir u u n i: mrjoacC E I Co5- yeovo4 D m ranaletp P T titalem O

( isotine R S eotronan T l i

xnr paaTy rgnt c

L U i M T lltr eF c O D -

a iaR a Re N O iEvie oi en T W nrens rl ps I I N

) r it u oe S o nr Tr re r gi ee t S A c s E e N

( &t t( Nv p D .

e i e oe t x Lo x .n e P p in p t m O l c l b W a e a e E i n i ,r R n s n aeE

) e ) myoe r v 1 R

E E 9 D x 8 U _

a 3 C m T I

0osycecu o e n O 3 N S

432lM

- - - e _

t C OAMMh . -

a tuaao Tu htnnd eouu: os e

rmaa P all . ra C

(

eiS t en TO vd EM D p

xcc e LP UO r nC EL NC lSa to PE IK acm ir r HT TE Rr OE T na ee NDDN

)

m cc E AAN ut 5 ri BTM.O YEE SE rv ox

( Sate ee 4 COP 5 Nhtix n 1 . c o 0 uh U e io h cA 4 t i -

ri Reoni ec / W o n 2 cb Etnsb t 2 . b t 6 ei Gs i i 7 e 6 _

t - oft o 7 F r B 0ffo n - a e I 1o rG 2 y 5 a

- 6rD - 8 ,

c 1 API 1 h S ) Ltrn 1 1 a Eaes 9 U m R pt 8 n Y e Ear 3 i Fnru t '

it c 1 lr -

ey

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-266 Unit Name Point Beach Unit 1 Date October 5, 1983 e Completed By C. W. Fay Telephone 414/277-2811

. Unit 1 operated at approximately 369 MWe net throughout the

' period. At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on September 30, 1983, Unit 1 commenced load reduction for the steam generator replacement outage. The unit was taken off line at 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> on October 1, 1983.

The primary-to-secondary leakage remains stable at less than 10 gallons per day.

On September 26, 1983, a breach was found in a passive fire barrier in the west wall of the 4 KV vital switchgear room. The fire barrier was penetrated for the purpose of running cables in the cable tray which penetrates the wall by contractors in early spring this year. The problem was rectified the same day. A Significant Operating Event will be written on this incident.

On September 20, 1983, the annual NRC-required Emergency Plan drill was conducted and lasted approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.

On September 7, 1983, Unit 1 developed a control rod problem giving an urgent alarm. I&C was called in and after approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> a faulty circuit board was replaced in the rod control system and the rod control system returned to normal.

On September 29, 1983, at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />, the smoke detection system for the cable spreading room and the 4160 V vital switchgear room was discovered out of service. Upon discovery, hourly inspections were commenced. The detection system was returned to service on September 30, 1983 at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> and a 30-day Licensee Event Report will be drafted for submittal to the NRC.

J d

OPERATING LATA REPORT

  • DOCKET $0. 50-301 DATE october 5, 1983 COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATIN6 STATUS
1. UNIT NAME: POINT BEACH NUCLEAR FLANT UNIT 2 . NOTES .
2. REPORTING PERIOD: SEPTEMBER 1983 . .

. 3. LICENSED THERMAL POWER (NUT): 1518. . >

4. NAMEPLATE RATIN6 (8ROSS MWE): 523.8 . .
5. DESI6N ELECTRICAL RATING (NET M4E): 497. . .
6. MAXIMUM DEPENDADLE CAPACITY (6ROSS MUE): 519. . .
7. WAXIMUM DEPENDABLE CAPACITY (NET MUE): 495. ........................

, 8. IF CHANGES 2; CUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROU6H 7) SINCE LAST REPORT, 6IVE REASONS:

NOT APPLICABLE

9. PCUER LEVEL TO WHICH RESTRICTED, IF ANY (NET KWE): NOT APPLICABLE 4
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS HONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 720 6,551 97,872
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,164.4 86,222.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.5 198.3 i 14. HOURS 6ENERATOR ON LINE 720.0 4,044.3 84,699.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 1.5 182.7 l 16. 6ROSS THERMAL ENER6Y 6ENERATED (MWH) 1,087,367 6,054,148 117,569,742 J 17. GROSS ELECTRICAL ENER6Y SENERATED (MWH) 367,200 2,034,790 39,836,190

! 18. NET ELECTRICAL ENER6Y GENERATED (MUN) 350,863 1,937,320 37,926,287 I 19. UNIT SERVICE FACTOR 100.0 61.7 86.5

20. UNIT AVAILABILITY FACTOR 100.0 61.8 06.7
21. UNIT CAPACITY FACTOR (USIN6 MDC NET) 98.4 59.7 78.8
22. UNIT CAPACITY FACTOR (USIN6 DER NET) 98.1 59.5 78.0
23. UNIT FORCED OUTA6E RATE 0.0 0.7 1.5
24. SHUTDOWNS SCHEDULED DVER NEXT & MOMTHS (TYPE, BATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF SIARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS RE8UESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

DOCKET NOo 301 UNIT NAME Point Beach Unit 2 DATE October 5, 1983 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL a

MONTH September, 1983 l

)

I AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 430 11 493 21 485

2 482 12 490 22 485 3 485 13 491 23 486 l 4 472 14 489 24 488 5 492 15 489 25 490
6 491 16 490 26 491 1
7 491 17 488 27 490 8 491 18 481 28 491

!; 9 492 19 486 29 491 l 10 492 20 486 30 472 l 31 AD-28A (1-77)

oO HI Z I N O

-a co +

co to o

in N D

. . . . ct O

en N O:r O.

(D O 1

S'$. Type H

(D C'

Duration (Hours) w '

= O N to o O to > % Reason I I I i 1 1 1 I O N

O O > O :o x 3 to en et t o.t (D (D m .n O biethod Of C D' (D 5 O C m P- C D Z (D M H M C C D H "

Shutting 3 b H M m D m H (D et t m 8 ct P et W H (D 9 DOwn Reactor O

- H (n O tt + 3 (D to CD (D O rt M O D D D 8 =

XDM M Q U ct td C tWD8M O H 3 8 H H tt M (D N O O O P P D 'c W tc O Z O P tn < P O O P- (D D 8 5 3 M G U (n MH 'O (n Z Z "M P cr C O (D tn O 3M 8M MO M Q P- 0 (D ct in >

0 to tu O Z

- m rt (t - Z< t O O H- O . O (D ct X t1 0 X

  • D O 'O

'O P3 'O tt B O H O bd tr E 9 (D > 0 CG P- 3 P- M lc D m D System -

~ * ~

Code 4 s w

tn a X co C P W O 3

COmpOngnt d y Code @

en A W N Pd 3 1 1 1 I O tt O

O > 3 3 D* D ct C D W O 8C 3" rt 3 3 0, O to (D 0 C C a O M9DW *d A P' P' Mm O

- rt O3 8O O P en < Q, tt 3 D XOO O M *0 CO

'O M DO tu t* ZO P' en W rt O 'c td HM DG3 M =8 *3 tu PM to M O to 8 3D 0 (D 2OOZ

  • 5 OO tu >>Z C rt tD 8 3 O LD A MH *< tu tu
  • M<

tn td - (n m et tu (D O A O O 'e ui OX Z D' rt P- X 3 H . O O o C D' C O P O D' O> A rt P- 1 MH Sc (D O D P- iD 0 N E O D w O CT tu rt D (a tf rt N

  • CT rt o (D H O (n H H -4 (D Ha et i O m rt O w *c M to ommO D I D C H Pd O MO ,N'< 01 m i mMU i @ - O H W 'd H H' tY in w tg et n 3 y p N in W (D (n
  • w C 9 30 'O tt Co D .

(D td W M W P- -

'd D M C rt .

P tt iO P' M i w 0 '<

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date October 4, 1983 Completed By C. W. Fay Telephone 414/277-2811 Unit 2 operated at approximately 487 MWe net throughout the period with no significant load changes.

The primary-to-secondary leakage remains stable at less than 10 gallons per day.

On September 12, 1983, the Unit 2 containment hatch was-left unlocked. A Significant Operating Event was written on the incident.

Safety-related maintenance included repairing a 2P2C charging pump leak and dismantling and inspection of the rotating element from 2P15A.

J

, , _ . ,. __ .-__,.w... .m.,m..

J' ntecomwn Bectrw miacounur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 October 10, 1983 Director of Regulatory Operations U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Gentlemen:

MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of September 1983.

Very truly yours, N

Vice Presi ent-Nuclear Power C. W. Fay Attachments Copics to J. G. Keppler - NRC Region III NRC Resident Inspector C. F. Riederer - PSCW 8

i