Forwards Draft FSAR Page Changes & Revised Response to Question 640.21,deleting Startup Test (SUT) 38, MSIV Leakage Control Sys (MSIV-LGS) Performance Verification. Functional Test Requirements Incorporated Into Test 83.1
ML20084A057
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/18/1984
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8404240381
Download: ML20084A057 (6)


Text

.

O PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 JOHN S. KEMPER V IC E-PR ESID E N T E NG6ME E RthG AMD RESE ARCat Mr. A. Schwencer, Chief April 18, 1984 Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Limerick Generating Station, Units l&2 Start-Up Test (SUT)-38 Pro'cedures and System Review Branch (PSRB)

Reference:

PECO and NRC telecon dated March 1, 1984 between M. J. Campanone and W. Long (NRC) and C. R. Endriss, V. Nilekni (Bechtel) and R. J. Stipcevich (PECO).

File: GOVT l-1 (NRC)

Dear Mr. Schwencer:

As discussed in the reference telecon with the Procedures and Systems Branch Reviewer, start-up test (SUT)-38, "MSIV Leakage Control System (MSIV-LGS)

Performance Verification", is being deleted from the FSAR.

We will incorporate the functional testing requirements for the MSIV-LGS in pre-op test 83.1, " Main Steam System".

Pre-op test 83.1 will functionally test the MSIV-LGS using compressed air instead of nuclear steam thereby avoiding the potential for contaminating primary containment, the steam tunnel and standby gas treatment system filters. This change will keep radiation exposure to personnel as low as reasonably achievable.

The PSRB branch reviewer, W. Long, concurred with this change and in fact stated that, with this approach, Limerick would be consistent with what other similar plants have done.

DR .

p

,p # <1

  • l l

c '

Therefore, the attached draft FSAR page changes and revised response to Question 640.21 deleting SUT-38 will be formally incorporated into the FSAR exactly as they appear on the attachments in the FSAR revision scheduled for May, 1984.

Sincerely,

{.,Wy/-

RJS/gra/041184130 cc: See Attached Service List

, cc: . Judge Lawrence Brenner (w/o enclcsure)

Judge Peter A. Morris (w/o enclosure)

Judge Richard F. Cole (w/o enclosure)

Troy B. Conner, Jr., Esq. (w/o enclosure)

Ann P. Hodgdon, Esq. (w/o enclosure)

Mr. Frank R. Romano (w/o enclosure)

Mr. Robert L. Anthony (w/o enclosure)

Mr. Marvin I. Iawis (w/o enclosure)

Charles W. Elliot, Esq. (w/o enclosure)

Zori G. Ferkin, Esq. (w/o enclosure)

Mr. Thcrns Gerusky (w/o enclosure)

Director, Penna. Energency (w/c enclosure)

Managemnt Agency Mr. Steven P. Hershey (w/o enclosure)

Angus Iove, Esq. (w/o enclosure)

Mr. Joseph H. k'hite, III (w/o enclosure)

David Wersen, Esq. (w/o enclosure)

Robert J. Sugarnan, Esq. (w/o enclosure)

Spence W. Perry, Esq. (w/o enclosure)

Jay M. Gutierrez, Esq. (w/o enclosure)

Atcmic Safety & Licensing (w/o enclosure)

Ap} mal Board Atanic Safety & Licensing (w/o enclosure)

Board Panel Docket & Service Section (w/o enclosure)

Martha W. Bush, Esq. (w/o enclosure)

James Wiggins (w/o enclosure)

Mr. Timothy R. S. Campbell (w/o enclosure)

Phyllis Zitzer (w/o enclosure)

v &; g.w #.xm. , pgglg, $ a @ ,- f r i. s. . wy y n~, '-

~ ' --~~

,w- .g ,- , .

g -9A. o op ,

! [L, -

K 'psgp % . p

-u.

x .. - ,

)?  ;$ .

-N  %

TABh:14.:t-3(Cont'd)-. ,(Page 24 of 24)

=c _

' W~ k 4 z Acceptance Criteria - The measured response of the piping system

~ 7 and restraint loads shall be less.than the acceptable response d * ~ determined by analysis as specified-in Section 3.9.2.1.b.1.

(STP-37) Main Steam System and Turbine Performance and Plant Dynamic Response Verification (Formerly SUT-37)

Test Obiectives - The test objectives are to demonstrate (1) the satisfactory performance of the main steam system and.the main

, turbine; and (2) that the dynamic response of the plant to the design load swings, including step and ramp ' changes, is in '

accordance with design.

. Prerequisites - Fuel loading is completed, and power ascension testing is in progress.

Test Method - Reactor power is brought to 25, 50, 75 and 100 percent to verify operability and design performance requirements i of the main steam system and main turbine. Design step and ramp load changes are induced at each power level to verify plant dynamic response.

~

Acceptance Criteria - The main steam system operates properly at the specified power levels. The main turbine operates within

! specifred limits throughout the full power range. The dynamic

. response of the plant to design load swings is within specified limits.

(STP-38) DELETED 4ST" 30) MC!V I,c;ie;; Centrel Sy:t= "crf;m:nce V;rification

( Mr trly e"T-39) y ective - e test objeepi h s to demor)$ rthe i

prformnceof)eMSVleakag control syster/ to coritrol leak e throug the el ed M IV valve seats. .

Prere uisite Plan is oper ting a a stea y state wer lo d.

Tes.! Method Sys m opera ion is anually initia d. Sys em d reco ded. S stem formanc is

~

i pa ameters re itored

! v rified.

ccepta e Cri eria - stem c acity a suffi ient to control IV kage. System nterloc s oper te prope ly.

R V V " '

y Kf 464f4 .."Q r

, 'C Ja,

.w

( ' ' '

s - ,; . m a: ...

u s

, a r ;. - - ,

Ls Q-ni M - ;^ '.

w -W ,ca, :nm 4 h . ',^, .

?. . ...

1. ' ' ' . -

4{yfit #1 #b T vM

@ m i f Rev. 28,.01/84

- m

'7, _

s

. , - - - ,, ,- -,w, , , - - - , , - w - - - < , - , - , as,--en.,------n--- -

y: l ,

r', n>

-j

( f $

2 Si # hh I5 ga2 . si d

j

, .E .

' r-, .m~

E g g5 t to e- Eli3 E! '

h*

! e fj !l 9! .!g Si! 4! ee -

t; a6 o A

= r 9 g. fe.! i:5 sg- y

.a ,

2 B5 ga3::h'gh8'Etjs Bs 3 g g g3

- E

" E  !

T

, !n o

!!!n!

!!!l'i!Hlijd!Wd

. m!c.ammi DRAF?  !

4 e

i 1

.=aiEs es a e ss = 3 mi h 1.

j.. E. ,.i . .

a

. i.

, e G - . .

a aa% s s* si L.s

. . . . . . . 3 3 3 . . . . . ,

5

. a m 8 . . . . . I . . I - . .

+

. . . . . 3 . .

k E E .,

).

((

."; "j 6

+

5 g

...l .

e o ,

=

.l -

.s . . . . q , . a . . . .

.) .

j .l...

.; . .4 . . . . .

. . .l. . . .. . . . . . . . . . .

r ,..(. l

, t t p'

. . . = . .

a

!.i 1 5 5 h a

. . - P I ,.

e R C F' 4 !

s N h

- l w

1 .

5 r4 -

e

" 'c t v Li b i I o g

!,  !, IQ I A E . y 5 !5 II  ;"  ; T.

k  ! s  ?

)o : 0 3  ?

': rv o g P1 F q 8

5

] i T*;

e W.  ! Eg  ! 5 35 5

)!6

: 9 5 3:

Fi

'! [!

E 0 0 t u 3 g:

  • i  !  ! .l v  !  !

r o!,;$

!I l.

8 2 9 0 .

. ie T

. g .. l ejj

  • 0 o g<s ' 5 3 . 0 a r

!g g !

E E. 5 ! r!r

. fr I, , . . . 3 5$ 3  ! $ 7  !!

e 2 fu r a.r mr

s. s ,- , s.g , , a i

5 e E r. g t, 3" e s 2 i g: 4 -  ;  ; < - ge 1 r:  ; - y :V v, *1g - r. g a .  : : s g . . -

-);- i

+

e.8 I 4

i 6 a o, . I s .  :

c ., , -

r= > R <" e

< . c

  • fg- e' t D t - s o 8 , 6 3' 8 5 ;- >

l' *

$  ! "E " 5gI . . "

g r e .!

<9 -

i 2 5 5

  • E 2 8 6* Wi 5 i E g t  : 4  ;

! !.g Tv I SjIo!  !, !s f! !r !! '! !

5 a !o !!. $$ !  ! !  !

! ! s s e t ! l. 3 l3 !!!t r :. libE" :.-

t.

8 c 3 e  :!

g .e,'  :

Bg "  :!  !< -

h 3 a, --.

. 7 r !

  • r a.s, .Be

, e .

E, . aE, 8, g o c, 8 .

E v e r .s. r t, d

< m - - -- g  : s e..,

3 s

r. a..vv yj z" ;

v n

[ u>

1 9 .s .s g!. g . . .

v

. - !a g r =

a, < t

. <. . c g e.

e.I. E t

o 3 a...1' L.gi:

6 J. 3 jg . - - .

.;. . e : e e r  ;;r r e r e a m a n a n a n n m a n n a a m a n n e :

' a r  !

4 i.

6 A

r B

. . N

s. C r~ -i[

z .

n m a b -

LGS FSAR a

( OUESTION 640.21 (Section 14.2.12)

Provide a description of a test which demonstrates that the MSIV-LCS components operate properly when handling steam and that the system can handle the amount of leakage that is present when the main steam system is at operating temperature.

RESPONSE

This system is tested in preoperational procedure P-83.1.

^

..ddition:1 testing of systc; c;p; city will be perfer:Od i. : . Or etartup tent C"T 23, MSI'! Lc; hag; Contr;l Syster Perf 0r :n .

55 & 5 Nb. b p p heu>s.% aMd1ho, m A .u 'C s Ad W a% ,

fn % %CN

/

\

k 640.21-1 Rev. 10, 09/82

. - . -