ML20069K024

From kanterella
Revision as of 20:51, 28 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised TS Pages Supporting 921015 Submittal of TS Change Request 92-03-0,requesting Changes to TS Surveillance Intervals to Facilitate Change in Refueling Cycles from 18 Months to 24 Months,Per 940601 Telcon W/Nrc
ML20069K024
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/09/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20069K026 List:
References
NUDOCS 9406150217
Download: ML20069K024 (3)


Text

. ~ .

St: tion Suppsrt Diptrtmsnt n

. = mms =-

PECO ENERGY e'co ' e'9< c -" ">

Nuclear Group Headquarters 965 Chesterbrook Boulevard Wayne, PA 19087-5691 June 9,1994 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2 Technical Specifications Change Request 92-03-0 Revised Technical Specifications Pages Gentlemen:

By letter dated October 15,1992, PECO Energy Company submitted Technical Specifications (TS) Change Request No. 92-03-0 for Limerick Generating Station (LGS), Units 1 and 2, requesting changes to the LGS TS surveillance Intervals to facilitate a change in LGS refueling cycles from 18 months to 24 months.

By telephone on June 1,1994, the LGS NRC Project Manager (PM) indicated typographical errors appeared on the submitted TS pages which represented Change Request No. 92-03-0. In  ;

addition, the PM requested the re-submittal of TS pages in order to expedite the approval of TS Change Request No. 92-03-0. The following LGS TS pages are being re-submitted which i supersede those coinciding TS Change Request No. 92-03-0 pages previously submitted. l l

LGS Unit 1 LGS Unit 2 TS Panes TS Paoes 3/43-1 3/43-1 3/4 6-14 3/4 6-14 3/4 6-18 3/4 6-18 3/4 6-56 3/4 6-56 3/4 74 3/474 3/47-6 3/4 7-6a 2/48-3 3/48-3  ;

B 3/4 6-5 3/48-4 B 3/4 8-2 3/48-5 )'

B 3/4 6-5 B 3/4 8-2 0

- . 0 9406150217 940609 \\

PDR ADDCK 05000352 P PER ,

June 9,1994 Page 2 Attachment 1 to this letter contains the corrected TS pages, and the re-submittal of the requested pages. At the request of the LGS NRC PM, this information is being submitted under affirmation, and the required affidavit is enclosed.

If you have any questions, please do not hesitate to contact us.

Very truly yours,

. - v o .

G. A. Hunger, Jr., rector Licensing Attachment Enclosure cc: T. T. Martin, Administrator, Region I, USNRC (w/ attachment and enclosure)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachment and enclosure)

R. R. Janati, PA Bureau of Radiological Protection (w/ attachment and enclosure) l l

l L

l i

(

COMMONWEALTH OF PENNSYLVANIA

. ss.

l COUNTY OF CHESTER . l l

l W. H. Smith, til, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy Company, the Applicant herein; that he has read the corrected information for Technical Specifications Change Request No. 92-03-0 to facilitate a change In the Limerick Generating Station, Unit 1 and Unit 2, License Nos. NPF-39 and NPF-85, refue'ing cycles from 18 months to 24 months , and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

/

/

l/

Vice President Subscribed and s orn to before me this / day of 1994.

P

'm

. 4 -

Notary Public PDDflal Seal Erba A Santon, fMary Pdic TrnM'nr Two.. Chester County MyCommon Ep'esJuly 10.1995 4

.