ML20070Q814

From kanterella
Revision as of 13:56, 27 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1982
ML20070Q814
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/02/1982
From: Dugstad D
NORTHERN STATES POWER CO.
To:
Shared Package
ML20070Q797 List:
References
NUDOCS 8301270173
Download: ML20070Q814 (8)


Text

-

}-

OPERATING DATA REPORT DOCKET NO 50- 282 DATE _821202 COMPLETED BY Dale Dunstad

' OPERATING STATG5 -

TELEPHONE 612-388-1121

1. Unit Name:.. Prairie Island No. ~1
2. Reporting Period: November 1982
3. Licensed Thermal Power (MWt): 1650
4. Nameplate Rating (Gross MWe): 593
5. Design Electrical Rating (Net MWe): 530
6. Maximum Dependable Capacity (Gross MWe): 534 g 7. Maximum Dependable Capacity (Net MWe): 503 g 8. If Changes occur in Capacity Ratings (It. cms Number 3 Through 7) Since Last Report:

Give Reason: N/A sE _

cR-d 9. Power Level To Which Restricted, If Any (Net MWe): N/A D

7 0. Reasons for Restrictions, If Any: N/A This Month Yr-To-Date Cumulative

11. Hours [nReporcingPeriod 720 8016 78528
12. Number Of Hours Reactor Wat: Critical 359.0 7640.8 63661.9
13. Reactor Reserve Shutdown Hours 0.0 14.2 5571.1
14. Hours Generator On Line 356.5 7636.3 62431.1 c
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0

' 16. Gross Thermal Energy Generated (MWH) 493698 12269579 97487602

17. Gross Electrical Energy Generated (MWH) 165960 4021520 31601620
18. Net Electrical' Energy Generated (MWH) 153832 3780135 29564534
19. Unit Service Factor 49.5 __ 95.3 _ 79.5
20. -Unit Availability Factor _

49.5 95.3 79.5 ,

21. Unit Capacity Factor (Using MDC Nec) 42.5 93.8 74.8

-22. Unit Capacity Factor (Using D~dR Net) 40.3 ,

89.0 71.0

23. Unit Forced Outage Rate 0.0 0.2 9.5 Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each):
25. If Shut Down at End Of Report Period,' Estimated Date of Startup: Dec. 20, 1982 0301270173 821213 .

PDR ADOCK 05000282 R PDR

]

.pAILY UNIT POWER OUTPUT ~ l

. l

~

i .

" - DOCKET NO. 50-282 UNIT Prairie Island No. 1 DATE 821202 COMPLETED BY Dale Dunstad TELEPHONE 612-388- 1121 MONTil November 1982 DAY AVERACE LOAD MWe-Net DAY AVERACE LOAD MWe-Net 8

17

. cc f 1 ,

482 -5

. y. -

2 478 18 -4

~

3 469 19 -4 e

4 464 20 -4 k

.5- 451 21 -4

\

6 450 22 -5 7 439 23 -4 8 438 24 -4 1

9 421 25 -4 10 424 26 -3

11. 411 27 -3 c

12 415 28 -3

~13- 411 29 -3 14 403 30 -4

'15 320 31 16 ,

Average loads above 503 MWe-Net are due to cooler condenser circulating water.

y

v. .

.)

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET No. 50- 282 -

UNIT Prairie Island No.1 DATE 821202

. COMPLETED BY Dale Dunstad TELEPHONE 612-388- 1121 HONTH November 1982 i .4 j The-Unit was in coastdown operation until the 15th of November

" when at 2032 it was taken.off line to begin the scheduled

" Cycle 7 - 8 refueling outage. -

5 m

v

)

f

Q UNIT SHUTDOWS AND( AR REDUCTIONS d DOCKET NO. 50-282 - 5 REPORT MONTH November 1982 * * * "" '

DATE 821202 COMPLETED.BY Dale Dugstad

. TELEPHONE' 612-388-1121 a e N  % ec" a . Licensee .se o cause & Corrective Date E. .S 7 E 13 Event 35 @m Action to M %$ $ 3UN Report i EO E .E Prevent Recurrence Y$

a" 5 SEE "

a0 m A"g ,

0 We .

_ .r

. 11-15-82 S 363.5 C 2 N/A N/A N/A Refueling Outage O

a .

5 m

8

?

F: Forced Reason Method: F.xhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual st uctions for B-Maintenance or Test .2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Exa.nination Report (LER) File '

F-Administrative j (NUREG-0161)

G-Operational Error (Explain)

H-Other (Explain 5 Exhibit 1 - Same Source 8

O

[

, C

~

ir <

OPERATING DATA REPORT DOCKET NO 50-306 '

DATE 821202 COMPLETED BY nal. Dunstad

.OPERATIMG STATUS- . TELEPHONE- 612-388-1121

1. Unit Name: Prairie Island No. 2

' Notes I 2. Reporting Period: ' November 1982

'3. . Licensed Thermal Power (MWt): 1650

! 4._' Nameplate Rating (Gross MWe): 593

5. Design Electrical. Rating (Net MWe): 530
6. Markna Dependable Capacity (Gross MWe): 531

.g_ 7. -Maximum Dependable Capacity (Net MWe): 500

  • 8. .If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:

$ Give Reason: N/A c'

d g 9 .- Power Level To Which Restricted, If Any-(Net MWe)
N/A
0.-- Reasons for Restrictions, If Any
N/A -

i J

.i This Month 'Yr-To-Date Cumulative

11. Hours In Reporting Period 720 8016' 69646
12. Number Of Hours Reactor Was Critical 720.0 7130.4 59865.3
13. Reactor Rest.rve Shutdown Hours 0.0 0.0 1516.1

! . ~14. Hours Generator On Line- 720.0 7108.4 58974.5 t- s

15. Unit Raserve Shutdown Hours 0.0 0.0 0.0
16. - Gross Thermal Energy Generated (MWH) 1159335 11380873 92628058 l

! ' 17 . Gross' Electrical Energy 'Ger, crated (MWH) 386260 3710470 29771880

18. l Net Electrical Energy Generated (MWH) 364847 3484721 27885435
19. Unit, Service; Factor 100.0 88.7 84.7 20..: Unit Availability Factor 100.0 88.7 84.7

- 21., Unit Capacity Factor (Using MDC Net) 101.3 86.9 80.1 2 2. - Unit Capacity Factor (Using DER Net) 95.6 82.0 75.5 23.--Unit Forced Outage Rate 0.0 0. */ __ 5.1 Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each):  :

Refuelina July 1983 Five Weeks _

25. ~I f Shut Down at End Of Report Period, Estimated Date of ::tartup: N/A v- r-- -- * ,-- - , , , , - , - - , - , - t---- ----"A_ --r*'*F-w'"-f " '--r- - -"'--T"i-

~

T*

- T

n .

.- r '

, t 1

- ' DAILY UNIT POWER OUTPUT .

): '#

DOCKET No. 50-306 UNIT Prairie Island No. 2 DATE 821202 COMPLETED BY ~ Dale Duststad

, TELEPHONE 612-388- 1121 MONTl! November DAY AVERAGE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net n

1' 510 17 522 m

.g 2 _ 518 18 521

{e 3 521 19 524 20 523

-( 4 524 5 516 21 523 6 490 22 526 ,,' ,

7 513 23 521 8 514 24 519 9 513 25 512 10 513 26 521 11 5.12 27 513

'b 12 518 28 274 13 519 29 514

.14 470 30 499 -

15 518 31 -

16 518 s

Average loads above 500 MWe-Net are due to cooler condenser circulating water.

i ."

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 821202

. COMPLETED BY Dale Duentad TELEPHONE 612-388- 1121 HONTH' November 1982 1 The Unit was base loaded this month; no shutdowns.

.N d

a .

8 5

m

(

1 0

(j UNIT SHUTDOWS ANDL JER REDUCTIONS s' DOCKET NO. 50- n - s REPORT MONIH November 1982 ##*I*I* I" **d "

  • I DATE 821202 COMPLETED BY Dale Dugstad

. m TELEPHONE 612-388-1121 a N in ec% Licensee u Cause & Corrective Date E, 3e E 53 Event g ,$

u . En Action to N "e $ E iUE Keport # EO $ .$ Prevent Recurrence Y$

    • 5 f55 "

$0 r e E"go O o 11-6-82 S 0.0 B N/A N/A N/A N/A Axial Offset Test

[ 11-14-82 S 0.0 B N/A N/A N/A N/A Turbine Valves Tast

$ 11-23-82 S 0.0 B .N/A N/A N/A N/A Turbine Valves Test ud

p. Condenser Cleaning f

7: Forced Reason Method: Exhibit G-In-S: Scheduled A-Equipment Faibre(Explain) 1-Manual structions for B-Maintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & Licenso Examination Report (LER) File F-Administrative 1 (NUREG-0161)

G-Operational Error (Explain)

H-Other (Explain 5 Exhibit 1 - Same Source

-p_

A m.. --