OPERATING DATA REPORT DOCKET NO 50- 282 DATE _821202 COMPLETED BY Dale Dunstad TELEPHONE 612-388-1121
' OPERATING STATG5 1.
Unit Name:.. Prairie Island No. ~1 2.
Reporting Period:
November 1982 3.
Licensed Thermal Power (MWt):
1650 4.
Nameplate Rating (Gross MWe):
593 5.
Design Electrical Rating (Net MWe):
530 6.
Maximum Dependable Capacity (Gross MWe): 534 g
7.
Maximum Dependable Capacity (Net MWe): 503 g
8.
If Changes occur in Capacity Ratings (It. cms Number 3 Through 7) Since Last Report:
sE Give Reason: N/A cR-d 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A D
7 0.
Reasons for Restrictions, If Any:
N/A This Month Yr-To-Date Cumulative
- 11. Hours [nReporcingPeriod 720 8016 78528
- 12. Number Of Hours Reactor Wat: Critical 359.0 7640.8 63661.9
- 13. Reactor Reserve Shutdown Hours 0.0 14.2 5571.1
- 14. Hours Generator On Line 356.5 7636.3 62431.1 c
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
' 16. Gross Thermal Energy Generated (MWH) 493698 12269579 97487602
- 17. Gross Electrical Energy Generated (MWH) 165960 4021520 31601620 18.
Net Electrical' Energy Generated (MWH) 153832 3780135 29564534
- 19. Unit Service Factor 49.5 95.3 _
79.5
- 20. -Unit Availability Factor 49.5 95.3 79.5
- 21. Unit Capacity Factor (Using MDC Nec) 42.5 93.8 74.8
-22.
Unit Capacity Factor (Using D~dR Net) 40.3 89.0 71.0 Unit Forced Outage Rate 0.0 0.2 9.5 23.
Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each):
25.
If Shut Down at End Of Report Period,' Estimated Date of Startup: Dec. 20, 1982 0301270173 821213 PDR ADOCK 05000282 R PDR
]
.pAILY UNIT POWER OUTPUT ~
l i
~
DOCKET NO. 50-282 UNIT Prairie Island No. 1 DATE 821202 COMPLETED BY Dale Dunstad TELEPHONE 612-388-1121 MONTil November 1982 DAY AVERACE LOAD MWe-Net DAY AVERACE LOAD MWe-Net 8
f 1
482 17
-5
. cc
. y. -
2 478 18
-4
~
3 469 19
-4 e
k 4
464 20
-4
.5-451 21
-4
\\
6 450 22
-5 7
439 23
-4 8
438 24
-4 1
9 421 25
-4 10 424 26
-3 11.
411 27
-3 12 415 28
-3 c
~13-411 29
-3 14 403 30
-4
'15 320 31 16,
Average loads above 503 MWe-Net are due to cooler condenser circulating water.
y
.)
v.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET No. 50- 282 -
UNIT Prairie Island No.1 DATE 821202 COMPLETED BY Dale Dunstad TELEPHONE 612-388-1121 HONTH November 1982 i
.4
.>j The-Unit was in coastdown operation until the 15th of November when at 2032 it was taken.off line to begin the scheduled Cycle 7 - 8 refueling outage. -
5 m
- v
)
f
Q UNIT SHUTDOWS AND( AR REDUCTIONS d
DOCKET NO.
50-282 5
REPORT MONTH November 1982 DATE 821202 COMPLETED.BY Dale Dugstad
. TELEPHONE' 612-388-1121 ec" a
. Licensee
.se o
cause & Corrective a
e N
Date E.
.S 7 E
13 Event 35
@m Action to M
3UN Report i EO E.E Prevent Recurrence Y$
5 SEE a 0 a"
A"g 0
m
_.r We S
363.5 C
2 N/A N/A N/A Refueling Outage 11-15-82 Oa 5
m 8?
F: Forced Reason Method:
F.xhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual st uctions for B-Maintenance or Test
.2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Exa.nination Report (LER) File F-Administrative j
G-Operational Error (Explain)
H-Other (Explain 5
Exhibit 1 - Same Source 8
O
C
[
~
ir OPERATING DATA REPORT DOCKET NO 50-306 '
DATE 821202 COMPLETED BY nal. Dunstad TELEPHONE-612-388-1121
.OPERATIMG STATUS-1.
Unit Name:
Prairie Island No.
2 Notes I 2.
Reporting Period: ' November 1982
'3.. Licensed Thermal Power (MWt):
1650 4._' Nameplate Rating (Gross MWe):
593 5.
Design Electrical. Rating (Net MWe):
530 6.
Markna Dependable Capacity (Gross MWe): 531
.g_
- 7. -Maximum Dependable Capacity (Net MWe): 500
- 8..If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:
Give Reason:
N/A c'
- d
.- Power Level To Which Restricted, If Any-(Net MWe):
N/A 9
g 0.--
Reasons for Restrictions, If Any:
N/A J
i
.i This Month
'Yr-To-Date Cumulative
- 11. Hours In Reporting Period 720 8016' 69646
- 12. Number Of Hours Reactor Was Critical 720.0 7130.4 59865.3
- 13. Reactor Rest.rve Shutdown Hours 0.0 0.0 1516.1
. ~14.
Hours Generator On Line-720.0 7108.4 58974.5 t-s
- 15. Unit Raserve Shutdown Hours 0.0 0.0 0.0 l
- 16. - Gross Thermal Energy Generated (MWH) 1159335 11380873 92628058
' 17. Gross' Electrical Energy 'Ger, crated (MWH) 386260 3710470 29771880
- 18. l Net Electrical Energy Generated (MWH) 364847 3484721 27885435
- 19. Unit, Service; Factor 100.0 88.7 84.7 20..: Unit Availability Factor 100.0 88.7 84.7 21., Unit Capacity Factor (Using MDC Net) 101.3 86.9 80.1 2 2. - Unit Capacity Factor (Using DER Net) 95.6 82.0 75.5 23.--Unit Forced Outage Rate 0.0
- 0. */ __
5.1 Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each):
Refuelina July 1983 Five Weeks
~ f Shut Down at End Of Report Period, Estimated Date of ::tartup:
N/A 25.
I '
v-r--
irr-- - - -r t----
"A
--r*'*F-w'"-f
--r-
-"'--T"i-
~
T*
T
n
.- r '
t 1
' DAILY UNIT POWER OUTPUT
):
DOCKET No. 50-306 UNIT Prairie Island No. 2 DATE 821202 COMPLETED BY ~ Dale Duststad TELEPHONE 612-388-1121 MONTl! November DAY AVERAGE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net n
1' 510 17 522 m
.g
_ 518 18 521 2
{
3 521 19 524 e
-(
4 524 20 523 5
516 21 523 6
490 22 526 7
513 23 521 8
514 24 519 9
513 25 512 10 513 26 521 11 5.12 27 513
'b 12 518 28 274 13 519 29 514
.14 470 30 499 15 518 31 16 518 s
Average loads above 500 MWe-Net are due to cooler condenser circulating water.
i NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 821202 COMPLETED BY Dale Duentad TELEPHONE 612-388-1121 HONTH' November 1982 1
The Unit was base loaded this month; no shutdowns.
.N d
a 8
5 m
(
1 0....
(j UNIT SHUTDOWS ANDL JER REDUCTIONS s'
DOCKET NO.
50- n s
REPORT MONIH November 1982
- I*I* I" **d "
- I DATE 821202 COMPLETED BY Dale Dugstad TELEPHONE 612-388-1121 m
ec%
Licensee a
N in u
Cause & Corrective g,$
En Action to Date E,
3e E
53 Event u.
N "e $
E iUE Keport #
EO Prevent Recurrence Y$
5 f55
$0 E"g O
r e
o
- o 11-6-82 S
0.0 B
N/A N/A N/A N/A Axial Offset Test
[
11-14-82 S
0.0 B
N/A N/A N/A N/A Turbine Valves Tast 11-23-82 S
0.0 B
.N/A N/A N/A N/A Turbine Valves Test ud p.
Condenser Cleaning f
7: Forced Reason Method:
Exhibit G-In-S: Scheduled A-Equipment Faibre(Explain) 1-Manual structions for B-Maintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & Licenso Examination Report (LER) File F-Administrative 1
G-Operational Error (Explain) 5 H-Other (Explain Exhibit 1 - Same Source A
-p m..
--