Amends Commitment Date for Mods to Svc Water Pump Design,Per Insp Repts 50-313/89-30 & 50-368/89-30.Project Scoping Rept Expected to Be Completed by 900930
ML20058L293
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/31/1990
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
0CAN079014, CAN79014, NUDOCS 9008070097
Download: ML20058L293 (2)


Text

"" Ente mai:rev oa r:ii a: iac.

Route 3. Box 137G '

l Operat ns . n<es#ve rs 72aoi Tei501964 3ioo July 31, 1990.

OCAN079014-U. S. Nuclear Regulatory Commission Document Control Desk Mail Station P1-137 '

Washington, D. C. 20555

SUBJECT:

Arkansas Nuclear One - Units 1 and 2-Docket Nos. 50-313/50-368 License Nos. DPR-51 and NPF-6 '

Amended Response to Inspection Report 50-313/89-30; 50-368/89-30 Gentlemen:

Pursuant to a discussion with Mr. Tom Westerman.of the NRC Region IV staff, this letter is being submitted to revise a previous commitment at Arkansas Nuclear One. Our letter (OCAN108903) dated October 6, 1989, responded to

-violation 313/8930-01 for an inadequate procedure which had resulted in a sheared shaft on Service Water Pump P-48.- The corrective actions given in-

"the response included an evaluation of-possible modifications to-the

Service Water. Pump design to enhance _or-revise the current design, which requires venting air through the pump packing during a pumn restart. ,

This evaluation was scheduled to be completed July 1,1990. The

' Engineering Action Request was initiated and a draft Project Scoping Report (PSR) has been developed. This PSR is the design evaluation of several= items relating to Service Water Pump reliability, including-packing venting, lubrication, and cooling. However, completion of the PSR (resolving comments, assembling cost data, completing reviews, etc.) was delayed past-July 1, 1990. The Service Water Pump modifications are a '

non-outage ' activi_ty. Other preparations for the upcoming-refueling. outage 3 1R9 (scheduled for October 1990) delayed completion of-the PSR. The PSR is '

expected to be completed by September 30, 1990.

&f8070097900733 g ADOCK.05o0o31g 7

.M

~C fgG/

w N

t

').!

v 4 "* j; ; U.:ST NRC

,"'v; ?,  ; July 31,: 1990' j u

- !Page 2- '

o- ,

'If'you-have

any further questions concerning this commitment, please l
contact Mr.- James J. Fisicaro at 501-964-3228.

(Very'trul*yours, E. C. vins-

'E Generkl, Manger Assessment-

'ECE/JDJ/sgw r cc: Regiona1' Administrator

~ Region IV- .  !

U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 '

Arlington, Texas 76011_

i k

i -3 t

I s

l'

-l i

I

-j 4

t