Interim Deficiency Rept Re Possible Failure of GE Type Hfa Relays.Initially Reported on 820513.Corrective Action Not Completed.Final Rept Will Not Be Submitted Until 830430
ML20063P191
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/30/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I82-0051, W3I82-51, NUDOCS 8210130174
Download: ML20063P191 (1)


Text

I I_OUISI ANA f 44a ocLAnoNoe sinrer POWE R & LIG HT/ 7 o Box 6000

  • NEW ORLEANS. LOUISlANA 70174 * (5041 36& 2345

'u#Eu N EsYE L. V. MAURIN Vice President September 30, 1982 Nuclear Operations W3I82-0051 l Q-3-A35.07.53 rw Mr. Johr. T. Collins, Regional Administrator, Region IV l' >h7/

U. S. Nuclear Regulatory Commission

~ ~ ~ N g/ [f '}

611 Ryan Plaza Drive, Suite 1000 i, Arlington, Texas 76012 ,, g ' 4 /g , ]. ,

~.

SUBJECT:

Waterford SES Unit No. 3 !_

'N ij Docket No. 50-382 Significant Construction Deficiency Report No. 53 "Possible Failure of Genera'. Electric Tyne HFA Relays" Second Interim Report

REFERENCE:

LP6L Letter W3K-82-0274 dated May 13, 1982

Dear Mr. Collins:

! The corrective action as described in the reference above has not yet been completed. A final report will, therefore, not be submitted until April 30, 1983.

Very truly yours, htgee 4 L. V. Maurin LVM/ MAL:keh cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Ccmmission Washington, D. C. 20555 g B210130174 820930 -

PDR ADOCK 05000382 S PDR