I I_OUISI ANA f 44a ocLAnoNoe sinrer POWE R & LIG HT/ 7 o Box 6000
- NEW ORLEANS. LOUISlANA 70174 * (5041 36& 2345
'u#Eu N EsYE L. V. MAURIN Vice President September 30, 1982 Nuclear Operations W3I82-0051 l
Q-3-A35.07.53 rw
>h7/
Mr. Johr. T. Collins, Regional Administrator, Region IV l'
~ ~ ~ N g/ [f '}
U. S. Nuclear Regulatory Commission g ' 4 /g i,
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
, ].,
~.
SUBJECT:
Waterford SES Unit No. 3 ij Docket No. 50-382
'N Significant Construction Deficiency Report No. 53 "Possible Failure of Genera'. Electric Tyne HFA Relays" Second Interim Report
REFERENCE:
LP6L Letter W3K-82-0274 dated May 13, 1982
Dear Mr. Collins:
The corrective action as described in the reference above has not yet been completed. A final report will, therefore, not be submitted until April 30, 1983.
Very truly yours, htgee 4 L. V. Maurin LVM/ MAL:keh cc:
- 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- 2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Ccmmission Washington, D. C.
20555 g
B210130174 820930 PDR ADOCK 05000382 S