ML20053C180

From kanterella
Revision as of 05:41, 19 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Rept of Potentially Reportable Deficiency 78 Re Dimensional Deviation in Bolting Matl - Site Purchase Orders,Initially Reported 820419.Item Considered Nonreportable
ML20053C180
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/20/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, Q-3-A35.07, W3K-82-0289, W3K-82-289, NUDOCS 8206010552
Download: ML20053C180 (1)


Text

LOUISIANA 342 octanoNoe s1nter POWE R & LiGH T P O BOX COO 8

  • NEW ORLEANS LOUISIANA 70174 * (504) 366-2345 N0!dsh$NU May 20, 1982 G. D McLENDON Senior Vice President W3K-82-0289 Q-3-A35.07 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Connission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

Subject:

Waterford SES Unit No. 3 Docket No. 50-382 Final Report of Potentially Reportable Deficiency No. 78

" Dimensional Deviation in Bolting Material - Site Purchase Orders"

Reference:

Telecon - R. Bennett (LP&L) to L. Martin (NRC) on 4/19/82

Dear Mr. Collins:

Evaluation of the significance of Potentially Reportable Deficiency No. 78 has been completed in accordance with 10CFR50.55(e), and this item is considered nonreportable.

The results of our review are on file at the Waterford SES Unit No. 3 Site and are available for your inspection.

If you have any questions, please let us know.

Very truly yours,

. A. ht '

GDMcL/LLB/grf cc: 1) Director Office of Inspection & Enforcement x U. S. Nuclear Regulatory Commission Washington, D. C. 20555 s

2) Director Office of Management h8fp Information and Program Control i U. S. Nuclear Regulatory Commission Washington, D. C. 20555 820 6 010 T 5C2 b