ML16162A363

From kanterella
Revision as of 01:47, 19 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Revision 4 to Emergency Plan & Revised Emergency Plan Implementing Procedures,Including Procedures PT/0/B/2000/04 Re Establishment & Insp of Technical Support Ctr
ML16162A363
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/18/1982
From: Parker W
Duke Power Co
To: Stolz J, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML16162A362 List:
References
NUDOCS 8206070204
Download: ML16162A363 (2)


Text

DUKE POWER COMPANY POWER. BUDiNG 422 SOUTH CHURCH STREET, CHARLOTTE, N. C. 28242 WILLIAM 0. PARKER,JR.

VICE.PRESIOENT TELEPHONE: AREA 704 STEAM PRODUCTION May 18, 1982 a73-40s Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. J. F. Stolz, Chief Operating Reactors Branch No. 4 Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Sir:

Please find attached ten copies of the Oconee Nuclear Station Emergency Plan Manual Revision 82-4 and ten copies of the below listed procedures which should be placed in the Emergency Plan Implementation Procedures. By copy of this letter, three copies of Revision 82-4 and these Implementing Procedures are provided to NRC, Region II.

Revised Procedures Pages 1-3 of the Table of Contents Station Directive 2.9.1 Station Assembly and Evacuation Procedure PT/O/B/2000/4 Procedure for Establishment and Inspection of the Technical Support Center CP/O/A/2004/3C Post-Accident Determination of Chloride by Specific Ion Electrode Using Beckman 4500 Meter (New Procedure)

CP/O/A/2004/2E Post-Accident Determination of Boron Concentration Using Carminic Acid (New Procedure)

CP/O/A/2005/2D Post-Accident Determination of Gamma Isotopic Activity (New Procedure)

HP/O/B/1009/13 Procedure for Implementation and Verification for the Availability of a Back-up Source of Meteorological Data HP/O/B/1009/15 Procedure for Sampling and Quantifying High Level Gaseous, Radioiodine, and Particulate Radioactivity IP/O/B/1601/3 Environmental Equipment Checks Very truly yours, William 0. Parker, Jr.

JFN/php Attachments 820670204 820527 PDR ADOCK 05000269 F- PDR

Mr. Harold R. Denton, Director May 18, 1982 Page 2 cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303