ML16342A368

From kanterella
Revision as of 21:38, 18 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised MOR for July 1993 for Dcnpp Unit 1
ML16342A368
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 07/31/1993
From: Bourgo E, Stipicevich J
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML16342A366 List:
References
NUDOCS 9401250122
Download: ML16342A368 (2)


Text

OPERATING DATA REPORT DOCKET NO. 50-275 UNIT 1 DATE 01/01/94 COMPLETED BY E. Bourgo J. Stipicevich TELEPHONE (805) 545-3035/4877 OPERATING STATUS

1. Unit Name: Diablo Canyon Unit 1
2. Reporting Period: July 1993
3. Licensed Thermal Power (MWt): 3338
4. Nameplate Rating (Gross MWe): 1137
5. Design Electrical Rating (Net Mwe): 1086
6. Maximum Dependable Capacity (Gross Mwe): 1124
7. Maximum Dependable Capacity (Net MWe): 1073.4
8. Ifchanges occur in capacity ratings (items 3 through 7) since last report, give reasons: N/A
9. Power level to which restricted, if any (Net MWe): N/A
10. Reasons for restrictions, if any: N/A This Month YTD Cumulative
11. Hours In Reporting Period 5087.0 72189.3
12. Number Of Hours Reactor Was Critical 5087.0 60699.1
13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator On-Line 5087.0 59799.6
15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 16510179 188251482
17. Gross Electrical Energy Generated (MWH) 5564600 63355632
18. Net Electrical Energy Generated (MWH) 5301748 59290188
19. Unit Service Factor 100.00 82.84
20. Unit Availability Factor 100.00 82.84
21. Unit Capacity Factor (Using MDC Net) 97.09 77.55
22. Unit Capacity Factor (Using DER Net) 95.97 76.65
23. Unit Forced Outage Rate 0.00 3.19
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None.
25. If Shut Down At End Of Report Period, Estimate Date of Startup: Not applicable

'RPDR " ':"

940Xasoam 9O0W4:

ADOCK 05000275.

',".PDR~='