Request for Additional Information Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan
ML042100166
Person / Time
Site: Pilgrim
Issue date: 07/23/2004
From: Bhalchandra Vaidya
NRC/NRR/DLPM
To: Balduzzi M
Entergy Nuclear Generation Co
vaidya B, NRR/DLPM, 415-3308
References
TAC MC2956
Download: ML042100166 (5)


Text

SAFEGUARDS INFORMATION July 23, 2004 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Generation Company 600 Rocky Hill Road Plymouth, MA 02360 c/o Mr. Reginald Rose

SUBJECT:

PILGRIM NUCLEAR POWER STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RE: SAFEGUARDS CONTINGENCY PLAN AND SECTION 9.4.1 OF THE PHYSICAL SECURITY PLAN (TAC NO. MC2956)

Dear Mr. Balduzzi:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for Pilgrim Nuclear Power Station, Unit 1.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of your Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan. Please respond to the enclosed RAI within 10 days from the receipt of this letter.

If circumstances result in the need to revise the target response date, please contact me at (301) 415-3498.

Sincerely,

/RA/

Bhalchandra Vaidya, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/o encl: See next page NOTICE: The Enclosure contains Safeguards WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards Information. Upon separation from the Information is subject to Civil and Enclosure, this letter is DECONTROLLED.

Criminal Penalties SAFEGUARDS INFORMATION

July 23, 2004 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Generation Company 600 Rocky Hill Road Plymouth, MA 02360 c/o Mr. Reginald Rose

SUBJECT:

PILGRIM NUCLEAR POWER STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RE: SAFEGUARDS CONTINGENCY PLAN AND SECTION 9.4.1 OF THE PHYSICAL SECURITY PLAN (TAC NO. MC2956)

Dear Mr. Balduzzi:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for Pilgrim Nuclear Power Station, Unit 1.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of your Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan. Please respond to the enclosed RAI within 10 days from the receipt of this letter.

If circumstances result in the need to revise the target response date, please contact me at (301) 415-3498.

Sincerely,

/RA/

Bhalchandra Vaidya, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/o encl: See next page DISTRIBUTION:

SPRT R/F RidsNsirDns RidsNrrDlpm OGC ACRS T. Tate J. Clifford C. Holden C. Bixler, RI ADAMS Accession Number: ML042100166 OFFICE SPRT/NRR/PM SPRT/NRR/LA SPRT/NSIR SPRT/NRR/SC NAME BVaidya, CHawes JPeralta JNakoski DATE 7/23/04 7/22/04 7/23/04 7/23/04 OFFICIAL RECORD COPY

Pilgrim Nuclear Power Station cc:

Resident Inspector Mr. Steve Brennion U. S. Nuclear Regulatory Commission Supt., Regulatory & Industry Affairs Pilgrim Nuclear Power Station Entergy Nuclear Operations, Inc.

Post Office Box 867 Pilgrim Nuclear Power Station Plymouth, MA 02360 600 Rocky Hill Road, M/S 1 Plymouth, MA 02360-5508 Chairman, Board of Selectmen 11 Lincoln Street Mr. Jack Alexander Plymouth, MA 02360 Manager, Reg. Relations and Quality Assurance Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5599 Duxbury, MA 02332 Mr. David F. Tarantino Office of the Commissioner Nuclear Information Manager Massachusetts Department of Pilgrim Nuclear Power Station Environmental Protection 600 Rocky Hill Road One Winter Street Plymouth, MA 02360-5599 Boston, MA 02108 Ms. Jane Perlov Office of the Attorney General Secretary of Public Safety One Ashburton Place Executive Office of Public Safety 20th Floor One Ashburton Place Boston, MA 02108 Boston, MA 02108 Dr. Robert M. Hallisey, Director Mr. Stephen J. McGrail, Director Radiation Control Program Attn: James Muckerheide Commonwealth of Massachusetts Massachusetts Emergency Management Executive Offices of Health and Agency Human Services 400 Worcester Road 174 Portland Street Framingham, MA 01702-5399 Boston, MA 02114 Chairman Regional Administrator, Region I Nuclear Matters Committee U. S. Nuclear Regulatory Commission Town Hall 475 Allendale Road 11 Lincoln Street King of Prussia, PA 19406-1415 Plymouth, MA 02360 Mr. John M. Fulton Mr. William D. Meinert Assistant General Counsel Nuclear Engineer Entergy Nuclear Operations, Inc. Massachusetts Municipal Wholesale 440 Hamilton Avenue Electric Company White Plains, NY 10601 P.O. Box 426 Ludlow, MA 01056-0426

Pilgrim Nuclear Power Station Mr. Gary J. Taylor Chief Executive Officer Entergy Operations Mr. John F. McCann 1340 Echelon Parkway Director, Nuclear Safety Assurance Jackson, MS 39213 Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Mr. John T. Herron White Plains, NY 10601 Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc. Ms. Charlene D. Faison 440 Hamilton Avenue Manager, Licensing White Plains, NY 10601 Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Mr. Michael A. Balduzzi White Plains, NY 10601 Site Vice President Entergy Nuclear Operations, Inc. Mr. Michael J. Colomb Pilgrim Nuclear Power Station Director of Oversight 600 Rocky Hill Road Entergy Nuclear Operations, Inc.

Plymouth, MA 02360-5508 440 Hamilton Avenue White Plains, NY 10601 Mr. Stephen J. Bethay Director, Nuclear Assessment Senior Resident Inspector Entergy Nuclear Operations, Inc. U.S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station 600 Rocky Hill Road 600 Rocky Hill Road Plymouth, MA 02360-5508 Mail Stop 66 Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Ms. Stacey Lousteau Entergy Nuclear Operations, Inc. Treasury Department Pilgrim Nuclear Power Station Entergy Services, Inc.

600 Rocky Hill Road 639 Loyola Avenue Plymouth, MA 02360-5508 New Orleans, LA 70113 Mr. Danny L. Pace Jim Sniezek Vice President, Engineering 5486 Nithsdale Drive Entergy Nuclear Operations, Inc. Salisbury, MD 21801 440 Hamilton Avenue White Plains, NY 10601 Mr. Kennety L. Graesser 38832 N. Ashley Drive Mr. Brian OGrady Lake Villa, IL 60046 Vice President, Operations Support Entergy Nuclear Operations, Inc. Mr. Ronald Toole 440 Hamilton Avenue 1282 Valley of Lakes White Plains, NY 10601 Box R-10 Hazelton, PA 18202 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue

SAFEGUARDS INFORMATION White Plains, NY 10601 SAFEGUARDS INFORMATION