I in Entergy Nuclear Operations, Inc.

'-EnterIgy Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 August 19, 2004 Via Overnight Delivery Attention: Document Control Desk U. S. Nuclear Regulatory Commission Mail Station O-P1-17 Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Supplemental Response to Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan RAls (TAC No.

MC2956)

REFERENCES:

1. NRC Letter to Mr. Michael A. Balduzzi, Request for Additional Information RE: Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC NO. MC2956), dated July 23, 2004
2. Entergy Letter 2.04.072, Response Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan RAls, dated August 12, 2004 LETTER NUMBER: 2.04.073 Entergy Nuclear Operations, Inc. (ENO), Pilgrim Nuclear Power Station (PNPS) is in receipt of your requests for additional information (RAls) (Reference 1). Our initial response to these RAls (Reference 2) identified two RAls for which we needed additional time to prepare thorough site-specific responses.

This letter updates our response to those RAls with the site-specific detail. Each RAI for which we are updating our response is identified by the Safeguards Contingency Plan (SCP) Section referenced in the original RAI.

This letter contains no new commitments. Revised plan pages will be submitted when all RAI questions are resolved as noted in Reference 2.

If you have any questions or require additional information, please contact Mr. Bryan Ford at (508) 830-8403.

NOTICE: ATTACHMENT 1 CONTAINS 'SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER BECOMES "DECONTROLLED."

% )SI(O*

Entergy Nuclear Operations, Inc. Letter Number: 2.04.073 Pilgrim Station Page 2 of 2 In accordance with 10 CFR § 2.202(b), the following affirmation is provided:

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 19 day of August 2004.

Respectfully submitted, 45Egod Eric Olson Manager, Operations MJG/dm Attachments:

1. Supplemental Response to Request for Information Re: Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC NO. MC2956) to the April 29, 2003, Order cc: w/o Attachments Mr. Lee Licata, Project Manager Mr. Samuel J. Collins Office of Nuclear Reactor Regulation Regional Administrator, Region 1 Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 475 Allendale Road 1 White Flint North King of Prussia, PA 19406 11555 Rockville Pike Rockville, MD 20852 Mr. Bhalchandra K. Vaidya, Project Manager Senior Resident Inspector Security Plan Review Team Pilgrim Nuclear Power Station Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 8-B2 Washington, D.C. 20555-0001 NOTICE: ATTACHMENT 1 CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER BECOMES "DECONTROLLED."