Request for Additional Information to Support the Review of Pilgrim Nuclear Power Station Cyber Security Plan (Id: 2.10.034)
ML110610187
Person / Time
Site: Pilgrim
Issue date: 03/03/2011
From: Richard Guzman
Plant Licensing Branch 1
To:
Entergy Nuclear Operations
Guzman R, NRR/DORL, 415-1030
References
TAC ME4351
Download: ML110610187 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 3, 2011 Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION TO SUPPORT THE REVIEW OF PILGRIM NUCLEAR POWER STATION CYBER SECURITY PLAN (ID: 2.10.034) (TAC NO. ME4351)

Dear Sir or Madam:

By letter dated July 15, 2010 (Agencywide Documents Access and Management System, Accession No. ML101970359), as supplemented by letter dated February 15, 2011 (ADAMS Accession No. ML110540330), Entergy Nuclear Operations, Inc. (the licensee) resubmitted a request to amend the Facility Operating License (No. DPR-35) for Pilgrim Nuclear Power Station (PNPS). Per the proposed license amendment, the licensee requested approval of the PNPS Cyber Security Plan (CSP), provided a proposed CSP Implementation Schedule, and included a proposed revision to the Facility Operating License to incorporate the provisions for implementing and maintaining in effect the provisions of the approved CSP. The licensee's amendment request was based on a generic template developed by the Nuclear Energy Institute in concert with the industry.

The Nuclear Regulatory Commission (NRC) staff is reviewing the CSP and the proposed CSP Implementation Schedule and has determined that additional information is required to complete its technical review. A supplemental request for additional information is included as an Enclosure and was reviewed in accordance with the guidance provided in Title 10 of the Code of Federal Regulations Section 2.390, and the NRC staff has determined that no security-related or proprietary information is contained therein. A response to this RAI is requested to be provided by April 4, 2011.

Please contact me at (301) 415-1030 if you have any questions.

Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION (RAI)

REGARDING LICENSE AMENDMENT REQUEST FOR THE CYBER SECURITY PLAN ENTERGY NUCLEAR OPERATIONS, INC.

PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 RAI 1: Records Retention Title 10 of the Code of Federal Regulations (10 CFR) Section 73.54(c)(2) requires licensees to design a cyber security program to ensure the capability to detect, respond to, and recover from cyber attacks. Furthermore, 10 CFR 73.54(e)(2)(i) requires licensees to maintain a Cyber Security Plan (CSP) that describes how. the licensee will maintain the capability for timely detection and response to cyber attacks. The ability for a licensee to detect and respond to cyber attacks requires accurate and complete records and is further supported by 10 CFR 73.54(h), which states that the licensee shall retain all records and supporting technical documentation required to satisfy the requirements of 10 CFR 73.54 as a record until the Commission terminates the license for which the records were developed, and shall maintain superseded portions of these records for at least 3 years after the record is superseded, unless otherwise specified by the Commission.

The licensee's CSP in Section 4.13 states that Critical Digital Asset (CDA) audit records and audit data (e.g., operating system logs, network device logs) are retained for a period of time that is less than what is required by 10 CFR 73.54(h).

Explain the deviation from the 10 CFR 73.54(h) requirement to retain records and supporting technical documentation until the Commission terminates the license (or to maintain superseded portions of these records for at least 3 years) and how that meets the requirements of 10 CFR 73.54.

RAI 2: Implementation Schedule The regulation at 10 CFR 73.54, " Protection of digital computer and communication systems and networks," requires licensees to submit a CSP that satisfies the requirements of this section for Commission review and approval. Furthermore, each submittal must include a proposed implementation schedule and the implementation of the licensee's cyber security program must be consistent with the approved schedule. 10 CFR 73.54(a) requires licensees to provide high assurance that digital computer and communication systems and networks are adequately protected against cyber attacks, up to and including the design-basis threat (DBT). The completion of several key intermediate milestones (Items (a) through (g) below) would demonstrate progress toward meeting the requirements of 10 CFR 73.54. The Nuclear Regulatory Commission (NRC) staff s expectation is that the key intermediate milestones will be completed in a timely manner, but no later than December 31, 2012. The key CSP implementation milestones are as follows:

Enclosure

-2 (a) Establish, train and qualify Cyber Security Assessment Team, as described in Section 3.1.2, "Cyber Security Assessment Team," of the CSP.

(b) Identify Critical Systems and CDAs, as described in Section 3.1.3, "Identification of Critical Digital Assets," of the CSP.

(c) Implement cyber security defense-in-depth architecture by installation of deterministic one-way devices, as described in Section 4.3, "Defense-In-Depth Protective Strategies" of the CSP.

(d) Implement the management, operational and technical cyber security controls that address attacks promulgated by use of portable media, portable devices, and portable equipment as described in Appendix D Section 1.19 "Access Control for Portable and Mobile Devices," of Nuclear Energy Institute (NEI) 08-09, Revision 6.

(e) Implement observation and identification of obvious cyber related tampering to existing insider mitigation rounds as described in Appendix E Section 4.3, "Personnel Performing Maintenance and Testing Activities," and Appendix E Section 10.3, "Baseline Configuration" of NEI 08-09, Revision 6.

(f) Identify, document, and implement cyber security controls to physical security target set CDAs in accordance with Section 3.1.6, "Mitigation of Vulnerabilities and Application of Cyber Security Controls," of the CSP.

(g) Ongoing monitoring and assessment activities will commence for those target set CDAs whose security controls have been implemented, as described in Section 4A, "Ongoing Monitoring and Assessment," of the CSP.

(h) Full implementation of the CSP for all safety, security, and emergency preparedness functions.

Provide a revised CSP implementation schedule that identifies the appropriate milestones, completion dates, supporting rationale, and level of detail to allow the NRC to evaluate the licensee's proposed schedule and associated milestone dates which include the final completion date. It is the NRC's intention to develop a license condition incorporating your revised CSP implementation schedule containing the key milestone dates.

RAI3: Scope of Systems Paragraph 73.54(a} of 10 CFR requires licensees to provide high assurance that digital computer and communication systems and networks are adequately protected against cyber attacks, up to and including the DBT as described in 10 CFR 73.1. In addition, 10 CFR 73.54(a}(1} states that the licensee shall protect digital computer and communication systems and networks associated with:

-3 (i) Safety-related and important-to-safety functions; (ii) Security functions; (iii) Emergency preparedness functions, including offsite communications; and (iv) Support systems and equipment which, if compromised, would adversely impact safety, security, or emergency preparedness functions.

Subsequent to the issuance of the cyber security rule, the NRC stated that 10 CFR 73.54 should be interpreted to include structures, systems, and components (SSCs) in the balance of plant (BOP) that have a nexus to radiological health and safety (Agencywide Documents Access and Management System (ADAMS) Accession No. ML103490344, dated November 19,2010). The SSCs in the BOP are those that could directly or indirectly affect reactivity of a nuclear power plant and could result in an unplanned reactor shutdown or transient and are therefore, within the scope of important-to-safety functions described in 10 CFR 73.54(a)(1). Furthermore, the NRC issued a letter to NEI dated January 5, 2011 (ADAMS Accession No. ML103550480) that provided licensees with additional guidance on one acceptable approach to comply with the Commission's policy determination.

Explain how the scoping of systems provided by licensee's CSP meets the requirements of 10 CFR 73.54 and the additional guidance provided by the NRC.

March 3, 2011 Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION TO SUPPORT THE REVIEW OF PILGRIM NUCLEAR POWER STATION CYBER SECURITY PLAN (lD: 2.10.034) (TAC NO. ME4351)

Dear Sir or Madam:

By letter dated July 15, 2010 (Agencywide Documents Access and Management System, Accession No. ML101970359), as supplemented by letter dated February 15, 2011 (ADAMS Accession No. ML110540330), Entergy Nuclear Operations, Inc. (the licensee) resubmitted a request to amend the Facility Operating License (No. DPR-35) for Pilgrim Nuclear Power Station (PNPS). Per the proposed license amendment, the licensee requested approval of the PNPS Cyber Security Plan (CSP), provided a proposed CSP Implementation Schedule, and included a proposed revision to the Facility Operating License to incorporate the provisions for implementing and maintaining in effect the provisions of the approved CSP. The licensee's amendment request was based on a generic template developed by the Nuclear Energy Institute in concert with the industry.

The Nuclear Regulatory Commission (NRC) staff is reviewing the CSP and the proposed CSP Implementation Schedule and has determined that additional information is required to complete its technical review. A supplemental request for additional information is included as an Enclosure and was reviewed in accordance with the guidance provided in Title 10 of the Code of Federal Regulations Section 2.390, and the NRC staff has determined that no security-related or proprietary information is contained therein. A response to this RAI is requested to be provided by February 15, 2011.

Please contact me at (301) 415-1030 if you have any questions.

Sincerely, Ira!

Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDorlLpl1-1 Resource RidsRgn1 MailCenter RidsOGCMailCenter RidsNrrLASLittle RidsNsirDsp Resource RidsNrrPMPilgrim RidsNrrDorlDpr PPederson RidsAcrsAcnw_MailCenter Resource ADAMSACCESSION NUMBER : ML110610187

  • RAI provl'd ed by memo. No substantial changes made.

OFFICE LPL1-1/PM LPL1-1/LA NSIRfDSP/ISCPB/BC* LPL 1-1/BC NAME RGuzman SUttle CErlanger NSalgado DATE 3/2/11 3/2/11 02118/11 313/11 OFFICIAL RECORD COpy