ML23300A002

From kanterella
Jump to navigation Jump to search
10 CFR 72.48 Biennial Change Summary Report
ML23300A002
Person / Time
Site: Pilgrim
Issue date: 10/27/2023
From: Noval W
Holtec Decommissioning International
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
HDI-PIL-23-011
Download: ML23300A002 (1)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

10 CFR 72.48(d)(2)

October 27, 2023

Attn: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Pilgrim Nuclear Power Station Renewed License No. DPR-35 NRC Docket Nos. 50-293 & 72-1044

Subject:

10 CFR 72.48 Biennial Change Summary Report

References:

In accordance with Title 10 Code of Federal Regulations (CFR) 72.48(d)(2), Pilgrim Nuclear Power Station (PNPS) is submitting the biennial change summary report addressing activities that have been implemented at the facility for the period of October 1, 2021, through September 30, 2023.

There were no site generated 72.48 evaluations completed by the station during the reporting period.

This letter contains no regulatory commitments.

If you have any questions or need further information, please contact Dave Noyes at 508 830-7826 or me at (856) 797-0900, ext. 3587.

Respectfully,

William Noval Director, Regulatory Affairs Holtec Decommissioning International, LLC

cc:

NRC Regional Administrator, Region 1 NRC NRR Project Manager - Pilgrim

HDI-PIL-23-011 Page 1 of 1