'Entergy Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Michael A. Balduzzi Site Vice President August 3, 2004 Via Overnight Delivery Attention: Document Control Desk U. S. Nuclear Regulatory Commission Mail Station O-Pl-17 Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Amended Responses to Security Plan RAls Sections 1-19 (TAC No. MC2956)

REFERENCES:

1. Entergy Letter 2.04.058, Response to Request for Additional Information Re: Security Plan Sections 10-19 (TAC No. MC2956),

dated July 8, 2004

2. Entergy Letter 2.04.060, Response to Security Plan RAls Sections 1-9 (TAC No. MC2956), dated July 13, 2004
3. NEI Working Group Disposition of Physical Security Plan Generic RAls, dated July 16, 2004
4. Revision 1 of NEI Security Working Group Disposition of Physical Plan Generic RAls dated July 23, 2004.

LETTER NUMBER: 2.04.64

Dear Sir or Madam:

Enclosed, please find Pilgrim Nuclear Power Station (PNPS) amended responses to specific questions contained in the requests for additional information (RAls) (Reference 1 & 2) as discussed in a telephone conference with the NRC staff.

For selected RAls (indicated with an

  • in Attachment 1), ENO has adopted the language that was agreed upon between the industry Security Working Group (SWG) licensee representative and the NRC Staff (Reference 3).

Commitments made by PNPS in this letter are listed in Attachment 2.

If you have any questions or require additional information, please contact Mr. Bryan Ford at 0 (508) 830-8403.

NOTICE: ATTACHMENT 1 CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE \

PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER AND ATTACHMENT 2 BECOME "DECONTROLLED."

- Entergy Nuclear Operations, Inc. Letter Number: 2.04.064 Pilgrim Station Page 2 of 2 In accordance with 10 CFR § 2.202(b), the following affirmation is provided:

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 3rd day of August 2004.

Respectfully submitted, Michael A. Balduzzi Site Vice President, PNPS MJG/dm Attachments:

1. Amended Responses to Security Plan RAls Sections 1-19 (TAC No. MC2956)
2. List of Regulatory Commitments cc: w/o Attachments Mr. Lee Licata, Project Manager Mr. Samuel J. Collins Office of Nuclear Reactor Regulation Regional Administrator, Region 1 Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 475 Allendale Road 1 White Flint North King of Prussia, PA 19406 11555 Rockville Pike Rockville, MD 20852 Mr. Bhalchandra K. Vaidya, Project Manager Senior Resident Inspector Security Plan Review Team Pilgrim Nuclear Power Station Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 8-B2 Washington, D.C. 20555-0001 NOTICE: ATTACHMENT 1 CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER AND ATTACHMENT 2 BECOME "DECONTROLLED."