ML042590046

From kanterella
Jump to navigation Jump to search

Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station Submittal of Revision to Security Plan, Training and Qualification Plan, and Safeguards Contingency Plans Incorporating RAI Responses
ML042590046
Person / Time
Site: Pilgrim
Issue date: 09/09/2004
From: Peter Dietrich
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.04.081, TAC MC2956
Download: ML042590046 (3)


Text

Entergy EtryNuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 September 9, 2004 Via Overnight Delivery Attention: Document Control Desk U. S. Nuclear Regulatory Commission Mail Station O-P1 -17 Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Submittal of Revision to Security Plan, Training and qualification Plan, and Safeguards Contingency Plans Incorporating RAI Responses

REFERENCES:

1. NRC Letter to Mr. Michael A. Balduzzi, Request for Additional Information Re: Security Plan Sections 10-19 (TAC NO. MC2956), dated June 21, 2004
2. NRC Letter to Mr. Michael A. Balduzzi, Request for Additional Information RE: Security Plan Sections 1-9 (TAC NO. MC2956), dated June 25, 2004
3. NRC Letter to Mr. Michael A. Balduzzi, Request for Additional Information RE: Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC NO. MC2956),

dated July 23, 2004

4. Entergy Letter 2.04.058 to NRC, Response to Request for Additional Information Re: Security Plan Sections 10-19 (TAC NO. MC2956), dated July 8, 2004
5. Entergy Letter 2.04.060 to NRC, Response to Security Plan RAls Sections 1-9 (TAC NO. MC2956), dated July 13, 2004
6. Entergy Letter 2.04.065 to NRC, Response to Training and Qualification Plan RAls (TAC NO. MC2956),

dated July 27, 2004

7. Entergy Letter 2.04.072 to NRC, Response Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan RAls (TAC NO. MC2956), dated August 12, 2004
8. NRC Letter (N. Diaz) to NEI (J. Colvin), Position on Vehicle Searches and Spent Fuel Sabotage, dated August 6, 2004
9. Entergy Letter 2.04.030 to NRC, Supplemental Response to Issuance of orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-For-Duty, dated April 29, 2004 NOTICE: ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENTS 1 AND 2 FROM THIS LETTER, THIS LETTER BECOMES "DECONTROLLED."

Entergy Nuclear Operations, Inc. Letter Number: 2.04.081 Pilgrim Station Page 2 of 3

10. Entergy Letter 2.03.080 to NRC, Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-For-Duty, dated June 3, 2004 LETTER NUMBER: 2.04.081

Dear Sir or Madam:

Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station's (PNPS) above referenced letters (References 4-7) provided Entergy's combined responses to NRC requests for additional information on the April 29, 2004 Security Plan (Reference 9) submitted as required by Order EA-03-086. As committed in each of those submittals, this letter provides the revised Security Plan documents on CD ROM that incorporate all of our required RAI responses by September 9, 2004.

In order to standardize our fleet approach with the NRC-approved industry approach, Entergy's responses to Order EA-03-086 and requests for additional information were strictly based on NEI-03-12, 'Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan" Revision 1 and subsequent guidance provided by NEI and approved by the NRC staff. Editorial corrections were made where appropriate that were consistent with NRC guidance dated August 12, 2004; the sections affected are listed in Attachment 1.

This letter includes no new commitments.

As requested, the attachment to this letter is being transmitted on CD-ROM.

Contact Name: Bryan S. Ford Mailing Address: Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 E-Mail Address: Bford~enterpv.com Phone Number: (508) 830-8403 Document Components:

001 Transmittal Letter.pdf 49,700 bytes 002 Security Plan.pdf 1,603,600 bytes 003 Figure 201.pdf 77,820 bytes 004 Figure 20.2.pdf 759,800 bytes NOTICE: ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENTS 1 AND 2 FROM THIS LETTER, THIS LETTER BECOMES 'DECONTROLLED."

, Entergy Nuclear Operations, Inc. Letter Number: 2.04.081 Pilgrim Station Page 3 of 3 that the foregoing is true and correct. Executed on the MJG/dm

Attachment:

1. Listing of Sections in the Security Plan Containing Editorial Corrections
2. Revision to Security Plan, Training and Qualification Plan, and Safeguards Contingency Plans Incorporating RAI Responses cc: w/o Attachments Mr. Lee Licata, Project Manager Mr. Samuel J. Collins Office of Nuclear Reactor Regulation Regional Administrator, Region 1 Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 475 Allendale Road 1 White Flint North King of Prussia, PA 19406 11555 Rockville Pike Rockville, MD 20852 Mr. Bhalchandra K. Vaidya. Project Manager Senior Resident Inspector Security Plan Review Team Pilgrim Nuclear Power Station Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 8-B2 Washington, D.C. 20555-0001 NOTICE: ATTACHMENTS 1 AND 2 CONTAIN 'SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENTS 1 AND 2 FROM THIS LETTER, THIS LETTER BECOMES "DECONTROLLED."