Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road En tergy Plymouth, MA 02360 Tel 508 830 8899 Pete Dietrich General Manager Plant Operations July 27, 2004 Via Overnight Delivery Attention: Document Control Desk U. S. Nuclear Regulatory Commission Mail Station O-Pl-17 Washington, D.C. 20555-0001
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Response to Training and Qualification RAls 9 (TAC No. MC2956)
REFERENCES:
- 1. Letter 1.04.059 to Mr. Michael A. Balduzzi, Entergy Nuclear
,Generation Company (PNPS) - Request for Additional Information RE: Training and Qualification Plan (TAC NO. MC2956), dated July 9, 2004 LETTER NUMBER:
2.04.065
Dear Sir or Madam:
Entergy Nuclear Operations, Inc. (ENO), Pilgrim Nuclear Power Station (PNPS) is in receipt of the NRC letter containing requests for additional information (RAls) (Reference 1). In order to standardize our approach with the NRC-approved industry approach, ENO's April 29, 2004 responses to Order EA-03-086 were based on NEI-03-12, 'Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan" Revision 1, as approved by the staff in a letter from Roy P. Zimmerman to Steven D. Floyd dated June 10, 2004.
The NRC RAls either request modifications to the template language (indicated with an
- in ) or to licensee-provided details (i.e., bracketed template information). Where template language is involved, ENO will adopt revised language once agreement has been reached between the industry Security Working Group (SWG) licensee representatives and the NRC staff. We believe this approach will be the most responsive and will maintain mutually desired consistency. For selected RAls, ENO intends to adopt the language that is deemed acceptable to the Commission and responsive to the NRC issues following the industry security frequently asked question (SFAQ) process and the final disposition of any industry appeals.
Responses that rely on this process are discussed in the specific RAI responses. We believe that sufficient detail is provided here to enable the staff to conclude the issue can be appropriately resolved subject to SWG and NRC staff agreements and later submittal of changed pages incorporating known acceptable language (i.e., a revision of the Security Plan that incorporates all responses). ENO will provide a revised Security Plan orreplacement pages that incorporate all of our RAI responses on a schedule to be determined with the staff.
NOTICE: ATTACHMENT 1 CONTAINS USAFEGUARDS INFORMATIONW AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER AND ATTACHMENT 2 BECOME "DECONTROLLED."
p/2(MO
Entergy Nuclear Operations, Inc.
Letter Number: 2.04.065 Pilgrim Station Page 2 of 2 Commitments made by PNPS in this letter are listed in Attachment 2.
If you have any questions or require additional information, please contact Mr. Bryan Ford at (508) 830-8403.
In accordance with 10 CFR § 2.202(b), the following affirmation is provided:
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 27th day of July 2004.
MJG/dm Attachments:
- 1.
Response to Request for Information Re: Security Training and Qualification Plan (TAC NO. MC2956) to the April 29, 2003, Order
- 2.
List of Regulatory Commitments cc:
w/o Attachments Mr. Lee Licata, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 Senior Resident Inspector Pilgrim Nuclear Power Station Mr. Samuel J. Collins Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Bhalchandra K. Vaidya. Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 8-B2 Washington, D.C. 20555-0001 NOTICE: ATTACHMENT 1 CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER AND ATTACHMENT 2 BECOME "DECONTROLLED."