Letter Sequence RAI |
---|
|
|
MONTHYEARNG-17-0042, Fifth Inservice Inspection Interval Program Plan2017-03-0707 March 2017 Fifth Inservice Inspection Interval Program Plan Project stage: Other ML17112A0492017-04-21021 April 2017 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center - Relief Request No. RR-03 - Alternative Requirements for Nozzle Inner Radius and Nozzle-To-Shell Welds - CAC No. MF9374 Project stage: Acceptance Review ML17220A3332017-08-0808 August 2017 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center - Relief Request No. RR-03 - Alternative Requirements for Nozzle Inner Radius and Nozzle-To-Shell Welds - CAC No. MF9374 Project stage: RAI NG-17-0241, Supplemental Response to Request for Additional Information, Fifth Inservice Inspection Interval Program Plan, Relief Request RR-032017-12-0707 December 2017 Supplemental Response to Request for Additional Information, Fifth Inservice Inspection Interval Program Plan, Relief Request RR-03 Project stage: Supplement ML18005A5422018-01-0505 January 2018 NRR E-mail Capture - Second Round of RAI for DAEC Fifth Inservice Inspection Interval Program Plan, Relief Request RR-03 - EPID: L-2017-LLR-0110 Project stage: RAI NG-18-0013, Response to Second Request for Additional Information, Fifth Inservice Inspection Lnterval Program Plan, Relief Request RR-032018-01-26026 January 2018 Response to Second Request for Additional Information, Fifth Inservice Inspection Lnterval Program Plan, Relief Request RR-03 Project stage: Request NG-18-0036, Supplemental Information, Fifth Inservice Inspection Interval Program Plan, Relief Request RR-032018-03-27027 March 2018 Supplemental Information, Fifth Inservice Inspection Interval Program Plan, Relief Request RR-03 Project stage: Supplement ML18053A2092018-04-16016 April 2018 Request for Relief No. 03 Proposed Use of Alternative Requirements for Nozzle Inner Radius and Nozzle-to-Shell Weld Inspection for Fifth Inservice Inspection Interval (CAC No. MF9374; EPID L-2017-LLR-0110) Project stage: Other 2017-08-08
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtecs Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. Obrien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML21223A2422021-08-16016 August 2021 Enclosure - Pilgrim Nuclear Power Station - Request for Additional Information Regarding Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Plan ML21161A1072021-07-0909 July 2021 Request for Additional Information Regarding Pilgrim License Amendment Request ISFSI Only Emergency Plan ML21013A5232021-01-15015 January 2021 Request for Additional Information Regarding the Request to Change the Physical Security Plan - Alternative Measures ML20297A2382020-10-22022 October 2020 Fleet DQAP RAIs - Enclosure ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20142A2422020-05-26026 May 2020 Acceptance of Requested Licensing Action Physical Security Plan Revision and License Amendment Request to Incorporate Additional Independent Spent Fuel Storage Installation with Requests for Additional Information ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19086A3492019-03-21021 March 2019 NRR E-mail Capture - Pilgrim Power Station - Request for Additional Information Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment (EPID: L-2018-LL0-0003) ML19036A6512019-02-0404 February 2019 NRR E-mail Capture - RAI - Pilgrim EP Exemption ML18320A1292018-11-16016 November 2018 NRR E-mail Capture - Request for Additional Information (RAI) - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML18323A1192018-11-15015 November 2018 CAL 5 Document Request #2 ML18317A2202018-11-11011 November 2018 NRR E-mail Capture - (External_Sender) Questions and Comments Regarding Pilgrim EP Exemption RAI, October 16, 2018 ML18317A2192018-11-0808 November 2018 NRR E-mail Capture - (External_Sender) RAI EP 11.06.18-Question ML18310A0212018-11-0606 November 2018 NRR E-mail Capture - RAI - Pilgrim EP Exemption ML18289A4072018-10-16016 October 2018 NRR E-mail Capture - RAIs - Pilgrim EP Exemption ML18285A8182018-10-12012 October 2018 NRR E-mail Capture - for Your Action: RAIs - Pilgrim - LAR - EP and EAL Scheme to Address Permanently Defueled Condition ML18124A1392018-05-0404 May 2018 NRR E-mail Capture - RAI - Pilgrim ERO Staffing License Amendment Request ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML18005A5422018-01-0505 January 2018 NRR E-mail Capture - Second Round of RAI for DAEC Fifth Inservice Inspection Interval Program Plan, Relief Request RR-03 - EPID: L-2017-LLR-0110 ML16347A0042016-12-0909 December 2016 NRR E-mail Capture - Pilgrim: Request for Additional Information for Relief Requests on Volumetric Exam Requirements, PNPS-ISI-001, 002 and 003 ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15211A6612015-07-30030 July 2015 Licensed Operator Positive Fitness-For-Duty-Test ML15051A0322015-02-25025 February 2015 Request for Additional Information Regarding the Safety Limit Minimum Critical Power Ratio License Amendment Request ML14342A0942014-12-17017 December 2014 Request for Additional Information Regarding Relief Request PRR-24, Nozzle-to-Vessel Welds and Nozzle Inner Radii Examinations ML14042A0432014-02-18018 February 2014 Request for Additional Information Regarding Safety Limits to Resolve Pressure Regulator Fail-Open Transient License Amendment Request ML13333A9102013-12-0505 December 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool ins ML13323B4702013-11-25025 November 2013 Request for Additional Information Regarding Relief Request PRR-22 ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13179A4622013-07-0505 July 2013 Entergy Nuclear Operations, Inc., Decommissioning Funding Status Report Request for Additional Information Regarding the Decommissioning Funding Status Report ML13182A4252013-07-0101 July 2013 Request for Additional Information E-mail from R.Guzman to W.Lobo PR-03 and PR-05 Fifth Ten-Year Inservice Testing (IST) Program ML13165A2762013-06-20020 June 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (NRC Order EA-12-051) ML12278A3862012-10-0404 October 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford, Request for Additional Information, Round 2, Amendment Request to Revise QA Program Manual and Staff Qualification TSs ML1209604492012-04-0505 April 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Request for Additional Information, Revise Quality Assurance Program Manual and Staff Qualification Technical Specificat ML1208601472012-03-26026 March 2012 Request for Additional Information - Pilgrim Nuclear Power Station Revision to Condensate Storage Tank Low Level Trip Setpoint ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML1132502282011-11-22022 November 2011 Request for Additional Information, Relief Request No. PRR-21 ML1132202342011-11-21021 November 2011 Request for Additional Information 60-Day Response to Bulletin 2011-01, Mitigating Strategies, ML1114402342011-05-25025 May 2011 Request for Additional Information to Support the Review of 2011 Decommissioning Funding Status Report ML1108202082011-04-11011 April 2011 Summary of Telephone Conference Call Held on March 23, 2011, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1106101872011-03-0303 March 2011 Request for Additional Information to Support the Review of Pilgrim Nuclear Power Station Cyber Security Plan (Id: 2.10.034) ML1105403302011-02-15015 February 2011 Response to Request for Additional Information (Rai), Dated January 5, 2011 on the Cyber Security Plan ML1100900272011-01-10010 January 2011 Request for Additional Information Revision to TS for Setpoint and Setpoint Tolerance Increase for Safety Relief Valves and Spring Safety Valves, and Related Changes (ME3543) ML1034105062011-01-0707 January 2011 December 1, 2010, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application 2021-08-16
[Table view] |
Text
NRR-DMPSPEm Resource From: Chawla, Mahesh Sent: Friday, January 05, 2018 11:29 AM To: laura.swenzinski@nexteraenergy.com; Davis, J.Michael (J.Michael.Davis@nexteraenergy.com); Murrell, Bob (Bob.Murrell@nexteraenergy.com)
Cc: Kilby, Gary; Catron, Steve (Steve.Catron@fpl.com)
Subject:
Second Round of RAI for DAEC Fifth Inservice Inspection Interval Program Plan, Relief Request RR EPID: L-2017-LLR-0110 By letter dated March 7, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17069A172), NextEra Energy Duane Arnold, LLC (NextEra, the licensee) submitted the fifth inservice inspection (ISI) interval program plan for Duane Arnold Energy Center (DAEC) for the U.S. Nuclear Regulatory Commission (NRC) review and approval. The program plan contains several relief requests from certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, requirements. Among them, Relief Request RR-03 proposed to use an alternative based on ASME Code Case N-702, Alternative Requirements for Boiling Water Reactor (BWR) Nozzle Inner Radius and Nozzle-to-Shell Welds, for inspection of reactor pressure vessel (RPV) nozzle inner radius and nozzle-to-shell welds at DAEC.
Background
On October 26, 2017 (ADAMS Accession No. ML17300A195), the licensee provided response to the NRC staffs request for additional information (RAI), sent via an email dated August 8, 2017 (ADAMS Accession No. ML17220A333). The NRC staff reviewed the RAI response and determined that additional information was required to complete the response. On November 7, 2017, a teleconference was held between the NRC staff and the NextEra representatives to discuss the needed information. As a result, on December 7, 2017 (ADAMS Accession No. ML17341A852), the licensee provided supplemental response to the original RAI. The NRC staff has reviewed this supplemental response and found four issues with the licensees supplemental response:
- The response states that there are no acceptance criteria for probability of failure (PoF) due to normal operation. The NRC staff noted that the acceptance criteria for PoF due to normal operation was established in the safety evaluation (SE) for the Boiling Water Reactor Vessel Internals Project (BWRVIP) report, BWRVIP-108, Technical Basis for the Reduction of Inspection Requirements for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii, (ADAMS Accession No. ML073600374).
- The response states that linear elastic fracture mechanics (LEFM) is overly conservative for vessel material behavior at normal operating temperatures, and the number reported in the BWRVIP-108 SE for normal operation PoF was used for comparative purposes only. The NRC staff noted that normal operation includes heatup, cooldown, and hydro/pressure test, covering the entire temperature range.
Therefore, using LEFM is appropriate. Further, the supplemental response by Boiling Water Reactor Vessel Internals Project (BWRVIP) in letter dated September 13, 2007 (ML072600167) to support BWRVIP-108 contains PoF values for both the normal operating condition and the low-temperature overpressure (LTOP) condition for all simulation cases without emphasizing one condition. Therefore, during the BWRVIP-108 review, the BWRVIP and the NRC treated both normal operation condition and LTOP condition equally.
- The response states that the PoF due to normal operation is irrelevant because when the plant stays within the required pressure-temperature (P-T) curve limits the regulatory required margin to failure is met. The NRC staff noted that the P-T limit or pressurized thermal shock (PTS) requirements are completely separated from the ASME inspection requirements. A plant meeting the P-T limit (BWRs and PWRs) or PTS (PWRs) requirements still needs to perform ASME Code required inspections. The 1
inspection alternative proposed in BWRVIP-108 was based on the probabilistic fracture mechanics (PFM) results for the normal and LTOP conditions. Therefore, the PoF due to normal operation is essential information for the NRC staffs evaluation.
- The response implied that conditional PoF is more relevant in this evaluation. In the risk evaluation, the NRC staff always considers the event frequency and the conditional PoF. If the event frequency is zero, then the value of conditional PoF is meaningless. Both were considered by the BWRVIP and the NRC staff during the BWRVIP-108 review.
Hence, the NRC staff determined that the following follow-up RAI is needed to complete the review of RR-03.
Follow-up RAI The licensees October 26, 2017, response to the RAI contains a plant-specific PFM for the LTOP condition to support Relief Request RR-03. However, the PFM results in the supplemental response by Boiling Water Reactor Vessel Internals Project (BWRVIP) in letter dated September 13, 2007 (ML072600167) to support BWRVIP-108, indicated that the PFM results for normal operation are more limiting than the LTOP condition.
Since the approval of BWRVIP-108 was based on the BWRVIPs PFM results, which indicated that both the normal condition and the LTOP condition satisfy the NRCs safety goal of 5x10-6, performing PFM results for the normal condition is essential. Please provide the PFM results for the normal condition, or quantitative information to demonstrate that the normal condition is not limiting for DAEC.
Please arrange a teleconference with the NRC staff to discuss the above information. Thanks Mahesh Chawla Project Manager Division of Operating Reactor Licensing (DORL)
Branch III (301) 415-8371 2
Hearing Identifier: NRR_DMPS Email Number: 80 Mail Envelope Properties (MW2PR0901MB2442B41210DA964B218B78F3F11C0)
Subject:
Second Round of RAI for DAEC Fifth Inservice Inspection Interval Program Plan, Relief Request RR EPID: L-2017-LLR-0110 Sent Date: 1/5/2018 11:29:10 AM Received Date: 1/5/2018 11:29:00 AM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients:
"Kilby, Gary" <Gary.Kilby@fpl.com>
Tracking Status: None "Catron, Steve (Steve.Catron@fpl.com)" <Steve.Catron@fpl.com>
Tracking Status: None "laura.swenzinski@nexteraenergy.com" <laura.swenzinski@nexteraenergy.com>
Tracking Status: None "Davis, J.Michael (J.Michael.Davis@nexteraenergy.com)" <J.Michael.Davis@nexteraenergy.com>
Tracking Status: None "Murrell, Bob (Bob.Murrell@nexteraenergy.com)" <Bob.Murrell@nexteraenergy.com>
Tracking Status: None Post Office: MW2PR0901MB2442.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 5258 1/5/2018 11:29:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: