ML042930253

From kanterella
Jump to navigation Jump to search

Re-Submittal of Final Security Plan, Training and Qualification Plan, and Safeguards Contingency Plans
ML042930253
Person / Time
Site: Pilgrim
Issue date: 10/13/2004
From: Balduzzi M
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.04.090, TAC MC2956
Download: ML042930253 (3)


Text

i- Entergy Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Michael A. Balduzzi October 13, 2004 Site Vice President Via Overnight Delivery Attention: Document Control Desk U. S. Nuclear Regulatory Commission Mail Station O-P1 -17 Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Re-submittal of Final Security Plan, Training and Qualification Plan, and Safeguards Contingency Plans

REFERENCES:

NRC Letter to Mr. Michael A. Balduzzi, Security Plan Provisions for Enhanced Owner Controlled Area Surveillance and Response (TAC NO. MC2956), dated September 21, 2004 LETTER NUMBER: 2.04.090

Dear Sir or Madam:

Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station's (PNPS) has incorporated the final template language changes provided by NEI (Reference 1) into PNPS plan, and the language agreed upon in a telephone conference with Mr. Michael Burrell of your staff.

This letter re-submits the plan in its entirety. The submittal consists of this letter and a single CD-ROM. The CD-ROM contains four files, each of which is presented in .pdf format.

This letter includes no new commitments.

Contact Name: Bryan S. Ford Mailing Address: Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 E-Mail Address: Bford@enterqv.com Phone Number: (508) 830-8403 Document Components:

001 Transmittal Letter.pdf 44,550 bytes 002 Security Plan.pdf 1,681,500 bytes 003 Figure 201.pdf 77,820 bytes 004 Figure 20.2.pdf 759,800 bytes NOTICE: ATTACHMENT 1 CONTAINS 'SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER BECOMES DECONTROLLED."

/ VIlsz

Entergy Nuclear Operations, Inc. Letter Number: 2.04.090 Pilgrim Station Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the

/3IX day of October 2004.

Respectfully submitted, Michael A. Balduzzi Site Vice President, PNPS MJG/dm

Attachment:

1. PNPS Physical Security Plan, Security Guard Training and Qualification Plan and Safeguards Contingency Plan

Enclosure:

1. CD-ROM cc: w/o Attachments or Enclosure Mr. Lee Licata, Project Manager Mr. Samuel J. Collins Office of Nuclear Reactor Regulation Regional Administrator, Region 1 Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 475 Allendale Road 1 White Flint North King of Prussia, PA 19406 11555 Rockville Pike Rockville, MD 20852 Senior Resident Inspector Mr. Bhalchandra K. Vaidya. Project Manager Pilgrim Nuclear Power Station Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 8-B2 Washington, D.C. 20555-0001 NOTICE: ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER BECOMES 'DECONTROLLED."

4,.

SAFEGUARDS INFORMATION Attachment 1 to 2.04.090 PNPS Physical Security Plan Security Guard Training and Qualification Plan and Safeguards Contingency Plan NOTICE: ATTACHMENT 1 CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER BECOMES "DECONTROLLED."