ML042430253

From kanterella
Jump to navigation Jump to search

Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station Follow-up to Response to Request for Additional Information Regarding Security Plan Sections 1 - 19 and Safeguards Contingency Plan
ML042430253
Person / Time
Site: Pilgrim
Issue date: 08/26/2004
From: Bethay S
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.04.075
Download: ML042430253 (2)


Text

Entergy Nuclear Operations, Inc.

gnC~g,0vPilgdm Station Of X 600 Rocky Hill Road Plymouth, MA 02360 Stephen J. Bethay Director, Nuclear Assessment Via Overnight Delivery Attention: Document Control Desk U. S. Nuclear Regulatory Commission Mail Station O-P1-17 Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Follow-up to Response to Request for Additional Information Regarding Security Plan Sections 1 - 19 and Safeguards Contingency Plan (TAC NO. MC2956)

REFERENCES:

1. NRC Letter to Mr. Michael A. Balduzzi, Request for Additional Information Re: Security Plan Sections 10-19 (TAC NO. MC2956), dated June 21, 2004
2. NRC Letter to Mr. Michael A. Balduzzi, Request for Additional Information RE: Security Plan Sections 1-9 (TAC NO. MC2956), dated June 25, 2004
3. NRC Letter to Mr. Michael A. Balduzzi, Request for Additional Information RE: Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC NO. MC2956), dated July 23, 2004
4. Entergy Letter 2.04.058 to NRC, Response to Request for Additional Information Re: Security Plan Sections 10-19 (TAC NO. MC2956), dated July 8, 2004
5. Entergy Letter 2.04.060 to NRC, Response to Security Plan RAls Sections 1-9 (TAC NO. MC2956), dated July 13, 2004
6. Entergy Letter 2.04.072 to NRC, Response Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan RAls (TAC NO. MC2956), dated August 12, 2004
7. NRC Letter (N. Diaz) to NEI (J. Colvin), Position on Vehicle Searches and Spent Fuel Sabotage, dated August 6, 2004 LETTER NUMBER: 2.04.075

Dear Sir or Madam:

This letter and attachments provide Entergy Nuclear Operations, Inc. (ENO), Pilgrim Nuclear Power Station follow-up response to the NRC letters containing requests for additional information (RAls) (References 1, 2, and 3). Our initial responses

- I}'D6 9

NOTICE: ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER BECOMES "DECONTROLLED."

Entergy Nuclear Operations, Inc. Letter Number: 2.04.075 Pilgrim Station Page 2 of 2 (References 4, 5, and 6) to those RAls identified a number of issues which were considered to be generic issues that were to be resolved using the security frequently asked question (SFAQ) process. Those generic issues have now been resolved using the SFAQ process. The follow-up responses in this letter complete our responses to the NRC RAls by agreeing to adopt the agreed upon language for the generic RAls. The Physical Security Plan or Safeguards Contingency Plan section number referenced in the original RAI identifies each RAI for which we are updating our response.

This letter contains no new commitments. As noted in References 4 and 5, revised plan pages will be submitted when all RAI questions are resolved.

If you have any questions or require additional information, please contact Mr. Bryan Ford at (508) 830-8403.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 26 th day of August 2004.

Respectfully submiUted Spen J. hay Director, Nuclear Assessment MJG/dm

Attachment:

Pilgrim Follow-up to Response to Request for Additional Information Regarding Security Plan Sections 1 - 19 and Safeguards Contingency Plan (TAC NO. MC2956) cc: w/o Attachment Mr. Lee Licata, Project Manager Mr. Samuel J. Collins Office of Nuclear Reactor Regulation Regional Administrator, Region 1 Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 475 Allendale Road 1 White Flint North King of Prussia, PA 19406 11555 Rockville Pike Rockville, MD 20852 Mr. Bhalchandra K. Vaidya. Project Manager Senior Resident Inspector Security Plan Review Team Pilgrim Nuclear Power Station Project Directorate Il Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 8-B2 Washington, D.C. 20555-0001 NOTICE: ATTACHMENT 1 CONTAINS 'SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER BECOMES "DECONTROLLED."