Final Deficiency Rept Re Adequacy of Nondestructive Exam Performed by Dravo Pipe Fabrication Div on Piping Spools, Initially Reported on 810501.Surface Too Rough for Adequate Exam.Welds Buffed & re-examined.Deficiency Not Reportable
ML20054H562
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 06/17/1982
From: Schell D
UNION ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, ULNRC-562, NUDOCS 8206240202
Download: ML20054H562 (1)


Text

x+ s m UNION ELECTRIC COMPANY 1901 GRATIOT STREET ST. Louis, Missouns oonaw n. .cua.u. June 17, 1982

.-.. .v. "Y..o~*Oo.EYI'.....

oui -.. ou..

go -4N Mr. James G. Keppler, Director US Nuclear Regulatory Commission 3 () ' N Region III 799 Roosevelt Road Glen Ellyn, IL 60137 ULNRC- 562

Dear Mr. Keppler:

POTENTIAL 10CFR50.55(e) REPORT NO. U-31 NDE OF DRAVO PIPING SPOOLS CALLAWAY PLANT On May 1, 1981 we informed NRC Region III of a potential deficiency regarding the adequacy of NDE performed by Dravo Pipe Fabrication Division on piping spools furnished to Callaway Plant.

The concern expressed was that in attempting to re-examine some shop welds by the liquid penetrant (PT) method it appeared that the surface was too rough to perform a meaningful examination.

Subsequent to the above notification, more than 180 welds at Callaway and at the Wolf Creek site were' buffed and re-examined by PT and no defective welds were found, although at Callaway 16 welds did require additional buffing to eliminate some indications.

Based on the above re-inspection program Union Electric believes that the PT techniques and interpretations used by Dravo and approved by their Authorized Nuclear Inspector are acceptable and that any further action is unwarranted.

Since there were no significant defects discovered'or any breakdown of QA procedures which would adversely affect the safety of the plant, we have concluded that this matter is not reportable-under 10CFR50.55(e).

Due to the nature and impact of the original report filed by Dravo to the NRC on this subject, Mr. Konklin requested a written follow-up to our verbal withdrawal of this potential 10CFR50.55(e).

This letter is being sent in response to that request.

y truly vours,.

M 050oON3 ,

RMD/jds PDR Don . Schnell 1

cc: J. E. Konklin, Region III .

Victor Stello, Jr., Director I&E NRC Resident Inspector, Callaway Plant Missouri Public Service Commission C2E /)

don 211982