Monthly Operating Rept for Feb 1999 for Callaway Plant,Unit 1.With
ML20204B674
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/28/1999
From: Affolter R, Ready J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3982, NUDOCS 9903220207
Download: ML20204B674 (6)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

', Union Electric po ggg ggn l Callaway Plant Fulton, MO 6f 251 March 12,1999 U. S. Nuclear Regulatory Commission O Attn: Document Control Desk Tjfggg Mail Stop PI-137 Washington, DC 20555-0001 ULNRC-3982 Gentlemen:

DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT FEBRUARY.1999 The enclosed Monthly Operating Report for February,1999 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

hdM% 0 ler Y R. D. Affolter Manager, Callaway Plant RDA/JER/cjs Enclosure i

1 9903220207 9"0228 -

\

DR ADOCK 05000483 -

PDR ,

a subsidiary of Amoren Corporanen

.. ULNRC-3982

. March 12,1999 ,

Page 2 I

, cc: Mr. Ellis W. Merschoff Regional Administrator '

U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 l Arlington, TX 76011-8064-Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman,MO 65077 j Mr. Melvin K. Gray (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation i U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 I

Manager, Electric Department I Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 1

Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

' Washington, DC 20037

i f~

l Enclosure

. ULNRC-3982 March 12,1999 DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT 1 COMPLETED BY: J. E. Ready TELEPilONE: 573/676-8617 FAX: 573/676-4202 PART A - OPF. RATIONS SUMM ARY:

Callaway operated at vpproximately 100% power for the tronth of February. There was one downpower to 90% on February 26 & 27'" due to a failed intake water purno and concerns with cooline tower make-up capabilities, PART H- PORV AND SAFETY VALVE

SUMMARY

None.

i i

l A

Page1of4

1

. Enclosure 1 ULNRC-3982 March 12,1999 PART C AVERAGE DAILY UNIT POWER LEVEL I

DOCKET NO: 50483 UNIT: Callaway Unit 1 COMPLETED BY: J. E. Ready TELEPilONE: 573/676-8617 FAX: 573/676-4202 i

MONTH: FEBRUARY,1999 l l

l 4

AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Net) DAY (MWe-Net)

I 1.164 17 1.163 2 1.163 18 1.162 3 1.158 19 1.163 i 4 1.165 20 1.165 5 1.159 21 1.166 6 1.159 22 . 1.164 7 1.160 23 1.161 8 1.154 24 1.159 9 1.158 25 1.161 10 1.149 26 1.136 11 1.149 27 _, 1.086 12 1.164 28 1.159 13 1.167 29 N/A 14 1.161 30 N/A 15 1.156 31 N/A 16 1.159 Page 2 of 4

. Enclosure ULNRC-3982

.- March 12,1999 PART D

, OPERATING DATA REPORT DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT 1 COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 OPERATING STATUS:

(FEBRUARY) YR TO DATE CUMULATIVE I. REPORTING PERIOD:

GROSS HOURS IN REPORTING PERIOD: 672 1416 124,405.5 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171

3. POWER LEVEL TO WHICII RESTRICTED (IF ANY)(MWe-Net): 100 %
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

' 5. NUMBER OF llOURS REACTOR WAS CRITICAL 672 1416 l 11,250.3 l

6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0

.7. HOURS GENERATOR ON-LINE 672 1416 109,596.9

8. UNIT RESERVE SHUTDOWN llOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,384,607 5,017,048 369,099,077
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 813,434 1,721,528 125,923,669
11. NET ELECTRICAL ENERGY GENERATED (MWH) 777,322 1 f 46,146 119,831,272
12. REACTOR SERVICE FACTOR 100.0 100.0 89.4
13. REACTOR AVAILABILITY FAC7DR 100.0 100.0 89.4
14. UNIT SERVICE FACTOR 100.0 100.0 88.1
15. UNIT AVAILABILITY FACTOR 100.0 100.0 88.1
16. UNIT CAPACITY FACTOR (Using MDC) 102.8 103.3 85.6
17. UNIT CA PACITY FACTOR (Using Design MWe) 98.8 99.3 82.3
18. UNIT FORCED OUTAGE RATE 0.0 0.0 2.02
19. SHUTDOWNS SCilEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACil):

Spring Axial Offset Anomaly Outage; begins on April 16,1999 and is scheduled for 14 days.

20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4

Enclosure -

~

ULNRC-3982 , .

March 12,1999 .

PART E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-483  !

UNIT NAME: CALLAWAY UNIT 1 COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 -

FAX: 573/676-4202 REPORT MONTil: FEBRUARY,1999 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE S: SCIIEDULEL) (IlOURS) REASON REDUCING POWER ACT!ONS/ COMMENTS 9903 02-26-99 F 23.5 A 1 SUMM ARY:The Callaway Plant operated at approsimately 100% power for the month of February with the following exception:

9903 was a downpower due to a failed intake water pump and concerns with cooling tower make up capabilities.

REASON MET 110D A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER(EXPLAIN)

Page 4 of 4