Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217E2691999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With ML20212A0201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With ML20210T4451999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With ML20209H0881999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With ML20195H4831999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Callaway Plant,Unit 1.With ML20206R7111999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Callaway Plant Unit 1.With ML20205S5791999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Callaway Plant Unit 1.With ML20204B6741999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Callaway Plant,Unit 1.With ML20199E7011998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Callaway Plant.With ML20198D9811998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Callaway Plant,Unit 1.With ML20195D3581998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Callaway Plant,Unit 1.With ML20154L4931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Callaway Plant Unit 1.With ML20151Y5151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Callaway Plant,Unit 1.With ML20237B8421998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Callaway Plant,Unit 1 ML20236Q9991998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Callaway Plant,Unit 1 ML20249A7681998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Callaway Plant,Unit 1 ML20247G0811998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Callaway Plant Unit 1 ML20216K0531998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Callaway Plant,Unit 1 ML20216G3551998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Callaway Plant, Unit 1 ML20202D4821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Callaway Plant ML20198J6791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Callaway Plant,Unit 1 ML20202H5991997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Callaway Plant,Unit 1 ML20199B4061997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Callaway,Unit 1 ML20211M9691997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Callaway Plant,Unit 1 ML20217A4941997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Callway ML20210H8841997-07-31031 July 1997 Monthly Operating Rept for July 1997 for Callaway Plant, Unit 1 ML20149D9001997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Callaway Plant Unit 1 ML20140H0261997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Callaway Plant Unit 1 ML20141B3741997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Callaway Plant,Unit 1 ML20137T2971997-03-31031 March 1997 Monthly Operating Rept for March 1997 for Callaway Plant.W/ ML20135F3471997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Callaway Plant, Unit 1 ML20134M1961997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Callaway Plant Unit 1 ML20133G0211996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Callaway Plant, Unit 1 ML20149M2871996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Callaway Plant Unit 1 ML20134K5761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Callaway Plant Unit 1 ML20128N2541996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Callaway Plant Unit 1 ML20117K7321996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Callaway Plant Unit 1 ML20116H9691996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Callaway Plant Unit 1 ML20115D2701996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Callaway Plant Unit 1 ML20112J7281996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Callaway Plant Unit 1 ML20111B2831996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Callaway Plant Unit 1 ML20101R0581996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Callaway Plant Unit 1 ML20106G8601996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Callaway Plant,Unit 1 ML20100F7331996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Callaway Plant ULNRC-03312, Monthly Operating Rept for Dec 1995 for Callaway Unit 11995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Callaway Unit 1 ULNRC-03300, Monthly Operating Rept for Nov 1995 for Callaway Plant1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Callaway Plant ULNRC-03289, Monthly Operating Rept for Oct 1995 for Callaway Plant Unit 11995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Callaway Plant Unit 1 ULNRC-03273, Monthly Operating Rept for Sept 1995 for Callaway Plant Unit 11995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Callaway Plant Unit 1 ULNRC-03266, Monthly Operating Rept for Aug 1995 for Callaway Plant Unit 11995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Callaway Plant Unit 1 ULNRC-03250, Monthly Operating Rept for Jul 1995 for Callaway Plant Unit 11995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Callaway Plant Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E2691999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With ML20212D0711999-09-14014 September 1999 Safety Evaluation Re GL 88-20, Individual Plant Exam for Severe Accident Vulnerabilities ML20212A3361999-09-14014 September 1999 1999 Biennial RERP Exercise, for Callaway Plant. Pages 7,8 & 9 (of 9) in Mini Scenario 1 Section of Incoming Submittal Not Included ML20211N0451999-09-0202 September 1999 Safety Evaluation Concluding That Util Has Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant That Are Susceptible to Pressure Locking & Binding ML20212A0201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With ML20210P0441999-08-10010 August 1999 Safety Evaluation Granting Licensee Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code,For Second 10-year Interval ISI at Plant,Unit 1 ML20210Q8331999-08-0505 August 1999 Rev 4 to Callaway Cycle 10 Colr ML20210T9481999-08-0303 August 1999 Informs Commission Re Status of Issues Related to Risk Informed Decision Making That Were Raised During Staff Review of License Amend Approving Electrosleeve SG Tube Repair Method for Ue Callaway Plant,Unit 1 ML20216D8791999-07-31031 July 1999 Rev 3 to Callaway Cycle 10 Colr ML20210T4451999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With ML20210H6531999-07-30030 July 1999 SER Accepting Relief Request to Second Ten Year Inservice Insp Plant for Plant,Unit 1 ML20209H0881999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With ML20195H4831999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Callaway Plant,Unit 1.With ML20206R7111999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Callaway Plant Unit 1.With ML20205Q5561999-04-19019 April 1999 Safety Evaluation Accepting Relief for Request from Certain ASME Section Requirements for Containment Insp ML20205S5791999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Callaway Plant Unit 1.With ML20207A7401999-03-30030 March 1999 Draft, Evaluation of Risk of Induced Steam Generator Tube Rupture, for Callaway Plant ML20205G4071999-03-25025 March 1999 Security Event Rept:On 990304,failure to Properly Compensate for Loss of Safeguards Equipment That Could Have Resulted in Undetected Intrusion Into Protected or Vital Area,Was Discovered.Caused by Msk 325 Failure.Replaced Msk 325 ML20204B6741999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Callaway Plant,Unit 1.With ML20199E7011998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Callaway Plant.With ULNRC-03990, 1998 Annual Rept for Ameren Corp/Union Electric Co. with1998-12-31031 December 1998 1998 Annual Rept for Ameren Corp/Union Electric Co. with ML20198D9811998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Callaway Plant,Unit 1.With ML20195C8341998-11-10010 November 1998 Rev 20 to Operating QA Manual ML20195C8181998-11-0909 November 1998 Rev 19 marked-up Changes to Operating QA Manual ML20195D6931998-10-31031 October 1998 Non-proprietary Rev 3 to Electrosleeving Qualification for PWR Recirculating SG Tube Repair ML20195D3581998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Callaway Plant,Unit 1.With ML20154L4931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Callaway Plant Unit 1.With ML20151Y5151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Callaway Plant,Unit 1.With ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20237B8421998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Callaway Plant,Unit 1 ML20155H7381998-06-30030 June 1998 10CFR50.59 Summary Rept for Jan-June 1998. with ML20236Q9991998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Callaway Plant,Unit 1 ML20249C5851998-06-30030 June 1998 Rev 1 to Callaway Cycle 10,COLR ML20248M0501998-06-0808 June 1998 Special Rept 98-02:on 980502,Channel 3 of loose-part Detection Sys Was Declared to Be Inoperable.Caused by Failure of Component Inaccessible at Power.Addl Troubleshooting Will Be Performed ML20249A7681998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Callaway Plant,Unit 1 ML20249B2451998-05-18018 May 1998 Nonproprietary Version of Revised Chapters 4 & 5 to Rev 4 of HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants for Ue & Wcnoc. Chapters 4 & 5 Reflect Editorial Revs ML20248C3681998-05-18018 May 1998 Non-proprietary Version of Rev 4 to HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants ML20247G0811998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Callaway Plant Unit 1 ML20217R2031998-04-27027 April 1998 Cycle 10 Colr ML20216H0651998-04-15015 April 1998 SER Approving Licensee Proposed Alternative to Use Code Case N-508-1 for Rotation of Serviced Snubbers & Prvs for Purpose of Testing in Lieu of ASME B&PV Code,Section Xi,Article IWA-7000 Requirements ML20216K0531998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Callaway Plant,Unit 1 ML20217F3181998-03-24024 March 1998 SER Accepting Relief Request for Approval for Use of Alternate Exam Requirements for Plant Inservice Insp Program ML20216G3551998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Callaway Plant, Unit 1 ML20203M0101998-02-25025 February 1998 Rev 11 to Callaway Cycle 9 Colr ML20203A7951998-02-0909 February 1998 Rev 10 to Callaway Cycle 9 Colr ML20202D4821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Callaway Plant ML20198S6361998-01-22022 January 1998 Ro:On 980121,determined That Plant Shutdown Would Be Required IAW TS 3.8.1.1,Action D.Caused by 'B' Train EES Charcoal Absorber Being Determined Inoperable.Requested 24 Hour Extension to Allow Restoration of EDG & ESW Train ULNRC-03775, 1997 Annual Rept for Union Electric1997-12-31031 December 1997 1997 Annual Rept for Union Electric ML20198Q0631997-12-31031 December 1997 Rev 9 to Callaway Cycle 9 Colr ML20198J6791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Callaway Plant,Unit 1 1999-09-30
[Table view] |
Text
. .
~ -*
canunnwa
\l '?ost offa on 6 0
(; .,.
- 6 Iston Masosi65251 o .
Eukb4RE R _ January 7,1998 U. S. Nuc'rar Regulatory Commission Attn: Document Control Desk Mail Stop PI-137 -
Washington, DC 20555-0001 ULNRC-3708 Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTillN OPERATING REPORT DECEMHER 1997 The enclosed Monthly Operatmg Report for December 1997 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
]O '
$ R. D. Aff ter Manager, Callaway Plant RDA/MAH .
Enclorure lY
,,, , w R PDR
. ULNRC-3708 January 7,1998 Page 2 cc: hir. Ellis W. hierschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 3 Arlington, TX 76011-8064 Senior Resident inspector Callaway Resident Omce U.S. Nuclear Res;ulatory Commission 8201 NRC Road Steedman, hiO 65077 Mr. Barry C Westreich (2 copies)
Acting Licensing Project hianager, Callaway Plant Omce of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission hiail Stop 13E16 Washington, DC 20555-2738 hianager, Electric Department hiissouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxte.
Shaw, Pittman, Potts, & Trowbnuge 2300 N. Street N.W.
Washington, DC 20037 I
l
_ULNRC-3708
~ January 7i 1998 -
. 4 ,l y DOCKET NO.: 50-483 -
UNIT NAME: CALLAWAY UNIT 1
- COMPLETED BY: - M. A. Holnws .
TELEPHONE: 573/676 8842 FAX: --573/676 4 334 PART A - OPERATIONS SUMM AMY:,
. On 7/10/97, at 1600, power was reduced to 94.5% due to an axial offset anomaly. On 8/19/97, at 0900, power was reduced over 2 days from 94.5% to 70.5% due to the axial offset anomaly. The plant operated ,
at approximately 70% until 12/9/97, at 14:00 when power was increased to approximately 72%. On 12/22/97, at 13:00 power was increased tc 74%. Power was kept 74% for the remainder of the month to ensure adequate shutdown margin.
PART U - PORV AND SAFETY VAI'd,f HRM ARY:
.. I Nonc, 5
i
- Page1of4
- g a.
. 0
. Encitsure ULNRC-3708 January 7,1998 PART C AVERAGE D ATI,Y 1..,IT POWER LEVEL DOCKET NO: 50-483 UNIT: Callaway Unit 1 COMPLETED BY: M. A. llotmes TELEPHONE: 573/676-8842 FAX: 573/676-4334 MONTil: DECEMBER 1997 j AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL ,
l}MX (MWe-Net) .
DAY (MWe-Net) ,
1 811 17 338 2 812 18 835 3 812 19 840 4 814 20 852 5 814 21 851 ;
814 22 857 7 813 23 866 8 813 24 865 s 9 823 25 867 10 835 26 866 11 836 27 866 12 841 28 866 13 841 29 866 14 841 30 863 If 837 31 865 16 837 ,_
Page 2 of 4
1 . .
Enctsure j , . -
. ULNRC-3708 January 7,1998 PART D OPERATING DATA REPORT
) DOCKET NO.: 50-483 UNIT NAME: CALLAV'AY UNIT 1
' COMPLETED BY: M. A. Ilotmes TELEPHONE: 573/676-8842 FAX: 573/676-4334 OPERATING STATUS:
(DEC) (YTD) (CUM)
- 1. REPORTING PERIOD:
GROSSIlOURS IN REPORTINC, PERIOD; 744 8,760.0 114,229.5 2 CURRENTLY AUrilORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe Net): 1171
- 3. POWER LEVEL TO WillCll RESTRICTED (IF ANY)(MWe Net): 100 %
- 4. REASONS FOR RESTRICTION (IF ANY):
Tills MONTI( VR TO DATE CUMUI,ATIVE
- 5. NUMBER OF llOURS REACTOR WAS CRITICAL 744 8,760.0 101,836.9
- 6. REACTOR RESERVE SHUTDOWN ilOURS 0 0 0
- 7. 1 LOURS GENERATOR ON-LINE 744 8,760.0 100,265.4
- 8. UNIT RESERVE SIIUTDOWNIIOURS 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED 1,907,667 27,463,886 337,835,693 (MWH) 7
- 10. GROSS ELECTRICAL ENERGY GENERATED 660,946 9,390,733 115,749,649 [
(MWil)
- 11. NET ELECTRICAL ENERGY GENERATED 625,376 8,954,604 109,668,353 (MWH)
- 12. REACTOR SERVICE FACTOR 100.0 100.0 89.2
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 89.2
- 14. UNIT SERVICE FACTOR 100.0 100.0 87.8
- 15. UNIT AVAILABILITY FACTOR 100.0 100.0 87.8
- 16. UNIT CAPACITY F/.CTOR(Using MDC) 74.7 90.9 85.3
- 17. UNIT CAPACITY FACTOR (Using Design MWe) 71.8 87.3 82.0 f
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 2.12
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACil):
Refueling Date: 4/4/98 Duration: 42 days
- 20. IF SHUT DOWN AT END OF REPORTING PER'OD, ESTIMATE DATE OF STARTUP:
Page 3 of 4
^
Enchuure . *
^
~*
- ULNRC-3708
PART E UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-483 UNIT NAhE: CALLAWAY UNIT 1 COMPLETED BY: M. A. Holmes TELEPHONE- 573/676-8842.
FAX: 573/676-4334 REPORT MONTH: DECEMBER 1997 METHOD OF TYPE SHUTTING DOHW F: FORCED DURATION THE REACTOR OR CORRECTIVE
@, DATE S: SCHEDULED OIOURS) REASON REDUCING POWER ACTIONS / COMMENTS 3 971201 F 0 li 1 See Summary below.
SUMMARY
- 3. The plant was operated at approximately 70% until 12/9/97, at 14.2 when power was increased to approximately 72%. On 12/22/97, at 13.M power was increased to 74%. Power was kept 74% for the remainder of the month to ensure adequate shutdowti margin for an axial offset anomaly.
REASON METHOD A: EQUIPAENTFA' LURE (EXPLAIN) 1: MANUAL B. MAINT.ORTEST 2: MANUALSCRAM C: REFUELING 3: ALTf0MATICSCRAM D: REGULATORY RESTRICTION 4: OTFER(EXPLAI?Q E: OPERATORTRAINING AND LICENSE EXAMINATION F. ADMINISTRATION
. G: OPERATIONAL ERROR (EXPLAIN; H: OTIER(EXPLAl?4 Page 4 of4
- _