Monthly Operating Rept for July 1998 for Callaway Plant,Unit 1
ML20237B842
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/31/1998
From: Affolter R, Ready J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3883, NUDOCS 9808200014
Download: ML20237B842 (6)


Text

- _ _ _ - _ .

e Union Electric Po BoxC20 Callaway Plant Fulton, MO 65251 l

l l

August 17,1998 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop Pl-137 MI6 Washington, DC 20555-0001 WAmemn ULNRC-3883 Gentlemen:

DOCKET NUM BER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT JULY 1998 The enclosed Monthly Operating Report for July 1998 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

l W

l R. D. Iter Manager, Callaway Plant RDA/JER/tmw Enclosure

.. n l

_. t v V

9808200014 980731 PDR ADOCK 05000483 R PDH; e subsibery of Amoren Corparstron

p-- .

ULNRC-3883 August 17,1998 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nucice ",2gulatory Commission Region IV l

611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 1

Senior Resident Inspector l Callaway Resident Office l l U.S. Nuclear Regulatory Commission j 8201 NRC Road Steedman,MO 65077 l

Ms. Kristine M. Thomas (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 i Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 j Mr. Thomas A. Baxter l 1

Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

Wasidngton, DC 20037 j

. Enclosure :

ULNRC - 3883 August 17,1998 DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT 1 COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 PART A - OPERATIONS

SUMMARY

The Plant Maintained approximately 100% power for the month of July,1998.

PART B -PORY AND SAFETY VALVE

SUMMARY

None.

l t-I l:

l Page1of4

. Enclosure ULNRC - 3883 )

August 17,1998 PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO; 50-483 UNIT: Callaway Unit 1 COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 MONTH: July 1998 AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Net) DAY (MWe-Net) 1 1.149 17 1.I47 2 1.148 18 1.138 3 1.143 19 1.133 4 1.148 20- 1.127 5 1.146 21 1.132 6 1.138 22 1.136 7 1.137 23 1.147 8 1.141 24 1.155 9 1.145 25 1.155 10 1.144 26 1.155 11 1.146 27 1.I53 12 1.146 28 1.I47 13 1.143 29 1.142 14 1.148 30 1.151 15 1.150 31 1.156 16 1.146 Page 2 of 4

Enclosure

. ULNRC - 3883 August 17,1998

,.- ,- PARTD OPERATING DATA REPORT DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT 1 I COMPLETED BY: J. E. Ready TELEPilONE: 573/676-8617 FAX: 573/676-4202 OPERATING STATUS:

(JULY) (YTD) (CUM)

1. REPORTINO PsRIOD:

GROSS IlOURS IN REPORTING PERIOD: 744 5,087 119,342 2 CURRENTLY AUTilORIZED POWER LEVEL (MWI): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 l DESIGN ELECTRICAL RATING (MWe-Net): 1171

3. POWER LEVEL TO WlilCil RESTRICTED (IF ANY) (MWe-Net): 100 %
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH VR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 744 4,375.8 106,212.7
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0  !
7. }{OURS GENERATOR ON-LINE 744 4,337.7 104,603.1
8. UNIT RESERVE SilUTDOWN IlOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED 2,649,883 13,644,999.1 351,480,692 )

(MWil)

10. GROSS ELECTRICAL ENERGY GENERATED 892,542 4,657,822 119,907,471 ;

(MWII)

11. NET ELECTRICAL ENERGY GENERATED 851,779 4,418,689 114,087,042 (MWID
12. REACTOR SERVICE FACTOR 100 86 88.9
13. REACTOR AVAILABILITY FACTOR 100 86 88.9 I 4. UNIT SERVICE FACTOR 100 85.2 87.6
15. UNIT AVAILABILITY FACTOR 100 85.2 87.6
16. UNIT CAPACITY FACTOR (Using MDC) 101.8 77.2 85
17. UNIT CAPACITY FACTOR (Using Design MWe) 97,7 74.2 81.6
18. UNIT FORCED OUTAGE RATE 0.0 0.0 2.03
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4

U

- Y 72 Ay621 0 Wd8 4

a - -

_ 3 Ae66 8 LR7 7

_ 4 L .//66 0

AE37 7 3

5C15 5 Y: 3 B T

. : N' OE ED: E E NMT TAE O N M ENL K PH P E M VO T MELX C

ONOEA I I T/

C DUCTF C SN E

S N

RO I O

RT I OC T CA C

U 8 D 9 RR E 9 WO E R 1 W W R E O R O E N FD O T P M U

W J O GCG D A)

DNA N MRN EOP  :

OIT ER CU O I

T H T H A SCI A RD HT T R

C CP L

AN N T UED E E STX I

PA O HHE S M MSTR M LLA( E N T AAMR UU OE W R O O N NN AAUT TH P O D

T E S MMAO U R A  :

E 1: 2: 3 4:

H R S

T I

N N N O I

U O) T I S A TR N A

R U I M

U O A D( H X E

E S

D ) N N

)

E N E I L

I C A DU N A I L

L NL P ED O P OD X

_ CE S X TN I

E A

RH E E CA (

EOC PFS R

(

E I

RG R R TN O Y:  :

U R TFS SI E NNR)OE N

_ L

_ I T I R AI I AS LA

_ 3 9 8

E FE TT YRT RTA AL 8 9 T NR GOR R NPX 8 1 3 ,

A D

Y EOINTO.L A TI TO S I E T(

e - 7 R M

P T E L ANAR r 1 uC t A I NU UI FGEMEH U RI RE sRs o u M Q A EEPDPT c Ng EMRROAOO l .

nL u O M U

. EUA N S ABCDEFGH

,