Monthly Operating Rept for Oct 1998 for Callaway Plant,Unit 1.With
ML20195D358
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/31/1998
From: Affolter R, Ready J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3918, NUDOCS 9811180013
Download: ML20195D358 (6)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ -- -- __ __

,e .' union Electric PO Box 620

.. Callaway Plant Fulton, MO 65251

, i November 13,1998 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI-137 NO Washington, DC 20555-0001 WAmeren

" " "'-'9'*

UE Gentlemen:

DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT OCTOBER.1998 The enclosed Monthly Operating Report for October,1998 is submitted pursuant to Section 6.9.1.8 of the Callawny Unit 1 Technical Specifications.

htsam h hhr R. D. Affolter Manager, Callaway Plant RDA/JER/tmw Enclosure '

ffjf  ;

/

9811100013 981031 DR ADOCK 050004 3 a subsidiary of Amoren Corporation

~ ULNRC-3918 -

. . November 13,1998-Page 2.

]

cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 'I 611 Ryan Plaza Drive, Suite 400

{ Arlington, TX 76011-8064 -1 1

)

! Senior Resident Inspector .

Callaway Resident Office l U.S. Nuclear Regulatory Commission l> 8201 NRC Road

[ Stccdman,MO 65077

Mr. Melvin K. Gray (2 copies)

}. Licensing Project Manager, Callaway Plant

' Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 1 Mail Stop 13E16  !

Washington, DC 20555-2738 k

[ Manager, Electric Department

. Missouri Public Service Commission PO Box 360 '!

Jefferson City, MO 65102 Mr Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge  ;

2300 N, Street N.W. '

Washington, DC 20037 l

I A _.

Enclosure ULNRC-3918

, November 13,1998 i

DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 PART A - OPERATIONS

SUMMARY

The plant maintained approximately 100% until October 23,1998.

On October 21,1998 an engineer was performing a routine thermography survey. During the survey, elevated temperatures were found on the 'B' phase neutral bushing of the main transformer. After observation and evaluating the options, it was determined that the plant would be taken off-line to repair the bushing. The main turbine was tripped at 05:38 on October 24,1998 and the reactor was held at 7-8%

power during the evolution. The cause was determined to be dried grease in the connection. The bushing was repaired and the main generator was placed on-line at 03:44 on October 25,1998. The plant reached 100% power at 22:53 on October 25,1998 and remained there for the rest of the month.

. PART B- PORV AND SAFETY VALVE

SUMMARY

None.

l l

l 1

l i

i i

l Page l of 4

Enclosure ULNRC-3918 November 13,1998 PART C AVERAGE DAILY UNIT N)WER LEVEL DOCKET NO: 50-483 UNIT: Callaway Unit 1 COMPLETED BY: J. E. Ready TELEPilONE: 573/676-8617 FAX: 573/676-4202 MONTil: OCTO',ER,1998 AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Net) DAY (MWe-Net) 1 1.169 17 1.150 2 1.167 18 1.169 3 1.163 19 1.170 .

4 1.160 20 1.170 5 1.157 21 1.168 6 1.166 22 1.174 7 1.170 97I 23

)

8 1.173 24 163 j 9 1.173 25 734 10 1.167 26 1.153 l 11 1.165 27 1.152 l 12 1.166 28 1.153 13 1.169 29 1.152 I

i 14 1.165 30 1.162 31 15 1.159 1.168 16 1.154 4

r Page 2 of 4

I- Enclosure i

i.""4 ULNRC-3918 -

i November 13,1998 I

PART D OPERATING DATA REPORT l

DOCKET NO.: 50-483 UNIT NAME: CALI.AWAY UNIT 1 COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 l FAX: 573/676-4202 j OPERATING STATUS:

l (OCTOBER) (YTD) (CUM)

1. REPORTING PERIOD:

GROSS HOURS IN REPORTING PERIOD: 745 7,296.0 121,525.5 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): 100 %
4. REASONS FOR RESTRICTION (IF ANY): I THIS MONTH VR TO DATE CUMULATIVE l
5. NUMBER OF IIOURS REACTOR WAS CRITICAL 745 6,584.4 108,421.7

, 6. REACTOR RESERVE SHUTDOWN llOURS 0 0 0 f

l l

7. HOURS GENERATOR ON-LINE 720 6,521.7 106,787.1

. 8. UNIT RESERVE SHUTDOWN llOURS 0 0 0

! l

9. GROSS THERMAL ENERGY GENERATED 2,520,911 13,644,999.1 359,208,913 i (MWH) l t 10. GROSS ELECTRICAL ENERGY GENERATED 859,896 7,275,014.0 122,524,663 l I (MWH)  !
11. NET ELECTRICAL ENERGY GENERATED 820,026 6,916,218.0 116,584,571 (MWH) '
12. REACTOR SERVICE FACTOR 100 90.3 89.2

! 13. REACTOR AVAILABILITY FACTOR 100 90.3 89.2 l

14. UNIT SERVICE FACTOR 96.6 89.4 87.9 l
15. UNIT AVAILABILITY FACTOR 96.6 89.4 87.9
16. UNIT CAPACITY FACTOR (Using MDC) 97.8 84.3 85.3
17. UNIT CAPACITY FACTOR (Using Design MWe) 94.0 81.0 81.9  !
18. UNIT FORCED OUTAGE RATE 9.65 1.10 2.06
19. SHUTDOWNS SCHEDULL. DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

- 20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4 i- _ ._- - - - , . = = - ---

Enclcsure .

ULNRC-3918 4 2'

~

November 13,1998 PART E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORT MONTH: OCTOBER,1998 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO. .DATE S: SCHEDULED (HOURS) REASON REDUCING POWER ACTIONS / COMMENTS 9806 981023 F 71.87 A 1 THE GREASE WAS REPLACED WITH GREASE LESS SUSCEPTIBLE TO DRYING OUT

SUMMARY

On October 21,1998 an c gineer was performing a routine thermography survey. During the survey, elevated temperatures were found on the 'B' phase neutral bushing of the main transformer. After observation and evaluating the options, it was determined that the plant would be taken off-line to repair the bushing. He main turbine was tripped at 05:38 on October 24,1998 and the reactor was held at 7-8% power during the evolution. The cause was determined to be dried grease in the connection. He bushing was repaired with grease less susceptible to drying out and the main generator was placed on-line at 03:44 on October 25,1998.

De plant reached 100% power at 22:53 on October 25,1998 and remained there for the rest of the month.

REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B. MAINT.OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER(EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRAT'ON G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER(EXPLAIN)

Page 4 of4