ML20135G065

From kanterella
Jump to navigation Jump to search
Supplemental Part 21 & Deficiency Rept U-70 Re Failures of Crane-Deming Keepwarm Lube Oil Pumps.Initially Reported on 840328.Permanent ASME Section III Equivalent Pumps Will Be Installed on Engine Skid by First Refueling
ML20135G065
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/28/1985
From: Schnell D
UNION ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-85, REF-PT21-85-410-000 PT21-85-410, PT21-85-410-000, U-70, ULNRC-1165, NUDOCS 8509180104
Download: ML20135G065 (3)


Text

T) m 4 w

' UNION ELECTRIC COMPANY M 1901 Grotet Street St Louis August 28, 1985 Donald F. Schnell Vice Presiderst Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

ULNRC-ll65 SUPPLEMENT TO 10CFR50.55(e)/PART 21 REPORT U-70 EMERGENCY DIESEL GENERATOR KEEPWARM LUBE OIL PUMP CALLAWAY PLANT Ref: 1. ULNRC-780 3/28/84

2. ULNRC-831 5/26/84
3. ULNRC-925 9/12/84 The references describe failures of the Crane-Deming keepwarm lube oil pumps on the Callaway Plant Emergency Diesel Generators and actions to be taken to resolve the problem. In reference 3 we stated that the permanent replacement pumps would be relocated remote from the engine skid to improve accessibility and facilitate pump alignment. Since the installation of the interim commercial grade pumps in the original configuration on the engine skid, as described in reference 3, we have experienced 11 months of trouble free operation without any alignment difficulties. We have concluded, therefore, that relocation of the pumps to a remote skid is not necessary or justifiable.

Amending the information provided in reference 3, it is our intent to install the permanent ASME Section III equivalent pumps in the original configuration on the engine skid. The permanent replacement pumps will be installed no later than the first refueling, as previously scheduled.

Very truly yours,

.c h Donald F. Schnell JJM/RPW/lw 8509180104 DR 850828 g ADOCK 05000483 Pm SEP 9 1985.

\

Mailing Address RO Box 149, St Louis MO 63166 t{'

'1T .2 'f

~ .

a*

STATE OF MISSOURI )

) SS CITY OF ST. LOUIS ) j Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.

By " ftd ~

f Donald F. Schnell Vice President Nuclear SUBSCRIBED and sworn to before me this d [- day of 44f , 198 C' BARGARA FFAFF NOTARY PUBLIC, STATE Of MISSOURt MY COMM!SSION EXPIRES APRIL 22, 1989 ST. LOUIS COUNTY l

l

T  : o l ' ' '.e ,

' cc: Gerald Charnof f, Esq.

Shaw, P i t tm an , Potts & Trowbridge 1800 M. Street, N.W.

Washington, D.C. 20036 Nicholas A. Petrick Executive Director SNUPPS 5 Choke Cherry Road l Rockville, Maryland 20850 G. C. Wright Division of Projects and Resident Programs, Chief, Section lA U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Of fice U.S. Nuclear Regulatory Commission RR#1 S teedman, Missouri 65077 Tom Alexion Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail S top P-316 7920 Norfolk Avenue Bethesda, MD 20014 l