Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217E269 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With | |
ML20212D071 | 14 September 1999 | Safety Evaluation Re GL 88-20, Individual Plant Exam for Severe Accident Vulnerabilities | Hot Short Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Earthquake |
ML20212A336 | 14 September 1999 | 1999 Biennial RERP Exercise, for Callaway Plant. Pages 7,8 & 9 (of 9) in Mini Scenario 1 Section of Incoming Submittal Not Included | |
ML20211N045 | 2 September 1999 | Safety Evaluation Concluding That Util Has Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant That Are Susceptible to Pressure Locking & Binding | Safe Shutdown Power-Operated Valves Backfit |
ML20212A020 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With | |
ML20210P044 | 10 August 1999 | Safety Evaluation Granting Licensee Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code,For Second 10-year Interval ISI at Plant,Unit 1 | VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML20210Q833 | 5 August 1999 | Rev 4 to Callaway Cycle 10 Colr | |
ML20210T948 | 3 August 1999 | Informs Commission Re Status of Issues Related to Risk Informed Decision Making That Were Raised During Staff Review of License Amend Approving Electrosleeve SG Tube Repair Method for Ue Callaway Plant,Unit 1 | Probabilistic Risk Assessment Large early release frequency |
ML20216D879 | 31 July 1999 | Rev 3 to Callaway Cycle 10 Colr | |
ML20210T445 | 31 July 1999 | Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With | |
ML20210H653 | 30 July 1999 | SER Accepting Relief Request to Second Ten Year Inservice Insp Plant for Plant,Unit 1 | Boric Acid High Radiation Area Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Scaffolding |
ML20209H088 | 30 June 1999 | Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With | |
ML20195H483 | 31 May 1999 | Monthly Operating Rept for May 1999 for Callaway Plant,Unit 1.With | |
ML20206R711 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Callaway Plant Unit 1.With | |
ML20205Q556 | 19 April 1999 | Safety Evaluation Accepting Relief for Request from Certain ASME Section Requirements for Containment Insp | |
ML20205S579 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Callaway Plant Unit 1.With | |
ML20207A740 | 30 March 1999 | Draft, Evaluation of Risk of Induced Steam Generator Tube Rupture, for Callaway Plant | Loop seal Mission time Severe Accident Management Guideline |
ML20205G407 | 25 March 1999 | Security Event Rept:On 990304,failure to Properly Compensate for Loss of Safeguards Equipment That Could Have Resulted in Undetected Intrusion Into Protected or Vital Area,Was Discovered.Caused by Msk 325 Failure.Replaced Msk 325 | Contraband |
ML20204B674 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Callaway Plant,Unit 1.With | Downpower |
ML20199E701 | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Callaway Plant.With | Downpower |
ULNRC-03990, 1998 Annual Rept for Ameren Corp/Union Electric Co. with | 31 December 1998 | 1998 Annual Rept for Ameren Corp/Union Electric Co. with | |
ML20198D981 | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Callaway Plant,Unit 1.With | Downpower |
ML20195C834 | 10 November 1998 | Rev 20 to Operating QA Manual | Safe Shutdown Fitness for Duty Offsite Dose Calculation Manual Coatings Nondestructive Examination Temporary Modification VT-2 Condition Adverse to Quality Process Control Program Fire Protection Program |
ML20195C818 | 9 November 1998 | Rev 19 marked-up Changes to Operating QA Manual | |
ML20195D693 | 31 October 1998 | Non-proprietary Rev 3 to Electrosleeving Qualification for PWR Recirculating SG Tube Repair | Boric Acid Non-Destructive Examination Safe Shutdown Earthquake Coatings Nondestructive Examination Finite Element Analysis Earthquake Liquid penetrant Flow Induced Vibration |
ML20195D358 | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Callaway Plant,Unit 1.With | |
ML20154L493 | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Callaway Plant Unit 1.With | Downpower |
ML20151Y515 | 31 August 1998 | Monthly Operating Rept for Aug 1998 for Callaway Plant,Unit 1.With | |
ML20155B587 | 28 August 1998 | Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant | |
ML20237B842 | 31 July 1998 | Monthly Operating Rept for July 1998 for Callaway Plant,Unit 1 | |
ML20155H738 | 30 June 1998 | 10CFR50.59 Summary Rept for Jan-June 1998. with | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Fire Barrier Stroke time Hydrostatic Past operability Temporary Modification Annual Radiological Effluent Release Report Earthquake Pressure Boundary Leakage Fire Protection Program |
ML20236Q999 | 30 June 1998 | Monthly Operating Rept for June 1998 for Callaway Plant,Unit 1 | |
ML20249C585 | 30 June 1998 | Rev 1 to Callaway Cycle 10,COLR | |
ML20248M050 | 8 June 1998 | Special Rept 98-02:on 980502,Channel 3 of loose-part Detection Sys Was Declared to Be Inoperable.Caused by Failure of Component Inaccessible at Power.Addl Troubleshooting Will Be Performed | |
ML20249A768 | 31 May 1998 | Monthly Operating Rept for May 1998 for Callaway Plant,Unit 1 | |
ML20249B245 | 18 May 1998 | Nonproprietary Version of Revised Chapters 4 & 5 to Rev 4 of HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants for Ue & Wcnoc. Chapters 4 & 5 Reflect Editorial Revs | Boric Acid Fuel cladding |
ML20248C368 | 18 May 1998 | Non-proprietary Version of Rev 4 to HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants | Boric Acid Fuel cladding |
ML20247G081 | 30 April 1998 | Monthly Operating Rept for Apr 1998 for Callaway Plant Unit 1 | |
ML20217R203 | 27 April 1998 | Cycle 10 Colr | |
ML20216H065 | 15 April 1998 | SER Approving Licensee Proposed Alternative to Use Code Case N-508-1 for Rotation of Serviced Snubbers & Prvs for Purpose of Testing in Lieu of ASME B&PV Code,Section Xi,Article IWA-7000 Requirements | |
ML20216K053 | 31 March 1998 | Monthly Operating Rept for Mar 1998 for Callaway Plant,Unit 1 | Shutdown Margin |
ML20217F318 | 24 March 1998 | SER Accepting Relief Request for Approval for Use of Alternate Exam Requirements for Plant Inservice Insp Program | Boric Acid High Radiation Area Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Scaffolding |
ML20216G355 | 28 February 1998 | Monthly Operating Rept for Feb 1998 for Callaway Plant, Unit 1 | Shutdown Margin |
ML20203M010 | 25 February 1998 | Rev 11 to Callaway Cycle 9 Colr | |
ML20203A795 | 9 February 1998 | Rev 10 to Callaway Cycle 9 Colr | |
ML20202D482 | 31 January 1998 | Monthly Operating Rept for Jan 1998 for Callaway Plant | Shutdown Margin |
ML20198S636 | 22 January 1998 | Ro:On 980121,determined That Plant Shutdown Would Be Required IAW TS 3.8.1.1,Action D.Caused by 'B' Train EES Charcoal Absorber Being Determined Inoperable.Requested 24 Hour Extension to Allow Restoration of EDG & ESW Train | Enforcement Discretion |
ULNRC-03775, 1997 Annual Rept for Union Electric | 31 December 1997 | 1997 Annual Rept for Union Electric | |
ML20198Q063 | 31 December 1997 | Rev 9 to Callaway Cycle 9 Colr | |
ML20198J679 | 31 December 1997 | Monthly Operating Rept for Dec 1997 for Callaway Plant,Unit 1 | Shutdown Margin |