ML20040F081

From kanterella
Revision as of 00:53, 14 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Fourth Interim Rept of Significant Const Deficiency 27 Re Switchgear Breaker Position Switch Operator.Addl Time Needed to Verify Adequacy of Rework & Documentation & Receive Replacement Part.Next Rept by 820315
ML20040F081
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/29/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, Q-3-A35.07.27, NUDOCS 8202080295
Download: ML20040F081 (1)


Text