ML20040F081
| ML20040F081 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/29/1982 |
| From: | Mclendon G LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, Q-3-A35.07.27, NUDOCS 8202080295 | |
| Download: ML20040F081 (1) | |
Text
,,
LoulSIANA f 24a ouAnONoe smou POW E R & LiG H T/ P o BOX 6008
- NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345
'$E[lN s'OsSO) u January 29, 1982 G D. McLENDON Senior Vice President W3K82-004
'\\
Q-3-A35 h7 Mr. John T. Collins, Regional Administrator, Region IV b
'g ji U. S. Nuclear Regulatory Commission 2
FEg[.- IS$h [.{l 611 Ryan Plaza Drive, Suite 1000 f.
C 4j. -
Ar1ington, Texas 76012
-C.
-li
/
y ;; *
SUBJECT:
Waterford SES Unit No. 3
'b
/. S' Decket No. 50-382
~'T F" Significant Construction Deficiency No. 27 "Switchgear Breaker Position Switch Operator Defect" Fourth Interim Report
Dear Mr. Collins:
Louisiana Power & Light Company had committed to submit a report on Significant Construction Deficiency No. 27 by January 31, 1982.
In order to complete the corrective action on this Significant Construction Deficiency, additional time is required to verify the adequacy of this rework and its associated documentation. In addition, a replacement part for one of the breakers has to be obtained from General Electric Company, which may cause additional delay.
Based on this information, a report will be submitted by March 15, 1982.
If you have any questions, please let us know.
Very truly yours, GDMcL/LLB/ncd cc:
- 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission D $ @ Qf fj 7 t,
Washington, D. C. 20555
,J L
I b
l@
,f l
2)
Director Office of Management
[