ML20055B802

From kanterella
Revision as of 19:44, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Second Interim Rept on Significant Const Deficiency 29 Re Inadequate Clearance Between Process Piping Sys & box-type Pipe Supports/Restraints,Originally Reported 810714.Final Rept Will Be Submitted on 821015 Instead of 820630
ML20055B802
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/15/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K-82-0419, W3K-82-419, NUDOCS 8207230311
Download: ML20055B802 (1)


Text

,

l.001SI AN A 442 ouinoNoe S1nur P O W E R & L I G H T! P O BOX 6008

  • (504) 366-2345

'Yub,<NfO u

I f P"' July 15, 1982 G D McLENDON Senior Vice President W3K 82-0419

. - agt ,, Q-3-A35.07.29 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

Subject:

Waterford SES Unit No. 3 Dockct No. 50-382 Significant Construction Deficiency No. 79

" Inadequate Clearance Between Process Piping Systems and Box-Type Pipe Supports / Restraints" Second Interim Report

Reference:

1) LP&L Letter W3K 81-0257 to NRC dated July 14, 1981
2) Telecon - R. G. Bennett (LP&L) to L. Martin (NRC) on July 12, 1982

Dear Mr. Collins:

LP&L committed to submitting the final report on this Significant Construction Deficiency on June 30, 1982. We are unable to meet the scheduled date.

Nonconformance Report W3-2644 is the controlling document for tracking the work activity involved in the corrective action. Upon completion of work activity, documentation review, and closure of NCR W3-2644, the final report on Significant Construction Deficiency 29 will be submitted on or before October 15, 1982.

If you have any questions, please call me.

Very truly yours, 8207230311 820715 #

gDRADOCK05000 GDMcL/LLB/grf cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission I]

Washington, D. C. 20555 h

2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 I