Meeting Summary - Internal Meeting of the Browns Ferry Unit 1 Restart Panel (Letter - Public)
ML070380030
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/06/2006
From: James Shea
Division of Reactor Safety II
To:
Tennessee Valley Authority
Shared Package
ML070380020 List:
References
Download: ML070380030 (5)


Text

February 6, 2006 LICENSEE: Tennessee Valley Authority FACILITY: Browns Ferry Unit 1

SUBJECT:

MEETING

SUMMARY

- INTERNAL MEETING OF THE BROWNS FERRY UNIT 1 RESTART PANEL - DOCKET NO. 50-259 On January 30, 2007, the Nuclear Regulatory Commission (NRC) held a meeting of the NRC Browns Ferry 1 (BF1) Restart Oversight Panel at the NRC Region II Office in Atlanta, GA. The panel was established in accordance with NRC Inspection Manual Chapter (IMC) 2509, Browns Ferry Unit 1 Restart Project Inspection Program. The purpose of IMC 2509 is to provide the policies and requirements for the restart inspection program, the BF1 Restart Oversight Panel, and the documentation of the major regulatory and license actions associated with the restart. In addition, the IMC provides guidance for assessing the licensees readiness for restart and the return of the unit to the Reactor Oversight Process (ROP). The Restart Panel was established via a charter issued on October 13, 2005.

The purpose of the panel meeting was to discuss the BF1 restart project status and review key issues. Discussion topics during this internal NRC meeting included: TVA Schedule Status and pending Unit 2 refueling outage impact; status of licensing activities; fire protection program status; review of Inspection Plan and Schedule (IP&S) reports; System Preoperability Checklist (SPOC) schedule; Reactor Oversight Process (ROP) transition plan; update on memos and letters to be issued; ORAT Status; and planning for the next Internal Panel meeting. The NRC will continue to inspect BF1 restart activities and will also focus on upcoming activities as Browns Ferry Unit 2 outage begins and Unit 1 restart activities continue.

As a result of emergent and planned activities, Catherine Haney and Lakshminaras Raghavan were unavailable. In the interim, Timothy McGinty is representing Catherine Haney as Vice-Chairman and Margaret Chernoff is representing Lakshminaras Raghavan as member of the Browns Ferry Unit 1 Restart Oversight Panel. contains a list of the restart oversight panel members participating in the meeting and other NRC attendees. Enclosure 2 contains the Inspection Plan and Schedule Report.

TVA 2 Documents associated with the NRC oversight of the BF1 Recovery can be found on the NRCs website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/bf1-recovery.html .

Sincerely,

/RA/

Joseph W. Shea, Director Division of Reactor Safety Docket No.: 50-259 License No.: DPR-33

Enclosures:

1. List of Attendees
2. Inspection Plan and Schedule Report Distribution w/encls: (See page 3)

_Package: ML070380020 Doc: ML070380030 OFFICE RII:DRP RII:DRP RII:DRS SIGNATURE TXN /RA/ MTW /RA/ JWS /RA/

NAME TNazario MWidmann JShea DATE 02/06/2007 02/06/2007 2/06/2007 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO TVA 3 Memo to BF Unit 1 Panel Members from Joseph W. Shea dated February 6, 2007

SUBJECT:

MEETING

SUMMARY

- INTERNAL MEETING OF THE BROWNS FERRY UNIT 1 RESTART PANEL - DOCKET NO. 50-259 Distribution w/encls:

W. Bearden, DRP J. Boska, NRR E. Brown, NRR M. Chernoff, NRR C. Haney, NRR T. McGinty, NRR M. Lesser, DCI L. Mellen, DRP T. Nazario, DRP L. Raghavan, NRR T. Ross, DRP J. Shea, DRS C. Stancil, DRP M. Widmann, DRP

List of Attendees NRC Browns Ferry Unit 1 Restart Oversight Panel Meeting (1/30/07)

Nuclear Regulatory Commission Panel Members Region II J. Shea, Director, Division of Reactor Safety (DRS) - Chairman M. Widmann, Chief, Branch 6, Division of Reactor Projects (DRP) - Member W. Bearden, Senior Resident Inspector Unit 1, Branch 6, DRP - Member M. Lesser, Chief, Division of Construction Inspection (DCI) - Member L. Mellen, Senior Project Engineer, Branch 6, DRP - Member Headquarters T. McGinty, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR -

Acting Vice Chairman (participated via VTC)

M. Chernoff, Project Manager, DORL, NRR - Acting Member (participated via VTC)

Other Participants T. Ross, Senior Resident Inspector Units 2 and 3, Branch 6, DRP T. Nazario, Project Engineer, Branch 6, DRP J. Boska, Project Manager, DORL, NRR (participated via VTC)

E. Brown, Project Manager, DORL, NRR (participated via VTC)

R. Lantz, Senior Emergency Preparedness Inspector/DRS/Region IV (participated via teleconference)

Enclosure 1