MONTHYEARNOC-AE-05001862, 90-Day Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2005-03-0808 March 2005 90-Day Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0515305472005-05-27027 May 2005 RAI Related to GL 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at pressurized-water Reactors Project stage: RAI ML0515302852005-06-0202 June 2005 6/2/05, South Texas Project, RAI, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0516605012005-06-0202 June 2005 Waterford - RAI Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. Project stage: RAI NOC-AE-05001907, 45-Day Response to a Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors2005-07-13013 July 2005 45-Day Response to a Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: Response to RAI NOC-AE-05001922, Supplement 1 to the Response to Generic Letter 2004-022005-08-31031 August 2005 Supplement 1 to the Response to Generic Letter 2004-02 Project stage: Supplement NOC-AE-06001968, Supplement 2 to the Response to Generic Letter 2004-022006-01-30030 January 2006 Supplement 2 to the Response to Generic Letter 2004-02 Project stage: Supplement ML0603903862006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accident at Pressurized-Water Reactors. Project stage: RAI ML0603902462006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactor. Project stage: RAI W3F1-2007-0051, Request for Extension of Completion Date for Corrective Actions Required by Generic Letter 2004-022007-11-14014 November 2007 Request for Extension of Completion Date for Corrective Actions Required by Generic Letter 2004-02 Project stage: Request ML0733900652007-12-10010 December 2007 Approval of Extension Request, Corrective Actions Due Date, GL 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: Other NOC-AE-07002237, Request for Extension for Final Response to Generic Letter 2004-02 and Implementation of Revised Design Basis for ECCS Sump2007-12-10010 December 2007 Request for Extension for Final Response to Generic Letter 2004-02 and Implementation of Revised Design Basis for ECCS Sump Project stage: Request ML0735200762007-12-19019 December 2007 Approval of Extension Request for Corrective Actions GL 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (TAC No. MC4719 & MC4720) Project stage: Other ML0801403182008-01-28028 January 2008 Staff Audit Report on Results of Corrective Actions to Address GSI-191 GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at PWRs Project stage: Other ML0801400072008-01-28028 January 2008 Report on Results of Staff Audit of Corrective Actions to Address GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at PWRs Project stage: Other NOC-AE-07002240, Supplement 3 to the Response to Generic Letter 2004-022008-02-29029 February 2008 Supplement 3 to the Response to Generic Letter 2004-02 Project stage: Supplement NOC-AE-08002316, Request for Extension for Final Response to Generic Letter 2004-02 and Implementation of Revised Design Basis for ECCS Sump2008-06-19019 June 2008 Request for Extension for Final Response to Generic Letter 2004-02 and Implementation of Revised Design Basis for ECCS Sump Project stage: Request ML0818201642008-06-30030 June 2008 South Texas Project, Units 1 and 2 - E-mail from Albon Harrison (Stpegs) to Mohan Thadani (NRC PM) Request to Extend June 30, 2008 Implementation Due Date of a Revised ECCS Sump Strainer Project stage: Request ML0818300032008-07-0202 July 2008 Approval of Extension Request for Corrective Actions Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. Project stage: Other ML0825301962008-09-0808 September 2008 Point Beach - Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request NOC-AE-08002372, Supplement 4 to the Response to Generic Letter 2004-02, (TAC Nos. MC4719 & MC4720)2008-12-11011 December 2008 Supplement 4 to the Response to Generic Letter 2004-02, (TAC Nos. MC4719 & MC4720) Project stage: Supplement ML0917302852009-06-11011 June 2009 Draft Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: Draft RAI ML0917302832009-06-11011 June 2009 Email, Draft Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: Draft RAI ML0920901072009-08-0606 August 2009 Notice of Conference Call with Entergy Operations, Inc. to Discuss Draft Request for Additional Information on Generic Letter 2004-02 for Waterford, Unit 3 Project stage: Draft RAI ML0925101242009-09-22022 September 2009 RAI, Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents. Project stage: RAI ML0927200322009-10-0101 October 2009 Notice of Forthcoming Conference Call with Entergy Operations, Inc. to Discuss Waterford Steam Electric Station, Unit 3, Planned Response to Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML0934106072009-12-23023 December 2009 Request for Additional Information for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML1005400832010-02-24024 February 2010 Forthcoming Conference Call with Entergy Operations, Inc. to Licensee'S Responses to NRC Generic Letter 2004-02 for Waterford Steam Electric Station, Unit 3 Project stage: Request ML1006903722010-03-0808 March 2010 Licensee Slides from 3/8/2010 Meeting Generic Letter 2004-02 Response to RAIs Project stage: Response to RAI ML1007003012010-04-0707 April 2010 Summary Follow-Up Conference Call with Entergy Operations, Inc. to Discuss Draft Response for Waterford, Unit 3, to the Request for Additional Information for Generic Letter 2004-02 Project stage: Draft RAI ML1013400612010-05-18018 May 2010 Notice of Forthcoming Conference Call with Entergy Operations, Inc. to Discuss Draft Response on GL-2004-02 for Waterford Steam Electric Station, Unit 3 Project stage: Draft Other ML1015204762010-06-0101 June 2010 Email, Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML1015302322010-06-0909 June 2010 Summary of Conference Call Meeting with Entergy Operations, Inc. to Discuss Draft Response on GL-2004-02 for Waterford Steam Electric Station, Unit 3 ML1017301902010-06-17017 June 2010 Revised Responses to the Request for Additional Information Related to GL-2004-02 Project stage: Request ML1017301952010-06-17017 June 2010 Revised Responses to the Nrc'S Request for Additional Information Related to GL-2004-02 Project stage: Request ML1017302002010-06-17017 June 2010 Chemical Effects Summary Related to RAI Response to GL-2004-02 Project stage: Other ML1023004452010-08-27027 August 2010 Notice of Conference Call with STP Nuclear Operating Corp., to Discuss Request for Additional Information for Generic Letter 2004-02 Project stage: RAI ML1028103452010-10-13013 October 2010 9/13/2010 Summary of Conference Call with STP Nuclear Operating Company to Discuss Request for Additional Information Responses for South Texas Project, Units 1 and 2 on Generic Letter 2004-02 Project stage: RAI W3F1-2010-0032, Response to Request for Additional Information Regarding Final Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2010-11-23023 November 2010 Response to Request for Additional Information Regarding Final Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Supplement 2008-07-02
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 IR 05000382/20230042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 05000382/LER-2023-004, Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement2024-02-14014 February 2024 Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 05000382/LER-2023-003, Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing2023-12-30030 December 2023 Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000382/20230032023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 2024-09-06
[Table view] |
Text
January 28, 2008 Mr. Kevin T. Walsh Vice President of Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REPORT ON RESULTS OF STAFF AUDIT OF CORRECTIVE ACTIONS TO ADDRESS GENERIC LETTER 2004-02 (TAC NO. MC4729)
Dear Mr. Walsh:
Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors," requested that all pressurized-water reactor (PWR) licensees (1) evaluate the adequacy of the emergency sump recirculation function with respect to potentially adverse effects associated with post-accident debris, and (2) implement any plant modifications determined to be necessary. Entergy Operations, Inc.
(Entergy, the licensee), has conducted an evaluation of recirculation sump performance for Waterford Steam Electric Station, Unit 3 (Waterford Unit 3). In addition, Entergy has installed new sump strainers in Waterford 3.
Consistent with the discussion in the "Reasons for Information Request" section of GL 2004-02, the Nuclear Regulatory Commission (NRC) staff is using sample audits to help verify that licensees have resolved the concerns identified in the generic letter. The NRC staff has conducted a detailed audit of the new sump strainer design and associated analyses and testing for Waterford Unit 3.
The NRC staff is forwarding the Waterford 3 Generic Safety Issue (GSI)-191 audit report to Entergy. The enclosed audit report provides Entergy feedback on its GL 2004-02 corrective actions and supporting analyses. Also, when made publicly available, this audit report will serve as a vehicle to inform other PWR licensees of the NRC staffs technical positions on various aspects of GSI-191, PWR Sump Performance.
The NRC staff previously forwarded a draft of this audit report to Entergy. Entergy, after consultation with its contractors and vendors for GL 2004-02 corrective actions, assisted the staff in removing a small amount of information claimed by General Electric Hitachi Nuclear Energy to be proprietary. Therefore, the NRC staff believes that there is no proprietary information contained in the enclosed audit report.
K. Walsh Entergy was supportive during all phases of the audit. Consideration was given by Entergy in providing appropriate office space and facilitating the emergency core cooling system pump rooms tour taken by audit team members. Your primary point-of-contact during the preparation, conduct, and report-writing phases of the audit was helpful in accomplishing the audit.
The enclosed audit report does not reach a conclusion regarding overall adequacy of Entergys GL 2004-02 corrective actions for Waterford 3. The NRC staff expects that Entergys end-of-Calendar Year 2007 GL 2004-02 supplemental response, due by the end of February 2008, will respond to the open items in the enclosed audit report. This expectation has been stated in public meetings with licensees and at the audit exit meeting for the Waterford Unit 3 audit. It is reinforced in a GL 2004-02 supplemental response content guide that the NRC staff released in August 2007 and revised in November 2007. In 2008, NRC staff consideration of Entergys GL 2004-02 supplemental response (including its response to audit open items), due by February 29, 2008, will result in a letter to Entergy assessing the overall adequacy of the Waterford Unit 3 GL 2004-02 corrective actions.
The audit team did not evaluate whether Entergy has identified and/or submitted appropriate licensing documents for its GL 2004-02 corrective actions. The licensees maintenance of its licensing basis is within the scope of the Reactor Oversight Program. The audit team did not evaluate the completeness of the licensees implementation of GL 2004-02 corrective actions.
That is also within the scope of the Reactor Oversight Program under TI 2515/166, "Pressurized Water Reactor Containment Sump Blockage."
Sincerely,
/RA/
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosure:
As stated cc w/o encl: See next page
Pkg ML08140315 (Letter ML080140007, Audit Report ML080140318)
(*) Editorial changes only in staff provided letter OFFICE NRR/LPL4/PM NRR/LPL4/LA DSS/SSIB NRR/LPL4/BC NAME NKalyanam JBurkhardt MScott (*)* THiltz, MCT for DATE 1/28/08 1/14/08 1/10/08 1/28/08 Waterford Steam Electric Station, Unit 3 (November 2007) cc w/o encl:
Senior Vice President Manager, Licensing Entergy Nuclear Operations Entergy Operations, Inc.
P.O. Box 31995 17265 River Road Jackson, MS 39286-1995 Killona, LA 70057-3093 Senior Vice President and COO Mr. Timothy Pflieger Entergy Operations, Inc. Environmental Scientist - Supervisor P.O. Box 31995 REP&R-CAP-SPOC Jackson, MS 39286-1995 Louisiana Department of Environmental Quality Vice President, Operations Support P.O. Box 4312 Entergy Services, Inc. Baton Rouge, LA 70821-4312 P.O. Box 31995 Jackson, MS 39286-1995 Parish President Council St. Charles Parish Site Vice President P.O. Box 302 Waterford Steam Electric Station, Unit 3 Hahnville, LA 70057 Entergy Operations, Inc.
17265 River Road Chairman Killona, LA 70057-3093 Louisiana Public Services Commission P.O. Box 91154 General Manager, Plant Operations Baton Rouge, LA 70825-1697 Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc. Mr. Richard Penrod, Senior Environmental 17265 River Road Scientist/State Liaison Officer Killona, LA 70057-3093 Office of Environmental Services Northwestern State University Director, Nuclear Safety & Licensing Russell Hall, Room 201 Entergy Services, Inc. Natchitoches, LA 71497 440 Hamilton Avenue White Plains, NY 10601 Resident Inspector Waterford NPS Director, Nuclear Safety Assurance P.O. Box 822 Entergy Operations, Inc. Killona, LA 70057-0751 17265 River Road Killona, LA 70057-3093 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Senior Manager, Nuclear Safety 611 Ryan Plaza Drive, Suite 400
& Licensing Arlington, TX 76011 Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995