MONTHYEARNOC-AE-05001862, 90-Day Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2005-03-0808 March 2005 90-Day Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0515302852005-06-0202 June 2005 6/2/05, South Texas Project, RAI, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI NOC-AE-05001907, 45-Day Response to a Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors2005-07-13013 July 2005 45-Day Response to a Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: Response to RAI NOC-AE-05001922, Supplement 1 to the Response to Generic Letter 2004-022005-08-31031 August 2005 Supplement 1 to the Response to Generic Letter 2004-02 Project stage: Supplement NOC-AE-06001968, Supplement 2 to the Response to Generic Letter 2004-022006-01-30030 January 2006 Supplement 2 to the Response to Generic Letter 2004-02 Project stage: Supplement ML0603902462006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactor. Project stage: RAI NOC-AE-07002237, Request for Extension for Final Response to Generic Letter 2004-02 and Implementation of Revised Design Basis for ECCS Sump2007-12-10010 December 2007 Request for Extension for Final Response to Generic Letter 2004-02 and Implementation of Revised Design Basis for ECCS Sump Project stage: Request ML0735200762007-12-19019 December 2007 Approval of Extension Request for Corrective Actions GL 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (TAC No. MC4719 & MC4720) Project stage: Other ML0801403182008-01-28028 January 2008 Staff Audit Report on Results of Corrective Actions to Address GSI-191 GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at PWRs Project stage: Other ML0801400072008-01-28028 January 2008 Report on Results of Staff Audit of Corrective Actions to Address GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at PWRs Project stage: Other NOC-AE-07002240, Supplement 3 to the Response to Generic Letter 2004-022008-02-29029 February 2008 Supplement 3 to the Response to Generic Letter 2004-02 Project stage: Supplement NOC-AE-08002316, Request for Extension for Final Response to Generic Letter 2004-02 and Implementation of Revised Design Basis for ECCS Sump2008-06-19019 June 2008 Request for Extension for Final Response to Generic Letter 2004-02 and Implementation of Revised Design Basis for ECCS Sump Project stage: Request ML0818201642008-06-30030 June 2008 South Texas Project, Units 1 and 2 - E-mail from Albon Harrison (Stpegs) to Mohan Thadani (NRC PM) Request to Extend June 30, 2008 Implementation Due Date of a Revised ECCS Sump Strainer Project stage: Request ML0818300032008-07-0202 July 2008 Approval of Extension Request for Corrective Actions Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. Project stage: Other ML0825301962008-09-0808 September 2008 Point Beach - Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request NOC-AE-08002372, Supplement 4 to the Response to Generic Letter 2004-02, (TAC Nos. MC4719 & MC4720)2008-12-11011 December 2008 Supplement 4 to the Response to Generic Letter 2004-02, (TAC Nos. MC4719 & MC4720) Project stage: Supplement ML0934106072009-12-23023 December 2009 Request for Additional Information for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML1023004452010-08-27027 August 2010 Notice of Conference Call with STP Nuclear Operating Corp., to Discuss Request for Additional Information for Generic Letter 2004-02 Project stage: RAI ML1028103452010-10-13013 October 2010 9/13/2010 Summary of Conference Call with STP Nuclear Operating Company to Discuss Request for Additional Information Responses for South Texas Project, Units 1 and 2 on Generic Letter 2004-02 Project stage: RAI 2008-01-28
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project Draft Request for Additional Information License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23191A0102023-07-0707 July 2023 NRR E-mail Capture - South Texas Project - Acceptance of Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML23124A3272023-05-0404 May 2023 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code ML23003A8082022-11-28028 November 2022 NRR E-mail Capture - Texas Commission on Environmental Quality (TCEQ) Review/Comment Regarding the Draft Environmental Assessment for the South Texas Project Alternate Disposal Request (L-2021-LLL-0022)) ML22249A0692022-09-0606 September 2022 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements (L-2002-LLA-0113) ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22115A2632022-04-19019 April 2022 Email Response to David Lochbaum Regarding Interim Configuration of Holtec HI-STORE FW Spent Fuel Multipurpose Canister at South Texas Project Energy Generating Station ML22105A5642022-04-0505 April 2022 Request for Information for Problem Identification and Resolution at STP Nuclear Operating Company ML21344A0072021-12-0909 December 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Alternative Disposal Request ML21305B8022021-11-0101 November 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Inservice Inspection Impracticality ML21257A2262021-09-14014 September 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (L-2021-LLA-0151) ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21117A3242021-04-22022 April 2021 NRR E-mail Capture - (External_Sender) STP Questions About Eplan Amendment SE ML21103A0072021-04-12012 April 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Add a Note to TS 3.6.3 and to Remove the TS Index (L-2021-LLA-0041) ML21058A0002021-02-26026 February 2021 NRR E-mail Capture - South Texas Units 1 and 2 - License Amendment Request to Revise Moderator Temperature Coefficient SRs - Audit Plan and Setup of Online Document Access (L-2021-LLA-0004) ML21049A2652021-02-16016 February 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements (L-2021-LLA-0004) ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20244A0222020-08-28028 August 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil. (L-2020-LLA-0172) ML20135H1982020-05-14014 May 2020 NRR E-mail Capture - South Texas Unit 1 - License Amendment Request to Revise Safety Injection System Accumulator Pressure - Audit Plan and Setup of Online Reference Portal ML20125A3312020-05-0404 May 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Emergency Plan (L-2020-LLA-0057) ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20050E1192020-02-19019 February 2020 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Actions - Proposed Alternatives to ASME OM Code Requirements (EPID: L 2020-LLR-0007 to L-2020-LLR-0010) ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) ML19291A0332019-10-17017 October 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding Request to Delete E Bar Definition ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19162A1162019-05-22022 May 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding TSTF-529 ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML19078A3792019-03-19019 March 2019 NRR E-mail Capture - Acceptance Review Results: STP RR-ENG-3-23 (L-2018-LLR-0021) ML18292A7272018-10-19019 October 2018 NRR E-mail Capture - Acceptance Review Results: TSTF-522 (L-2018-LLA-0271) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) ML18263A1432018-09-12012 September 2018 NRR E-mail Capture - Final RAI for South Texas Project RR-ENG-E-16 (L-2018-LLR-0097) ML18190A5002018-07-0909 July 2018 NRR E-mail Capture - Acceptance Review Results - South Texas Unit 1 Relief Request - Relief Request RR-ENG-3-16 (L-2018-LLR-0097) ML18121A0322018-04-30030 April 2018 NRR E-mail Capture - Acceptance Review Results - South Texas Project Technical Specification Change for Standby Diesel Generator Surveillance Requirements Acceptance Criteria (L-2018-LLA-0078) ML18060A3062018-03-0101 March 2018 NRR E-mail Capture - Acceptance Review Results for South Texas Project Relief Request to Extend the Timeframe for Volumetric Exams of B-A and B-D Reactor Vessel Welds (L-2018-LLR-0010) ML18016A1542018-01-16016 January 2018 NRR E-mail Capture - Acceptance Review Results - South Texas Project Relief Request to Use Ultrasonic Examination Techniques in Lieu of Radiography (L-2017-LLR-0154) 2023-09-21
[Table view] |
Text
From: Harrison, Albon [awharrison@STPEGS.COM] Sent: Monday, June 30, 2008 8:02 AM To: Schulz, William; Kersey, Richard; Alarcon, Ed; Bowman, Tim; Callaway, Catherine; Canady, Clyde; Coates, Ken; Cobb, David; Gann, Catherine; Gutterman, Al; Halpin, Ed; Harrison, Albon; Head, Scott; John Dixon; Keen, Charles; Kirksey, Chris; Kistler, Marilyn; Mallen, Frank; Meier, Michael; Mookhoek, William; Morris, James; Nesrsta, Jim; Pollo, Kevin; Rencurrel, David; Savage, Robyn; Sheppard, James; Taplett, Kenneth; Temple, Robert K.; Thad.Hill@nrgenergy.com; Mohan Thadani; Towler, Deborah; von Suskil, Jim; Walker, Philip; Wood, Jon
Subject:
STPNOC letter to NRC regarding contingency actions for sump testing per Generic Letter 2004-02 and GSI-191 Attachments: 08002328 (strainer contingency).pdf
The attached letter was signed out on June 26, 2008. The letter responds to NRC questions on STPNOC's request to extend the June 30 due date for implementation of a revised ECCS sump strainer design to December 12, 2008. It lists potential contingency actions that STPNOC can take should testing of the sump strainers not demonstrate adequacy of the design as expected.
This is the same letter that was e-mailed to some recipients the afternoon of June 26, 2008. The file format is pdf converted from Word, an improvement on the pdf scanned image file sent originally.
Please call me if you have any questions.
Wayne Harrison STPNOC Licensing (361) 972-7298 (W)
(361) 972-8298 (FAX)
(979) 240-6331 (M)
Pager 0594 awharrison@stpegs.com E-mail Properties Mail Envelope Properties (C5EF7C4EEB0C064EA742AF2F3691C39C03EF2133)
Subject:
STPNOC letter to NRC regarding contingency actions for sump testing per Generic Letter 2004-02 and GSI-191
Sent Date: 6/30/2008 8:01:39 AM Received Date: 6/30/2008 8:01:39 AM From: Harrison, Albon
Created By: awharrison@STPEGS.COM Recipients:
weschulz@STPEGS.COM (Schulz, William)
Tracking Status: None rpkersey@STPEGS.COM (Kersey, Richard)
Tracking Status: None ealarcon@cpsenergy.com (Alarcon, Ed)
Tracking Status: None ctbowman@STPEGS.COM (Bowman, Tim)
Tracking Status: None Catherine.Callaway@nrgenergy.com (Callaway, Catherine)
Tracking Status: None Clyde.Canady@austinenergy.com (Canady, Clyde)
Tracking Status: None
klcoates@STPEGS.COM (Coates, Ken)
Tracking Status: None dlcobb@STPEGS.COM (Cobb, David)
Tracking Status: None cmgann@STPEGS.COM (Gann, Catherine)
Tracking Status: None agutterman@morganlewis.com (Gutterman, Al)
Tracking Status: None
ehalpin@STPEGS.COM (Halpin, Ed)
Tracking Status: None awharrison@STPEGS.COM (Harrison, Albon)
Tracking Status: None
smhead@STPEGS.COM (Head, Scott)
Tracking Status: None John.Dixon@nrc.gov (John Dixon)
Tracking Status: None ckeen@STPEGS.COM (Keen, Charles)
Tracking Status: None Chris.Kirksey@austinenergy.com (Kirksey, Chris)
Tracking Status: None mkkistler@STPEGS.COM (Kistler, Marilyn)
Tracking Status: None
fhmallen@STPEGS.COM (Mallen, Frank) Tracking Status: None mdmeier@STPEGS.COM (Meier, Michael)
Tracking Status: None
wemookhoek@STPEGS.COM (Mookhoek, William) Tracking Status: None jrmorris@STPEGS.COM (Morris, James)
Tracking Status: None jjnesrsta@cps-satx.com (Nesrsta, Jim)
Tracking Status: None KMPollo@CPSEnergy.com (Pollo, Kevin) Tracking Status: None dwrencurrel@STPEGS.COM (Rencurrel, David)
Tracking Status: None rdsavage@STPEGS.COM (Savage, Robyn)
Tracking Status: None
jsheppard@STPEGS.COM (Sheppard, James) Tracking Status: None
kjtaplett@STPEGS.COM (Taplett, Kenneth) Tracking Status: None rktemple@cps-satx.com (Temple, Robert K.)
Tracking Status: None Thad.Hill@nrgenergy.com (Thad.Hill@nrgenergy.com)
Tracking Status: None Mohan.Thadani@nrc.gov (Mohan Thadani)
Tracking Status: None ditowler@STPEGS.COM (Towler, Deborah)
Tracking Status: None jim.vonsuskil@nrgenergy.com (von Suskil, Jim)
Tracking Status: None plwalker@STPEGS.COM (Walker, Philip)
Tracking Status: None jwood@coxsmith.com (Wood, Jon)
Tracking Status: None
Post Office:
exgbe2.corp.stpegs.net
Files Size Date & Time
MESSAGE 70444 6/30/2008 08002328 (strainer contingency).pdf 41291
Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False
Sensitivity: olNormal Recipients received: