Letter Sequence RAI |
|---|
|
|
MONTHYEARW3F1-2004-0075, Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program2004-09-13013 September 2004 Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program Project stage: Request W3F1-2005-0005, 90 Day Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2005-03-0303 March 2005 90 Day Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0515305472005-05-27027 May 2005 RAI Related to GL 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at pressurized-water Reactors Project stage: RAI ML0516605012005-06-0202 June 2005 RAI Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0521402772005-07-28028 July 2005 Part 21 Deficiency Report Re Framatome Anp Supplied Pressurizer Heaters with Internals Manufactured by Thermocoax. Initially Reported on 07/22/05 Project stage: Request ML0603903862006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accident at Pressurized-Water Reactors Project stage: RAI ML0733900652007-12-10010 December 2007 Approval of Extension Request, Corrective Actions Due Date, GL 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: Other ML0801400072008-01-28028 January 2008 Report on Results of Staff Audit of Corrective Actions to Address GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at PWRs Project stage: Other ML0801403182008-01-28028 January 2008 Staff Audit Report on Results of Corrective Actions to Address GSI-191 GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at PWRs Project stage: Other ML0917302832009-06-11011 June 2009 Email, Draft Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: Draft RAI ML0917302852009-06-11011 June 2009 Draft Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: Draft RAI ML0920901072009-08-0606 August 2009 Notice of Conference Call with Entergy Operations, Inc. to Discuss Draft Request for Additional Information on Generic Letter 2004-02 for Waterford, Unit 3 Project stage: Draft RAI ML0925101242009-09-22022 September 2009 RAI, Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents Project stage: RAI ML0927200322009-10-0101 October 2009 Notice of Forthcoming Conference Call with Entergy Operations, Inc. to Discuss Waterford Steam Electric Station, Unit 3, Planned Response to Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML1005400832010-02-24024 February 2010 Forthcoming Conference Call with Entergy Operations, Inc. to Licensees Responses to NRC Generic Letter 2004-02 for Waterford Steam Electric Station, Unit 3 Project stage: Request ML1006903722010-03-0808 March 2010 Licensee Slides from 3/8/2010 Meeting Generic Letter 2004-02 Response to RAIs Project stage: Response to RAI ML1007003012010-04-0707 April 2010 Summary Follow-Up Conference Call with Entergy Operations, Inc. to Discuss Draft Response for Waterford, Unit 3, to the Request for Additional Information for Generic Letter 2004-02 Project stage: Draft RAI ML1013400612010-05-18018 May 2010 Notice of Forthcoming Conference Call with Entergy Operations, Inc. to Discuss Draft Response on GL-2004-02 for Waterford Steam Electric Station, Unit 3 Project stage: Draft Other ML1015204762010-06-0101 June 2010 Email, Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML1015302322010-06-0909 June 2010 Summary of Conference Call Meeting with Entergy Operations, Inc. to Discuss Draft Response on GL-2004-02 for Waterford Steam Electric Station, Unit 3 ML1017301902010-06-17017 June 2010 Revised Responses to the Request for Additional Information Related to GL-2004-02 Project stage: Request ML1017301952010-06-17017 June 2010 Revised Responses to the NRCs Request for Additional Information Related to GL-2004-02 Project stage: Request ML1017302002010-06-17017 June 2010 Chemical Effects Summary Related to RAI Response to GL-2004-02 Project stage: Other W3F1-2010-0032, Response to Request for Additional Information Regarding Final Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2010-11-23023 November 2010 Response to Request for Additional Information Regarding Final Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Supplement 2009-06-11
[Table View] |
Text
From:
Kalyanam, Kaly Sent:
Tuesday, June 01, 2010 2:17 PM To:
STEELMAN, WILLIAM J
Subject:
Request for Additional Information - TAC No. MC4729 Mr. W. Steelman Waterford Steam Electric Station, Unit 3 Entergy Operations Inc.
Subject:
Request for Additional Information - TAC No. MC4729 Docket No. 50-382 By letter date September 22, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092510124), the U.S. Nuclear Regulatory Commission (NRC) staff sent a Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (TAC No. MC4729). However, a question that was discussed prior to the letter was inadvertently omitted from the RAI.
We are forwarding the specific question by this email and the email will be formalized by placing it on the docket.
NRC RAI 33a:
Please provide an evaluation of gas evolution downstream of the strainer that could reach the pump suction. Please provide the percentage of evolved gas estimated at the pump inlet.
Evaluate the effects of any potential gas ingestion to the pumps taking suction from the sump as described in RG 1.82, Appendix A. The staff is concerned that any gasses that are stripped from the fluid as it passes through the strainer could collect within the strainer and eventually transport to the pump suction as larger air pockets. In addition, the staff has not received information that would characterize the redissolution of air or gas as the static head on the fluid increases as it flows to the pumps suction. If re-dissolution of air is credited, please provide an evaluation of the variables that could affect the redissolution.
If you have any questions, please do not hesitate to call me.
Thanks Kaly N. Kalyanam PM, Waterford 3 E-mail Properties
Mail Envelope Properties ()
Subject:
Request for Additional Information ? TAC No. MC4729 Sent Date: 6/1/2010 1:35:44 PM Received Date: 6/1/2010 2:16:00 PM From: Kalyanam, Kaly Created By: Kaly.Kalyanam@nrc.gov Recipients:
wsteelm@entergy.com (STEELMAN, WILLIAM J)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 8922 6/1/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: