6/2/05, South Texas Project, RAI, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors
ML051530285
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/02/2005
From: Jaffe D
NRC/NRR/DLPM/LPD4
To: Sheppard J
South Texas
Jaffe D, NRR/DLPM, 415-1439
References
TAC MC4719, TAC MC4720
Download: ML051530285 (5)


Text

June 2, 2005 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483

SUBJECT:

SOUTH TEXAS PROJECT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO GENERIC LETTER 2004-02, POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY SUMP RECIRCULATION AT PRESSURIZED-WATER REACTORS (TAC NOS. MC4719 AND MC4720)

Dear Mr. Sheppard:

By letter dated March 2, 2005, STP Nuclear Operating Company (the licensee) provided the 90-day response to U. S. Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02 for South Texas Project, Units 1 and 2. The GL requested the licensee perform an evaluation of the emergency core cooling system and containment spray system recirculation functions in light of the information provided in the GL and, if appropriate, take additional actions to ensure system function. Additionally, addressees were requested to submit to the NRC the information specified in the GL.

The NRC staff has completed its preliminary review of your response and has determined it needs additional information requested in the enclosure to complete our review.

This RAI requests additional information about your overall plans and schedules and not any information on detailed plans or extensive analyses. In light of this, please provide the additional information requested in the enclosure within 45 days of receipt of this letter.

If you have any questions, please call me at (301) 415-1439.

Sincerely,

/RA/

David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499

Enclosure:

Request for Additional Information cc w/encl: See next page

June 2, 2005 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483

SUBJECT:

SOUTH TEXAS PROJECT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO GENERIC LETTER 2004-02, POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY SUMP RECIRCULATION AT PRESSURIZED-WATER REACTORS (TAC NOS. MC4719 AND MC4720)

Dear Mr. Sheppard:

By letter dated March 2, 2005, STP Nuclear Operating Company (the licensee) provided the 90-day response to U. S. Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02 for South Texas Project, Units 1 and 2. The GL requested the licensee perform an evaluation of the emergency core cooling system and containment spray system recirculation functions in light of the information provided in the GL and, if appropriate, take additional actions to ensure system function. Additionally, addressees were requested to submit to the NRC the information specified in the GL.

The NRC staff has completed its preliminary review of your response and has determined it needs additional information requested in the enclosure to complete our review.

This RAI requests additional information about your overall plans and schedules and not any information on detailed plans or extensive analyses. In light of this, please provide the additional information requested in the enclosure within 45 days of receipt of this letter.

If you have any questions, please call me at (301) 415-1439.

Sincerely,

/RA/

David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION:

PUBLIC PDIV-1 R/F RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDlpmLpdiv1 (DTerao)RidsNrrPMDJaffe RidsNrrLADBaxley RidsRgnIMailCenter DCullison/DSolorio RidsNrrDlpmDpr RidsNrrDssaDpr MWebb Accession No.: ML051530285 *RAI input from SPLB without any major change OFFICE PDIV-1/PM PDIV-1/LA DSSA/SPLB/SP PDIV-1/PM PDIV-1/SC PDIII-2/PM PDIII-2/SC NAME MWebb/JHopkins DBaxley DCullison/DSolorio* DJaffe DTerao/

GSuh DATE 6/2/2005 6/2/05 5/23/05 6/2/05 6-2-05 OFFICIAL RECORD COPY

REQUEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 2004-02, POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY SUMP RECIRCULATION AT PRESSURIZED-WATER REACTORS STP NUCLEAR OPERATING COMPANY SOUTH TEXAS PROJECT, UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499 By letter dated March 2, 2005, STP Nuclear Operating Company (the licensee) provided the 90-day response to U. S. Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02 for South Texas Project, Units 1 and 2. The GL requested that addressees perform an evaluation of the emergency core cooling system and containment spray system recirculation functions in light of the information provided in the GL and, if appropriate, take additional actions to ensure system function. Additionally, addressees were requested to submit to the NRC the information specified in the GL. The staff has completed its preliminary review of your response and has determined it needs the following additional information to complete our review:

As a result of the review of the 90-day responses for all licensees and recent discussions with industry, the staff is concerned that some licensees may be delaying the evaluation of chemical and downstream effects until after the September 1, 2005, due date for the next response to the GL. This would result in an incomplete response and is not in accordance with the schedule in the GL. Your 90-day response indicated that your analysis will be completed by September 1, 2005, but did not discuss the evaluation of chemical and downstream effects.

Although the GL did not specifically request that the evaluation of chemical and downstream effects be discussed in the 90-day response, please discuss your plans and schedule for evaluating chemical and downstream effects and verify whether your September 1, 2005, response will include an evaluation of these effects.

ENCLOSURE

South Texas Project, Units 1 & 2 cc:

A. H. Gutterman, Esq.

Senior Resident Inspector Morgan, Lewis & Bockius U.S. Nuclear Regulatory Commission 1111 Pennsylvania Avenue, NW P. O. Box 910 Washington, DC 20004 Bay City, TX 77414 E. D. Halpin C. Kirksey/C. M. Canady Vice President Oversight City of Austin STP Nuclear Operating Company Electric Utility Department P. O. Box 289 721 Barton Springs Road Wadsworth, TX 77483 Austin, TX 78704 Mr. J. J. Nesrsta S. M. Head, Manager, Licensing Mr. R. K. Temple STP Nuclear Operating Company City Public Service Board P. O. Box 289, Mail Code: N5014 P. O. Box 1771 Wadsworth, TX 77483 San Antonio, TX 78296 Environmental and Natural Resources Mr. C. A. Johnson/ R. P. Powers Policy Director AEP Texas Central Company P. O. Box 12428 P. O. Box 289 Austin, TX 78711-3189 Mail Code: N5022 Wadsworth, TX 77483 Jon C. Wood Cox Smith Matthews INPO 112 East Pecan, Suite 1800 Records Center San Antonio, TX 78205 700 Galleria Parkway Atlanta, GA 30339-3064 Director Division of Compliance & Inspection Regional Administrator, Region IV Bureau of Radiation Control U.S. Nuclear Regulatory Commission Texas Department of State Health Services 611 Ryan Plaza Drive, Suite 400 1100 West 49th Street Arlington, TX 76011 Austin, TX 78756 Jack A. Fusco/Michael A. Reed Brian Almon Texas Genco, LP Public Utility Commission 12301 Kurland Drive William B. Travis Building Houston, TX 77034 P. O. Box 13326 1701 North Congress Avenue Judge, Matagorda County Austin, TX 78701-3326 Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414

South Texas Project, Units 1 & 2 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Division P. O. Box 12157 Austin, TX 78711 Mr. Ted Enos 4200 South Hulen Suite 630 Ft. Worth, Texas 76109