ML092090107

From kanterella
Jump to navigation Jump to search

Notice of Conference Call with Entergy Operations, Inc. to Discuss Draft Request for Additional Information on Generic Letter 2004-02 for Waterford, Unit 3
ML092090107
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/06/2009
From: Kalyanam N
Plant Licensing Branch IV
To: Markley M
Plant Licensing Branch IV
Kalyanam N, NRR/DORL/LPL4, 415-1480
References
TAC MC4729
Download: ML092090107 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 6, 2009 MEMORANDUM TO: Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Kaly N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING CONFERENCE CALL WITH ENTERGY OPERATIONS, INC.

DATE AND TIME: Tuesday,August25,2009 8:30 a.m. - 4:30 p.m.

LOCATIONS: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-1'1 H9 Rockville, MD 20852 Generation Support Building Mechanical Work Room (2nd Floor)

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093 PURPOSE: The purpose of the conference call between the Entergy Operations, Inc. (Entergy, the licensee), and the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation (NRR) staff is to discuss the Waterford Steam Electric Station, Unit 3, Draft NRC Request for Additional Information (RAI) for Generic Letter (GL) 2004-02, "GL 2004-02 Sump Blockage, Draft RAI" dated June 11 2009 (Agencywide J

Documents Access and Management System (ADAMS)

Accession No. ML091730283); provide feedback on the licensee's plans and discuss any points of disagreement; and discuss the licensee's path forward.

CATEGORY 1:* This is a Category 1 meeting via conference call. Interested members of the public can participate in this meeting via a toll-free audio teleconference and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. Please call one of the meeting contacts

M. Markley -2 listed below before August 21. 2009. 4:30 p.m. (Eastern Standard Time) to get the telephone number and the pass code.

Proprietary information may be discussed at certain times during the meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.

PARTICIPANTS: NRC Waterford 3 M. Scott R. Murillo J. Lehning G. Ferguson S. Smith N. Petit N. Kalyanam B. Lanka et al. M. Mason et al.

MEETING CONTACTS: Kaly N. Kalyanam, NRR Alan B. Wang, NRR 301-418-1480 301-415-1440 kaly.kalyanam@nrc.gov alan.wang@nrc.gov Michael Mason, Entergy 504-739-6673 mmason@entergy.com The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket Nos. 50-382

Enclosure:

Agenda cc w/encl: Distribution via Listserv

M. Markley -2 listed below before August 21,2009,4:30 p.m. (Eastern Standard Time) to get the telephone number and the pass code.

Proprietary information may be discussed at certain times during the meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.

PARTICIPANTS: NRC Waterford 3 M. Scott R. Murillo J. Lehning G. Ferguson S. Smith N. Petit N. Kalyanam B. Lanka et al. M. Mason et al.

MEETING CONTACTS: Kaly N. Kalyanam, NRR Alan B. Wang, NRR 301-418-1480 301-415-1440 kaly. kalyanam@nrc.gov alan.wang@nrc.gov Michael Mason, Entergy 504-739-6673 mmason@entergy.com The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket Nos. 50-382

Enclosure:

Agenda cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMWaterford Resource PKlein, NRRlDSS/SSIB LPLIV Reading RidsOgcRp Resource JClark, RIV RidsAcrsAcnw_MailCTR Resource RidsOpaMail Resource LTrocine, EDO RIV RidsNrrAdro Resource RidsRgn4MailCenter Resource SBurnell, OPA RIV RidsNrrDorl Resource CTucci, NRR OWFN Receptionist (paper)

RidsNrrDorlLpl4 Resource SSmith, NRRlDSS/SSIB TWFN Receptionist (paper)

RidsNrrDssSsib Resource MScott, NRRlDSS/SSIB PMNS Resource RidsNrrLAJBurkhardt Resource JLehning, NRRlDSS/SSIB ADAMS Accession No ML092090107 OFFICE NRR/LPL4/PM NRR/LPL4/LA DSS/SSIB/BC NRR/LPL4/BC NRR/LPL4/PM MScott RArchitzel NAME NKalyanam JBurkhardt for MMarkley NKalyanam DATE 8/3/09 8/3/09 8/5/09 8/5/09 8/6/09