MONTHYEARW3F1-2004-0075, Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program2004-09-13013 September 2004 Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program Project stage: Request W3F1-2005-0005, 90 Day Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2005-03-0303 March 2005 90 Day Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0515305472005-05-27027 May 2005 RAI Related to GL 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at pressurized-water Reactors Project stage: RAI ML0516605012005-06-0202 June 2005 RAI Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0521402772005-07-28028 July 2005 Part 21 Deficiency Report Re Framatome Anp Supplied Pressurizer Heaters with Internals Manufactured by Thermocoax. Initially Reported on 07/22/05 Project stage: Request ML0603903862006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accident at Pressurized-Water Reactors Project stage: RAI ML0733900652007-12-10010 December 2007 Approval of Extension Request, Corrective Actions Due Date, GL 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: Other ML0801400072008-01-28028 January 2008 Report on Results of Staff Audit of Corrective Actions to Address GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at PWRs Project stage: Other ML0801403182008-01-28028 January 2008 Staff Audit Report on Results of Corrective Actions to Address GSI-191 GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at PWRs Project stage: Other ML0917302832009-06-11011 June 2009 Email, Draft Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: Draft RAI ML0917302852009-06-11011 June 2009 Draft Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: Draft RAI ML0920901072009-08-0606 August 2009 Notice of Conference Call with Entergy Operations, Inc. to Discuss Draft Request for Additional Information on Generic Letter 2004-02 for Waterford, Unit 3 Project stage: Draft RAI ML0925101242009-09-22022 September 2009 RAI, Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents Project stage: RAI ML0927200322009-10-0101 October 2009 Notice of Forthcoming Conference Call with Entergy Operations, Inc. to Discuss Waterford Steam Electric Station, Unit 3, Planned Response to Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML1005400832010-02-24024 February 2010 Forthcoming Conference Call with Entergy Operations, Inc. to Licensees Responses to NRC Generic Letter 2004-02 for Waterford Steam Electric Station, Unit 3 Project stage: Request ML1006903722010-03-0808 March 2010 Licensee Slides from 3/8/2010 Meeting Generic Letter 2004-02 Response to RAIs Project stage: Response to RAI ML1007003012010-04-0707 April 2010 Summary Follow-Up Conference Call with Entergy Operations, Inc. to Discuss Draft Response for Waterford, Unit 3, to the Request for Additional Information for Generic Letter 2004-02 Project stage: Draft RAI ML1013400612010-05-18018 May 2010 Notice of Forthcoming Conference Call with Entergy Operations, Inc. to Discuss Draft Response on GL-2004-02 for Waterford Steam Electric Station, Unit 3 Project stage: Draft Other ML1015204762010-06-0101 June 2010 Email, Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML1015302322010-06-0909 June 2010 Summary of Conference Call Meeting with Entergy Operations, Inc. to Discuss Draft Response on GL-2004-02 for Waterford Steam Electric Station, Unit 3 ML1017301902010-06-17017 June 2010 Revised Responses to the Request for Additional Information Related to GL-2004-02 Project stage: Request ML1017301952010-06-17017 June 2010 Revised Responses to the NRCs Request for Additional Information Related to GL-2004-02 Project stage: Request ML1017302002010-06-17017 June 2010 Chemical Effects Summary Related to RAI Response to GL-2004-02 Project stage: Other W3F1-2010-0032, Response to Request for Additional Information Regarding Final Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2010-11-23023 November 2010 Response to Request for Additional Information Regarding Final Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Supplement 2009-06-11
[Table View] |
Text
From:
MASON, MICHAEL E (WF3) [MMASON@entergy.com]
Sent:
Thursday, June 17, 2010 8:58 AM To:
Kalyanam, Kaly Cc:
PETIT, NICHOLAS; LANKA, BRIAN; HARDIN, WILLIAM A; MURILLO, ROBERT J; POLLOCK, JIM; STEELMAN, WILLIAM J; WILLIAMS, JOE D
Subject:
FW: GSI-191 Items for NRC review Attachments:
Revised RAIs 18 33 33a.pdf; Waterford 3 Chemical Effects Summary.pdf
- Kaly, Attached are the items to be provided to the NRC the week of 6/14/10 from the 6/1/10 teleconference.
- Thanks, Mike M.
P.S. Please provide to Michael Scott and other associated reviewers, as necessary.
Michael E. Mason Technical Specialist IV Internal Number 8-580-6673 External Number (504) 739-6673 WGSB-318 email: mmason@entergy.com From: PETIT, NICHOLAS Sent: Wednesday, June 16, 2010 3:46 PM To: MASON, MICHAEL E (WF3)
Cc: FERGUSON, GREGORY N
Subject:
GSI-191 Items for NRC review Mike; Attached are the items we committed to providing the NRC this week. We request that the NRC review the Chemical Effects Summary as soon as possible and provide feedback. We will start testing next week and will be utilizing the chemical effects loading ad stated in the summary.
Thanks; Nicholas Petit, P.E.
Entergy Nuclear - Waterford 3 Design Engineering - Mechanical Systems Internal: 8-580-6215 External: 504-739-6215 Mail Unit: W-GSB-240 Email: npetit@entergy.com
E-mail Properties Mail Envelope Properties (225B641F236D1D41ABB517AC4040CDA506BBC05D)
Subject:
FW: GSI-191 Items for NRC review Sent Date: 6/17/2010 8:58:19 AM Received Date: 6/17/2010 8:58:19 AM From: MASON, MICHAEL E (WF3)
Created By: MMASON@entergy.com Recipients:
Kaly.Kalyanam@nrc.gov (Kalyanam, Kaly)
Tracking Status: None npetit@entergy.com (PETIT, NICHOLAS)
Tracking Status: None BLANKA@entergy.com (LANKA, BRIAN)
Tracking Status: None whardin@entergy.com (HARDIN, WILLIAM A)
Tracking Status: None RMURILL@entergy.com (MURILLO, ROBERT J)
Tracking Status: None RPOLLOC@entergy.com (POLLOCK, JIM)
Tracking Status: None wsteelm@entergy.com (STEELMAN, WILLIAM J)
Tracking Status: None jwill13@entergy.com (WILLIAMS, JOE D)
Tracking Status: None Post Office:
CCTEXETSP006.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 131670 6/17/2010 Revised RAIs 18 33 33a.pdf 82754 Waterford 3 Chemical Effects Summary.pdf 39588 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False
Sensitivity: olNormal Recipients received: