ML20052H530

From kanterella
Revision as of 14:38, 10 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Apr 1982
ML20052H530
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/13/1982
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20052H531 List:
References
NUDOCS 8205210178
Download: ML20052H530 (1)


Text

Malling Address Ala:*ama Powar Company p'

. 600 North 18th Street .

Post Office Box 2641 Garmingham. Alabama 3$291 Telephone 205 783-6081 A

F. L. Clayton, Jr.

Senior Vice President Flintndge Building Alabama Power ite souther.1 e'ecJrc Spslem May 13, 1982 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the April, 1982 Monthly Operating Report for Joseph ri. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Specifi-cations. As requested by letter from Mr. John F. Stolz to Mr.

R. Alan Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, F. . Clayto , Jr.

FLCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies) -

Director, RII (l copy)

}C$

t i 8205210178 820513 PDR ADOCK 05000364 R PDR