JOSEPH M. FARLEY NUCLEAR PLANT l
UNIT 2 l
NARRATIVE
SUMMARY
OF OPERATIONS APRIL, 1982 i
There was one (1) automatic shutdown' in the month of April.
The following safety-related maintenance was performed in the month of April:
l.
Performed miscellaneous maintenance on diesel generators.
2.
Replaced packing on #3 and #6 river water pumps.
l 3.
Unclogged boron injection tank sample lines.
4.
Repacked 2B charging pump discharge valve packing.
1 t
+
s 1
u.
~.,82'05210183 820513 PDR ADOCK 05000364.
t
^'
R PCR
- y-
,4-a y
- N %-
g.,
._lg,'._l
OPERATING DATA REPORT
~
DOCKET NO.
50-364 DATE _5/07/82 COMPLETED BY W.G. Hairston, III TELErilONE (205) 899'5156 OPER ATING STATUS I* Unit N'":
Joseph M. Farley - Unit 2 Notes 1) Cumulative data since 7/30/81, date of
- 2. Reporting Period:
April. 1982 comdal gemh
- 3. Licensed 1hermal Power IMWt p:
2652
- 4. Nameplate Rating IGross MWe):
860
- 5. Design Electrical RatingiNet MWe):
829
- 6. Maximum Dependable Capaciay (Gross MWe):
854.7
- 7. Maximum Ocpendable Capacity (Net MWe):
813.7
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since Last Report, Gise Reasons:
N/A m
- 9. Power Lesel To Which Restricted. lf Any INet MWe):
N/A
- 10. Reasons For Restrictions,li Any:
N/A l
1his Month Yr.-to Date Cumulatise i
- 11. ilours in Reporting Period 719 2,879 6.600 12, Number Of Ilours Reactor Was Critical 714. 9 2.176.8 5,857.0 4
i
- 13. Reactor Resene Shutdown llours 4.1 67.0 107.8
- 14. Ilours Generator On-Line 712.6 2.096.3 5.762.8
- 15. Unit Resene Shutdown floun 0
0 0
- 16. Gross Thermal Energy Generated (MWill 1.855.620 5.114.796 14.580.953
- 17. Gross Eicctrical Energy Generated (MWill 600J Q2 _,..
1;641;71R 4.715.116
- 18. Net Electrical Energy Generated (MWH) 571.186 1.546.804 4_467.524
- 19. Unit Senice Factor 99.1 72.8
~
87.3
- 20. Unit Availability Factor 99.1 72.8 87.3
- 21. Unit Capacity Factor iUsing MDC Net) 97.6 66.0 83.2
- 22. Unit Capacity Factor IUsing DER Net) 95.8 64.8 81.7
- 23. Unit Forced Outage Rate
.9 27.2 12.7
- 24. Shutdowns Scheduled Over Nest 6 Months i Type. Date,and Duration of Each):
N/A
- 25. If Shut irown At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status IPrior o Commercial Operation):
Forecast Achiesed i
INI TI A L CRITICA LITY 5/06/81 5/08/81 INillAL ELECTRICITY 5/24/81 5/25/81 COMMERCIA L OPER A flON 8/01/81 7/30/81 08/77)
~ -. -
DOCKET.'i0.
50-364 N
D E 5/0 COSfPLETED BY W.C. Hairston._l!I
'1ILEFl!ONE (205) 899-5156 MONT11 Anvil DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE D AILY POWER LEVEL (SlWe Net)
(\\lWe-Net)
I.
813 17 774 13 801 2
795 3
801 39 801 4
R77 20 Ron 3
_816 21 809 6
821 22 823 7
826 23 Rn?
,s 8
819 24 806 9
785 25 718 10 808 26 814 11 804 n
816 12 820 23 por 13 473
,9 816 g.t 774 30 778
~
15 795 33 16 795 I?LSIRUCIIONS On this form:r. list the average daily unit power levelin MWe Net for each d:y in the reporting month. Compute to
, the nearest whole nc;swatt.
k9(i7) l
- s..c i
- /,
UNIT SiluTDOWNS AND POWER REDUC 110NS DOCKET NO.
5ts-164 UNIT NAME J. M.
Farley-Lttit 2 DATE 5/07/82 H2 PORT MONTil April,19Q2 COMPLETED BY W.G. Hairston, III TELEPHONE (205) 899-5156 i
w a
E j
5 Licensee
$v.
~
g*3L Cause & Corrective w
No.
D.ste g
gg
,3 g 5 Event u7
$3 5
jisj R* Port #
f"O Action to 550 Psevent Recurrence b
007 820413 F
6.4 G
3 NA ED ZZZZZZ Reactor trip.
IDSP "B" Train due to inadvertent actuation of relays at the switchhouse dur.ing routine testing.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Pseparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Shecu for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & IJcense Examination F-Administrative 5
G-Operational Errut (Explain)
E shibit I. Same S.auwe (9/77)
II 0:her (Explain)
n
'I JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS APRIL, 1982 There was one (1) automatic shutdown in the month of April.
The following safety-related maintenance was performed in the month of April:
1.
Performed miscellaneous maintenance on diesel generators.
i 2.
Replaced packing on #3 and #6 river water pumps.
3.
Unclogged boron injection tank sample lines.
4.
Repacked 2B charging pump discharge valve packing.
t i
l I
I c
OPERATING DATA REPORT DOCKET NO. __50-364 DATE - 5/07/82 COMPLETED HY W.G. Hairston, III TELEPIIONE (205) 899-5156 OPERATING STAT US I Unit Name:
Joseph M. Farley - Unit 2 Notes 1) Cumulative data since 7/30/81, date of
- 2. Reporting Period:
Anril. 1982 commercial operation.
- 3. Licenwd T henna! Power IMWII:
2652 860
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): - 829
- 6. Maximum Dependable Capacity (Gross MWe):
854.7
- 7. Maximum Dependable Capacity (Net MWe):
813.7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
N/A
- 9. Power Lesel To Which Restricted. If Any (Net MWe):
N/A
- 10. Reasons For Restrictions.lf Any:
N/A This Month Yr.-to.Date Cumulatise i1. ilours In Reporting Period 719 2,879 6,600
- 12. Number Of flours Reactor Was Critical 714.9 2.175.8 5,857.0
- 13. Reactor Resene Shutdown Honrs 4.1 61.0 107.8
- 14. Ilours Generator On-Line 712.6 2.096.3 5.762.8
- 15. Unit Resene Shutdown Hours 0
0 0
- 16. Cross Thermal Energy Generated (MP!HI 1,855.620 5.114.796
.14.580.953 17 Grow Electrical Energy Generated (MWH1 600JQ2_, _ A641. 71R 4.715.116
- 18. Net E!cetrical Energy Generated (MWH) 571.186 1.546.804
- 4.467 g c4
- 19. Unit Senice Factor 99.1 72.8 87.3
- 20. Unit Availabilite Factor 99.1 72.8 87.1
- 21. Unit Capacity Factor IUsing MDC Neo 97.6 66.0 83.2
- 22. Unit Capacity Facior (Using DER Net) 95.8 64.8 81.7
- 23. Unit forced Outage Rate
.9 27.2 12.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eachl:
N/A
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status iPrior o Commercial Operstmnl:
Forecast Achiesed INi flA L CRITICA LITY 5/06/81 5/08/81 h
INill AL ELECTRICITY 5/24/81 5/25/81 COMMERCIAL OPER A TION 8/01/81 7/30/81 i
el/77 l
l L
r
=
DOC)2.T NO.
50-364 UNIT J.M. Farl y-Unit 2 5/07/82 DAE CO5fPLETED BY W.C. Hairston. III i
TELEPl!ONE (205) 899-5156 Slotml Anvil DAY AVERAGE DAILY l'OWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Athe Net)
(SIWE Net)
I, 813 17 774 801 2
795 13 801 3
803 19 4
A77 20 ROO 5
816 21 809 821 22 823 s
7 826 23 an?
,.s, 8
819 24 806 9
785 25 718 10 808 26 814
- II 804 27 816 12 820 23 goa 816 473 29 I3 778 774 30 14 15 795 31 16 795 INSIRUCITONS On this fomut. list the svenge daily umt power leveli< MWe Net for each d:y in the reporung month. Compute to
, the neare:t whole nepw.itt.
e
~e (9/77) q we 4'
e E
'T""
w w * ' ~ -
= = -
3 s
,o i
UNIT SiluTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-364 UNIT NAME J. M.
Farley-Unit 2 DATE 5/07/82 COMPLETED gy W.G. Hairston, III REPORT MONTH April.1992 TELEPHONE (205) 899-5156 F.
% so 5 6
c r6 No.
Date E.
'S I
'S.gg Licensee 5*.,
g%
Cause & Corrective
~
sx Event gi gU 4cigo,,,
g p
33 g
g$[
u> G Report #
g Prevent Recurrence 0-d 007 820413 F
6.4 G
3 NA ED ZZZZZZ Reactor trip.
LOSP "B" Train due to inadvertent actuation of relays at the switchhouse dur.ing routine
- testing, i
i 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File INUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & Ucense Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I.Same Source (9/77) ll-Other (Explain)
---