Updated Inspection Plan for R. E. Ginna Nuclear Power Plant - Inspection Report 05000244/2017005
ML17241A040
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/28/2017
From: Anthony Dimitriadis
Reactor Projects Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2017005
Download: ML17241A040 (4)


Text

August 28, 2017

Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: UPDATED INSPECTION PLAN FOR R. E. GINNA NUCLEAR POWER PLANT - INSPECTION REPORT 05000244/2017005

Dear Mr. Hanson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for your R. E. Ginna Nuclear Power Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. In addition to normal baseline inspection, the NRC will be performing infrequent inspections under Inspection Procedure 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants," and Inspection Procedure 71003, "Post-Approved Site Inspection for License Renewal." Please contact me at 610-337-6953 with any questions you have regarding this letter.

Sincerely,/RA/ Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket No. 50-244 License No. DPR-18

Enclosure:

Inspection Plan cc: Distribution via ListServ