Discusses FOIA Request for Insp & Inquiry Repts Made by Intervenor Tm Belser,Jr,On Behalf of Carolina Environ Study Group
ML19312C547
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/01/1972
From: Willie Lee
DUKE POWER CO.
To: Bloch E
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7912160107
Download: ML19312C547 (3)


Text

~

~ Tmim Pownn Goxmxy r-)

,

  • Powna Ben.Emo Box 2170. CHARLOTTE.N. G. sesot

. - .. a .

.* ::."l::',;L..

September 1,1972 Mr Edward J Bloch 3cputy Director of Regulation U S Atcmic Energy Commission Washington, O C 20545

Dear Mr Bloch:

This refers to the letter dated August 25,1972, to the Duke Power Company f rom Mr John Davis, Director, Region 11, Directorate of Regulatory Operations. This is the same matter which our counsel, Troy B Conner, discussed with you, Howard Shapar and Kathleen Shea this week. Robert Dick of our company has also discussed the matter with C E Murphy of Region ll.

The August 25 letter notified us that the AEC will make public reports of Inspection and Inquiries by Regulatory Operations personnel of our Oconee Nuclear Station pursuant to the Freedom of Information Act. We understand that your letter refers to the request made over six months ago by Mr Townsend M Belser, Jr., counsel for the Carolina Environmental Study Group (CESG) for use in the pending proceeding involving the McGuire Nuclear Station in a letter dated February 10, 1972. This letter also requests such information with respect to the Sequoyah and Trojan nuclear power stations.

As we have advised you, we believe tnat in the McGuire proceeding Mr Belser has been provided with all necessary information for use in this case and that there is no valid outstanding request. During the extensive prehearing procedures followed, Mr Belser was asked by the Board to consolidate his .

request for information, and he did so in a document entitled, " Supplemental Motion for Production of Document.s by the Atomic Energy Commission" dated March 17,1972. In this pleading he reserved his rights with respect to the previous motion dated February 11,1972, but did not refer to the February 10 letter. ,

Mr Belser has made frequent requests for information in the proceeding, but has not pursued the request under the Freedom of Information Act. We believe that this request was in fact merged in his various requests for documents.

The staff appeared to follow 'this approach in its July 31,1972 letter transmitting " enforcement correspondence" to Mr Belser in referring to his supplemental motion for the production of documents rather than any request under the Freedom of Information Act.

, rec'd Off. Dir. Of R4 care #alv>- y_q3 6

nme. s s o r q 9121601 p7 4gD

2 -

- D Q it is, therefore, our billef that the information sought by Mr Belser

~

relating to the radiological safety issues has already been provided and that the time for further production of information on such matters in this proceeding has passed. Ve believe these facts clearly demonstrate that there is no outstanding request by Mr Belser for any information under the Freedom of 'nformation Act.

For these reasons we protest the regulatory staff prcposal to provide the approximately 1200 pages of reports to the intervenor in this proceeding at this late date. Our objection is not based upon the contents of the recorts, but upon the fact that the AEC's failure to act on the original request for over six months may seriously prejudice the applicant's rights in the McGuire proceeding. We also believe that furnishing this information exceeds the requirements of the Freedom of Information Act and the Commission's regulaticns.

While it is unlikely that these reports will be of use to anyone in the McGuire proceeding, CESG can seek delays in the case while its representatives study the 1200 pages of reports on Oconee. Presumably, similar delays could be occasioned if the regulatory staff furnishes compliance reports on other cases.

We have in many documents filed in this proceeding shcwn the public need for the power to be produced from the Mc Guire units on schedule. Although the notice of hearing in this proceeding was issued over 14 months ago, regulatory delays have permitted only 4 days of hearing thus far.

For these reasons we believe that the AEC's furnishing these reports is unwarranted, may seriously prejudice the applicant by creating an additional, unnecessary delay in completing the hearing, and is contrary to the public Interest.

Another problem results from the time requirement set forth for us to act in Mr Davis' letter. Only a single copy of some 1200 pages of reports involving several companies were furnished to the appil 4r* cne week ago. We are nevertheless requested to review all of this seta-f al," Identify specifically" any proprietary info mation, and the reason for such proprietary classification by September 6.

Our analysis of the reports demonstrates that the design and construction of I the Oconee station has been carried out with meticulous attention to all safety matters and confirms the high quality of the work performed. The reports reflect the depth of review by the Directorate of Regulatory Operations which should

! also provide further assurance to the public as to the safety of the station.

Duke Power Comoany does not object to these reports being made public and will not requere that any part be. withheld pertaining to its operations.

Nevertheless, various other companies are referred to in the reports which some of the reports themselves describe as invoiving proprietary information.

We are contacting these companies to determine what, i f any, information they now believe should be withheld pursuant to the AEC's regulations. However, it does not appear possible to complete this work by September 6 as requested in Region 11 Regulatory Operations letter.

l w v - ~ 'ye

)-3 -

]

In this regard we will advise Region 11 Regulatory Operations of any proprietary Information dealing with the Oconee site reports by September 6. As to shop inspection reports involving approximately 7 other comoanies who have provided various components and equipment for the plant, we will also provide a list of these reports and a list of the reports which have not been cleared for proprietary Information by that date. The will clear these as soon thereaf ter as possible.

As a final matter, we think it is important that any document making public the inspection reports place them in procer perspective as a matter of public understanding. As any experienced person in the atcmic energy field is aware, inspection reports are not written as public documents. They, centain much " shorthand" and the writer's unsupported opinions in many instances.

By definition they list only matters which the Inspector believes require attentien. On the other hand, the reports do not always reflect when such matters have been resolved. Many of the items listed in the reports were called to the Inspectors attention by applicant personnel and relate to matters which had already been corrected at that time.

We believe that these points should be made with respect to any inspection l reports released.

As noted above we believe that knowledgeable persons will agree that these reports confirm the applicant's meticulous attention to safety matters in constructing the station. In general the reports deal with documentation and maintaining records rather than substantive problems. We believe that these facts should be reflectec in any AEC document making public these reports, as well as the fact that although routine construction deficiency notices have been written, Region ll Regulatory Operations has directed no letters whatsoever to Duke involving any violations or'hafety items."

Sincerely yours, W S Lee Senior Vice President, Engineering and Cor.struction cc: John G Davis Di rector .

Directorate of Angulatory Ocerations Atlanta, Georgia 30303

- - - - - _ . -