(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20149G1941993-09-13013 September 1993 Partial Response to FOIA Request for Listed OI Repts.Record Listed in App D Being Withheld from Public Disclosure Because It Consists of Records Compiled for Law Enforcement Purposes.Nrc Continuing to Review Records Re FOIA Request IA-93-355, Partial Response to FOIA Request for Listed OI Repts.Record Listed in App D Being Withheld from Public Disclosure Because It Consists of Records Compiled for Law Enforcement Purposes.Nrc Continuing to Review Records Re FOIA Request1993-09-13013 September 1993 Partial Response to FOIA Request for Listed OI Repts.Record Listed in App D Being Withheld from Public Disclosure Because It Consists of Records Compiled for Law Enforcement Purposes.Nrc Continuing to Review Records Re FOIA Request ML20072C9611993-06-18018 June 1993 FOIA Request for Listed OI Repts ML20079D3191991-06-10010 June 1991 Forwards B Tatalovich Correspondence Re Plant ML20235A1251987-12-16016 December 1987 Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs ML20235W0981987-10-13013 October 1987 Final Response to FOIA Request for Records.No Records Subj to Request located.FOIA-87-40 in Name of Thomas Available in PDR IA-87-676, Final Response to FOIA Request for Records.No Records Subj to Request located.FOIA-87-40 in Name of Thomas Available in PDR1987-10-13013 October 1987 Final Response to FOIA Request for Records.No Records Subj to Request located.FOIA-87-40 in Name of Thomas Available in PDR ML20235W0951987-10-0808 October 1987 FOIA Request for All FOIA Requests Made for Zimmer Plant or GE Mark I or II Containment by Cincinnati Gas & Electric, Dayton Power & Light or Columbus & Southern Ohio Electric & FOIA 87-40 ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20234E4571987-06-23023 June 1987 Partial Response to FOIA Request for 771026 Minutes of ACRS Subcommittee on Fluid/Hydraulic Dynamic Effects Meeting in Portland,Or & Addl ACRS Documentation.Documents Identified on App H & Addl ACRS Documents Encl ML20209G6751987-03-27027 March 1987 FOIA Request for All Matls Made Available in Accordance W/ FOIA 87-40 & All Matls Produced to Either Plaintiffs in Zimmer Litigation &/Or GE ML20212H6601987-01-20020 January 1987 Final Response to FOIA Request.App F Documents Re Marviken II Project Encl & Available in PDR ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20210L2601986-03-20020 March 1986 Forwards Endorsement 31 to Nelia Policy NF-206 ML20141N2771986-01-14014 January 1986 Partial Response to FOIA Request for Seven Classes of Documents.Forwards App a Documents.App B Documents Available in Pdr.App C Documents Outside Scope of Request,Per 860114 Telcon W/Ca Reed ML20140F3691986-01-14014 January 1986 Further Response to FOIA Request for Several Categories of Documents Re Pressure Suppression Containment.Fsar & SER for Limerick Only Documentation Re 4x4 Tests.Encl Apps D-G Documents Responsive to Item 4 Also Available in PDR ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20136D8751985-11-0606 November 1985 Further Response to FOIA Request for Documents Re H Hoyt & Aloot Oct 1983 Rept on NRC Investigations at Facility. Listed Documents Encl & Available in Pdr.Certain Documents Totally Withheld (Ref FOIA Exemptions 5 & 7) ML20136J3371985-08-0101 August 1985 Final Response to FOIA Request for Documents Re Facility.Documents Listed on Encl Printout Located in Ofc of Investigations.Documents Withheld (Ref FOIA Exemptions 5 & 7) IA-84-604, Responds to FOIA Request for Documents Re Ofc of Investigation Repts on Facility.Documents Listed on Encl Printout Located in Ofc of Investigations as of 850227. Documents Withheld (Ref FOIA Exemptions 5 & 7)1985-08-0101 August 1985 Responds to FOIA Request for Documents Re Ofc of Investigation Repts on Facility.Documents Listed on Encl Printout Located in Ofc of Investigations as of 850227. Documents Withheld (Ref FOIA Exemptions 5 & 7) IA-83-684, Final Response to FOIA Request for Documents Re Facility.Documents Listed on Encl Printout Located in Ofc of Investigations.Documents Withheld (Ref FOIA Exemptions 5 & 7)1985-08-0101 August 1985 Final Response to FOIA Request for Documents Re Facility.Documents Listed on Encl Printout Located in Ofc of Investigations.Documents Withheld (Ref FOIA Exemptions 5 & 7) ML20134D7991985-08-0101 August 1985 Responds to FOIA Request for Documents Re Ofc of Investigation Repts on Facility.Documents Listed on Encl Printout Located in Ofc of Investigations as of 850227. Documents Withheld (Ref FOIA Exemptions 5 & 7) IA-83-787, Responds to FOIA Request for Documents Which Resulted in Issuance of Notice of Violation to Util in Nov 1981. Documents Withheld (Ref FOIA Exemptions 5 & 7)1985-07-31031 July 1985 Responds to FOIA Request for Documents Which Resulted in Issuance of Notice of Violation to Util in Nov 1981. Documents Withheld (Ref FOIA Exemptions 5 & 7) IA-83-655, Final Response to FOIA Request for Documents Re Wh Zimmer Nuclear Power Station.Forwards Computer Printout of Document.W/O Encl.Documents Contained in Ofc of Investigation Files Withheld (Ref FOIA Exemptions 5 & 7)1985-07-31031 July 1985 Final Response to FOIA Request for Documents Re Wh Zimmer Nuclear Power Station.Forwards Computer Printout of Document.W/O Encl.Documents Contained in Ofc of Investigation Files Withheld (Ref FOIA Exemptions 5 & 7) ML20133Q2231985-07-31031 July 1985 Responds to FOIA Request for Documents Which Resulted in Issuance of Notice of Violation to Util in Nov 1981. Documents Withheld (Ref FOIA Exemptions 5 & 7) ML20134D5821985-07-31031 July 1985 Final Response to FOIA Request for Documents Re Wh Zimmer Nuclear Power Station.Forwards Computer Printout of Document.W/O Encl.Documents Contained in Ofc of Investigation Files Withheld (Ref FOIA Exemptions 5 & 7) ML20133Q3771985-07-29029 July 1985 Responds to FOIA Request for Ofc of Investigations Documents Re Wh Zimmer Nuclear Power Station.Forwards List of Documents as of 840227.All Documents Withheld (FOIA Exemptions 5 & 7) ML20129J4671985-07-15015 July 1985 Informs That Util 821124 Application for Extension of Const Completion Date Fee Exempt.Refund Being Processed ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20133B5651985-05-10010 May 1985 Partial Response to FOIA Request for Four Categories of Documents Re Facility.Forwards App a Documents.Documents Also Available in Pdr.App B Documents Already Available in Pdr.Search Continuing ML20129E9971985-05-0909 May 1985 Responds to FOIA Request for Compilations of Results of Operator Licensing & Requalification Exams.App a Documents Placed in Pdr.App B Documents Already in PDR ML20127F5341985-04-18018 April 1985 Partial Response to FOIA Request for Records Re BNL Investigation of Ee Kent Allegations.Forwards App a Documents.Documents Also Available in Pdr.Remaining Documents Will Be Forwarded Upon Completion of NRC Review ML20099M2911985-03-15015 March 1985 Forwards Endorsement 27 to Nelia Policy NF-249 ML20129B9301985-02-19019 February 1985 FOIA Request for Documents Re DOJ Inquiry Into Potential Wrongdoing by NRC Employees in Dealing W/Tmi & Zimmer Plants & Dh Gamble Testimony from TMI Restart Proceeding ML20100B6181985-01-30030 January 1985 Forwards Payment of Bill D-0089.Fee Paid.W/O Encl ML20125B8661985-01-17017 January 1985 Further Response to FOIA Request for Documents Re Oct 1983 Rept by H Hoyt & Aloot on NRC Investigations.Forwards App a Documents.Documents Also Available in Pdr.Info Partially Withheld (Ref FOIA Exemptions 2,6 & 7) ML20128E4161984-12-27027 December 1984 Interim Response to FOIA Request for All Agency Documents Re Oct 1983 Rept by Judge H Hoyt & Aloot on NRC Investigations at Facility.Forwards Documents.Documents Partially & Completely Withheld (Ref FOIA Exemptions 5-7) ML20101F7621984-12-20020 December 1984 Forwards Endorsement 26 to Nelia Policy NF-249 ML20129J2141984-12-0707 December 1984 Responds to FOIA Request for Interim or Final Repts Generated by Ofc of Investigation Re Facility.Documents Withheld (Ref FOIA Exemption 5) ML20093M2541984-10-18018 October 1984 Requests Written Verification of Implementation of Site Restoration Plan So CPPR-88 May Be Terminated ML20129J2031984-10-11011 October 1984 FOIA Request for Interim or Final Repts Generated by Ofc of Investigation Re Facility ML20107L6521984-07-19019 July 1984 FOIA Request for All Documents Re Insp Rept 50-358/84-04 ML20105C9801984-07-19019 July 1984 FOIA Request for Documents Re Ofc of Investigation Rept on Facility.If Requested Matls Still Protected,Copies of Matls W/Protected Sections Redacted Requested ML20151J1601984-06-0505 June 1984 Forwards IE Insp Rept 50-358/84-04 on 840220-0426.Insp Covered Status of Welding Procedure & Welder Performance Qualifications ML20091L5991984-06-0404 June 1984 Forwards Util 840601 Response to NRC 840503 Request for Addl Info Re Environ Review of Request to Withdraw Application for Ol.Five Oversize Drawings Encl.Aperture Cards Are Available in Pdr.Related Correspondence ML20091J1321984-06-0101 June 1984 Forwards Environ Review of Zimmer Site Status for Cincinnati Gas & Electric Co, in Response to NRC 840503 Request for Addl Info Re Withdrawal of OL Application.W/ Three Oversize Figures.Apertures Cards Are Available in PDR ML20091A2141984-05-22022 May 1984 Forwards Ohio Edison Annual Rept,1983, Toledo Edison Co 1983 Annual Rept, Duquesne Light Co Annual Rept,1983 & Cleveland Electric Illuminating Co 1983 Annual Rept ML20128E3861984-05-22022 May 1984 FOIA Request for All Agency Records or Info Re Oct 1983 Rept by Judge H Hoyt & Aloot Re NRC Investigations at Facility ML20084P2401984-05-11011 May 1984 Advises That Addl Info for Environ Review of Request to Withdraw OL Application Will Be Provided by 840601,per 1993-09-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20072C9611993-06-18018 June 1993 FOIA Request for Listed OI Repts ML20079D3191991-06-10010 June 1991 Forwards B Tatalovich Correspondence Re Plant ML20235A1251987-12-16016 December 1987 Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs ML20235W0951987-10-0808 October 1987 FOIA Request for All FOIA Requests Made for Zimmer Plant or GE Mark I or II Containment by Cincinnati Gas & Electric, Dayton Power & Light or Columbus & Southern Ohio Electric & FOIA 87-40 ML20209G6751987-03-27027 March 1987 FOIA Request for All Matls Made Available in Accordance W/ FOIA 87-40 & All Matls Produced to Either Plaintiffs in Zimmer Litigation &/Or GE ML20210L2601986-03-20020 March 1986 Forwards Endorsement 31 to Nelia Policy NF-206 ML20099M2911985-03-15015 March 1985 Forwards Endorsement 27 to Nelia Policy NF-249 ML20129B9301985-02-19019 February 1985 FOIA Request for Documents Re DOJ Inquiry Into Potential Wrongdoing by NRC Employees in Dealing W/Tmi & Zimmer Plants & Dh Gamble Testimony from TMI Restart Proceeding ML20100B6181985-01-30030 January 1985 Forwards Payment of Bill D-0089.Fee Paid.W/O Encl ML20101F7621984-12-20020 December 1984 Forwards Endorsement 26 to Nelia Policy NF-249 ML20093M2541984-10-18018 October 1984 Requests Written Verification of Implementation of Site Restoration Plan So CPPR-88 May Be Terminated ML20129J2031984-10-11011 October 1984 FOIA Request for Interim or Final Repts Generated by Ofc of Investigation Re Facility ML20107L6521984-07-19019 July 1984 FOIA Request for All Documents Re Insp Rept 50-358/84-04 ML20105C9801984-07-19019 July 1984 FOIA Request for Documents Re Ofc of Investigation Rept on Facility.If Requested Matls Still Protected,Copies of Matls W/Protected Sections Redacted Requested ML20091L5991984-06-0404 June 1984 Forwards Util 840601 Response to NRC 840503 Request for Addl Info Re Environ Review of Request to Withdraw Application for Ol.Five Oversize Drawings Encl.Aperture Cards Are Available in Pdr.Related Correspondence ML20091J1321984-06-0101 June 1984 Forwards Environ Review of Zimmer Site Status for Cincinnati Gas & Electric Co, in Response to NRC 840503 Request for Addl Info Re Withdrawal of OL Application.W/ Three Oversize Figures.Apertures Cards Are Available in PDR ML20128E3861984-05-22022 May 1984 FOIA Request for All Agency Records or Info Re Oct 1983 Rept by Judge H Hoyt & Aloot Re NRC Investigations at Facility ML20091A2141984-05-22022 May 1984 Forwards Ohio Edison Annual Rept,1983, Toledo Edison Co 1983 Annual Rept, Duquesne Light Co Annual Rept,1983 & Cleveland Electric Illuminating Co 1983 Annual Rept ML20084P2401984-05-11011 May 1984 Advises That Addl Info for Environ Review of Request to Withdraw OL Application Will Be Provided by 840601,per ML20084M0911984-05-0404 May 1984 Advises That Preventive Maint & QA Programs Will Be Discontinued on 840518 Due to Termination of Const & Dismissal of Application.Snm Provisions Will Remain in Effect Until Removal of Matl ML20112H8101984-04-0505 April 1984 FOIA Request for Repts Resulting from Listed Environ Qualification of Equipment Site Audits to Be Placed in Pdr. Access to Any Repts Resulting from Audits Held Since Oct 1982 Also Requested ML20084P3501984-03-14014 March 1984 Requests Response to Encl W & V Smelser 840210 Inquiry Into NRC Attitude Toward Utils.Concerns Include Marble Hill & Bailly Cancellation,Withdrawal of Util Application for Zimmer & Denial of License for Byron Facility ML20114A3121984-03-12012 March 1984 FOIA Request for Facility Nonconformance Repts ML20113D2281984-03-0808 March 1984 FOIA Request for Copies of All Nonconformance Repts on Facility from Start of Const to Present ML20087D1131984-03-0505 March 1984 Forwards Natl Board of Boiler & Pressure Vessel Inspectors to State of Oh Re Util Abandonment of Facility as Nuclear Unit & Board Willingness to Provide Support Should Plant Be Reinstated ML20083P2521984-02-29029 February 1984 FOIA Request for Correspondence Between Util,Hj Kaiser & NRC Referenced in Encl Ohio Civil Rights Commission ML20114A3081984-02-28028 February 1984 FOIA Request for All Region III Insp Repts from Nov 1983 to Present & All Communications Between Region III & Bechtel, Dayton Power & Light Cincinnati Gas & Electric Co Representatives Re Facility ML20102A0241984-02-28028 February 1984 FOIA Request for Region III & IE Repts from Nov 1983 to Present & Communications Between Region III & Util,Bechtel or Kaiser Corp Officials ML20084R6521984-02-24024 February 1984 FOIA Request for Computer Printout from Sept 1980 to Present of Civil Penalty Info on 27 Listed Nuclear Facilities.Sample Format Encl ML20086P7291984-02-17017 February 1984 Forwards Revised Organization Chart,Effective as of 840217. Organizational Changes Due to Decision to Convert Station from Nuclear to coal-fueled Generating Facility ML20083N2371984-02-17017 February 1984 FOIA Request for Four Categories of Documents Re Facility ML20086P6321984-02-16016 February 1984 Confirms 840202 Telcon Understanding That,Pending Final Commission Action for Withdrawal of Application,No Need Exists to Continue Previously Required Submittals to NRC ML20083N2621984-02-16016 February 1984 FOIA Request for Interim Repts Issued by Ofc of Investigation Re Plant,Including DOJ Rept Re Harassment of QC Inspectors ML20112E1481984-02-10010 February 1984 Appeals Denial of 831123 FOIA Request for 831115 Transcript Re Pending Plant Investigations & Documents Prepared After Discussing 830701 Staff Decision Not to Approve Util Actions for Plant ML20080A9041984-01-30030 January 1984 Forwards Comments on Reactor Controls,Inc (Rci) 830915 Response to Draft IE Info Notice Re Const Deficiencies,Per 831017 Request.Work Orders for Lateral Restraint Beams Not Issued to Rci ML20079S2451984-01-27027 January 1984 Informs of 840120 Agreement to Cease Const of Facility as Nuclear Plant & Convert Plant to coal-fired Facility. Ej Wagner Designated Responsible for Closing Out Nuclear Activities at Facility ML20079P4161984-01-24024 January 1984 Requests Completion of Pending Actions on 831216 Plan to Verify Quality of Const,To Closeout Outstanding Items in 821112 Order to Show Cause & Order Immediately Suspending Const ML20079M8961984-01-20020 January 1984 Forwards Personnel Resumes Inadvertently Omitted from Re Independent Auditor for Plan to Verify Const ML20079N1991984-01-19019 January 1984 Informs That Training Directive ZPM-TR.101 & Master Training Plan Developed for NRC Review ML20079N2161984-01-19019 January 1984 Requests Written Concurrence for Training Activities,As Outlined.Facility Site Directives & Master Training Plan for All Site Training Will Be Provided to Region Iii,Per ML20079F1291984-01-16016 January 1984 Requests NRC Approval of Teledyne Engineering Svcs as Independent Design Review (Idr) Contractor.Teledyne Proposal Forwarded.Criteria Used During Evaluation & Presentation Matl from NRC 840113 Meeting Encl ML20079G1841984-01-13013 January 1984 Forwards Resumes for Principal Positions Noted on Organization Chart in Section IV of Ebasco 831205 Proposal Re Independent Auditor for Plan to Verify Const ML20080F0441984-01-13013 January 1984 Notifies of Approval of Resolution R/18-1984 Expressing City of Cincinnati Council Dissatisfaction Over NRC Failure to Require third-party Independent Review of Facility. Resolution Encl ML20086K1081984-01-13013 January 1984 Forwards Council of City of Cincinnati Resolution R/18-1984 Which Expresses Dissatisfaction Over NRC Failure to Require third-party Independent Review of Facility ML20079H2891984-01-11011 January 1984 Submits Partial Response to Util Plan to Verify Quality of Const for Facility.Counsel for Miami Valley Power Project Decision Not to Attend 840111 Public Meeting Clarified. Related Info Encl ML20086L8371984-01-11011 January 1984 Requests Development of Proposed Facility Public Oversight Committee.Committee Establishment Would Inspire Public Confidence ML20079E2401984-01-10010 January 1984 Forwards Quality Confirmation Program, Monthly Rept for Dec 1983,per Rf Warnick ML20079F3731984-01-10010 January 1984 Forwards Packet of Newspaper Articles Re Facility.Packet Acts as Chronological Summary of Major Events During 14 Months Prior to 831201 ML20080F0291984-01-10010 January 1984 Notifies of 840105 Adoption of Motion Advising NRC That Limiting Public Participation to Time Permitting at 840111 Meeting Not in Best Interest of City of Cincinnati or Citizens ML20083J1491984-01-10010 January 1984 Advises That Cincinnati City Council Adopted Vice-Mayor M Spencer Encl Motion Before Council Opposing Limited Public Participation at 840111 Meeting Between NRC & Util 1993-06-18
[Table view] Category:OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC
MONTHYEARML20081G0001983-10-18018 October 1983 Forwards Second Status Rept on Actions Taken to Field Verify That Satisfactory Remedial Actions Being Taken or Have Been Taken to Satisfy Offsite Radiological Emergency Preparedness License Condition Adopted by ASLB on 820302 ML20064J8611983-01-0404 January 1983 Clarifies FEMA .All SOPs for Plant Still Under Review.Regions Have Not Reached Any Formal Conclusions Re Status of SOPs ML20066H5781982-11-0909 November 1982 Forwards Status Rept on Offsite Emergency Preparedness Issues Per 820323 Request.Field Verifications Will Be Completed During 830607-08 Exercise.Clarification of Request in Light of ASLB 820621 Initial Decision Needed ML20028A2691982-11-0303 November 1982 Advises That Formal Findings on Offsite Emergency Plans Will Be Submitted in May,1984 ML20071L4501982-08-0606 August 1982 Forwards a Arthur to President Reagan Re Facility for NRC Consideration & Response ML20117E6211982-05-28028 May 1982 Discusses 820527 Telcon W/F Christianson Re 820526 Harassment of Inspectors.Newspaper Article Re State Insp of Boiler at Facility Encl ML20054F9011982-05-26026 May 1982 Forwards Full-Scale Exercise,811118:Final Rept & Rept on 811118 Accident Response Exercise for Wh Zimmmer Nuclear Power Station ML20051N9391982-04-22022 April 1982 Responds to NRC 820323 Memo Requesting Field Verification of Emergency Preparedness Completion Schedule Introduced Into Zimmer Hearing Record.Scheduled Completion of Verifications Set for End of Jul 1982 ML20064E1331982-03-19019 March 1982 Requests Completion Date of Insp at Facility.Criminal Investigation Might Impair NRC Civil Enforcement Efforts. Related Info Encl ML20117E5981982-02-24024 February 1982 Confirms 820818 & 19 Telcons Re Facility.No Formal Referral Presented to DOJ for Prosecution.Ie Investigation of Inspector Qualifications,Equipment,Procedures for Design Document Changes & Sys Turnover Program Continuing ML20040D6411982-01-22022 January 1982 Forwards NUREG-0654 (A-P) Evaluation of Adequacy of Offsite Emergency Preparedness.Encl Suppls 811023 Interim Findings ML20064E4191981-03-13013 March 1981 Responds to 810302 Request Re Authority of Ofc of Special Counsel,Merit Sys Protection Board,Under 5 U.S.C. 1206(b)(2) & (7).NRC Not Required to Furnish Counsel Rept on Complaint Alleging Govt Mismanagement & Gross Waste at Facility ML20070T6321981-03-13013 March 1981 Responds to Re Authority of Ofc of Special Counsel,Merit Sys Protection Board to Require NRC to Furnish Rept Re T Applegate Allegation of Mismanagement & Gross Waste at Facility ML19280B5631980-12-29029 December 1980 Forwards Info Re Allegations by Tw Applegate Concerning Conduct & Results of Investigation by NRC at Facility in May & June 1980.Rept Requested in 60 Days from Receipt of Ltr ML20235C6871971-12-27027 December 1971 Forwards Rept on Site Seismicity for Wh Zimmer Nuclear Power Station, Per Request ML20235C6761971-12-17017 December 1971 Forwards Review of Geology of Plant,Per Request ML20235D0991971-08-0505 August 1971 Responds to Requesting Comments on Cincinnati Gas & Electric Co,Columbus & Southern Ohio Electric Co & Dayton Power & Light Co Application for CP for Proposed Wh Zimmer Nuclear Power Station 1983-10-18
[Table view] |
Text
-
, 5 e
ed%M 44
[ y
+. 3+
Federal Emergency Management Agency
^
1 >
Region 1 J.W. McCormack Post Ollice and Court House Boston, Massachusetts 02109 November 3, 1982 Stuart Treby, Esquire U.S. Nuclear Regulatory Comnissicn Washington, D.C. 20555 Mail Stop MNBB 9604 Re: Matter of Cincinnati Gas and Electric Co. , et. al.
Zimrer Nuclear Power Station, Docket No. 50-358
Dear Mr. Treby:
You advised me that the ASLB panel for Zimner has inquired as to when FDR might be ready to proceed with further hearings on off-site anergency preparedness issues. Based upon the ASLB Order and subsequent denial of the Applicant's motion for modification, it is my understanding that two itens must be calpleted before FD% can proceed to address the ASLB's concems; first, that the school evacuation procedures must be canpleted and revicMx3 and that FDR's final finding in accordance with 44 C.F.R.
Part 350 (as proposed) is canpleted.
I met with the staffs of Region IV and V on October 28, 1982 to discuss these issues. I will address the final FDIA finding first.
'Ihe comonwealth of Kentucky has told FDR Region IV that they do not plan to subnit the Kentucky State and Cbunty Plans until after deficiencies that may be identified in the June 1983 exercise have been corrected. It has been our experience that there will be a four to six nonth time period before we receive the corrected plan. Thus, taking a conservative approach we would not receive the plans for review until Duh 1983. Region IV estimates that it will take them two months to have the RAC ccmplete its revicw and for the Rcgicn to incorporate the RAC coments into its analysis.
Therefore, Regico IV would have the plans ready to subnit to FDR's National Office near the end of March 1984. The National Office staff estimates another sixty days for their review and preparation of the final Fan finding would be ready in Iby 1984.
We do not have a plan subnission schedule fran the State of Ohio. Po3i on V will contact the State to obtain such a schedule. Since both State plans must be subnitted to FDR's National Office simultaneously, the Iby 1984 date could be affected by Ohio's choice of a subnission date.
Additionally, these dates are conditioned on the assumption that there am rid significant deficiencies in the several plans that need to be corrected before IWR can appn3ve.
' 8211100009 821116 . _ _]
PDR ADOCK 05000358 i O PDR , _ .
2-The second issue is the school evacuation plans. The Applicant placed a schedule of corpletion of SOP's including the sclool evacuat3on plans at the hearing. Stone and Webster did nei hdhem to this schedule. Regians IV and V have received and reviewed the SOP's. Neither Region found the SOP's acceptable at the tino.
mn originally assumed, based uron Stone and Websters representations that we would be able to accmplish verification of items during the exercise which was scheduled in Novunber 1982 At the Applicant's request, the exercise date was changed to June 1983. It is mm's intenticn to establish a procedure for field verifying those items of concern to the ASIB by the end of Novcnber. mW intends to conduct field verificaticn prior to and during the exercise in June 1983.
The ASIB indicatc<1 that once the final IT:MA finclings are coipleted, they will alloa the Intervenors an opportunity to exanine FDM on the rmaining open issues. It appears that FDM's final finding will not be availablo until thy 1984. (bnsequently, it seems that a hearing could not be held until scnetime after June 1984.
Sincerely, 1
Bu )
. ac'dy Regional Counsel t
cc: Megs liepler, NDI Frederick Sharmcks, NDI John lleard, NDI, Ib3 icn IV tbn Barent, NDI, Dogion V 4
em w