Advises That Formal Findings on Offsite Emergency Plans Will Be Submitted in May,1984
ML20028A269
Person / Time
Site: Zimmer
Issue date: 11/03/1982
From: Cassidy B
Federal Emergency Management Agency
To: Treby S
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Shared Package
ML20028A268 List:
References
NUDOCS 8211180009
Download: ML20028A269 (2)


Text

-

, 5 e

ed%M 44

[ y

+. 3+

Federal Emergency Management Agency

^

1 >

Region 1 J.W. McCormack Post Ollice and Court House Boston, Massachusetts 02109 November 3, 1982 Stuart Treby, Esquire U.S. Nuclear Regulatory Comnissicn Washington, D.C. 20555 Mail Stop MNBB 9604 Re: Matter of Cincinnati Gas and Electric Co. , et. al.

Zimrer Nuclear Power Station, Docket No. 50-358

Dear Mr. Treby:

You advised me that the ASLB panel for Zimner has inquired as to when FDR might be ready to proceed with further hearings on off-site anergency preparedness issues. Based upon the ASLB Order and subsequent denial of the Applicant's motion for modification, it is my understanding that two itens must be calpleted before FD% can proceed to address the ASLB's concems; first, that the school evacuation procedures must be canpleted and revicMx3 and that FDR's final finding in accordance with 44 C.F.R.

Part 350 (as proposed) is canpleted.

I met with the staffs of Region IV and V on October 28, 1982 to discuss these issues. I will address the final FDIA finding first.

'Ihe comonwealth of Kentucky has told FDR Region IV that they do not plan to subnit the Kentucky State and Cbunty Plans until after deficiencies that may be identified in the June 1983 exercise have been corrected. It has been our experience that there will be a four to six nonth time period before we receive the corrected plan. Thus, taking a conservative approach we would not receive the plans for review until Duh 1983. Region IV estimates that it will take them two months to have the RAC ccmplete its revicw and for the Rcgicn to incorporate the RAC coments into its analysis.

Therefore, Regico IV would have the plans ready to subnit to FDR's National Office near the end of March 1984. The National Office staff estimates another sixty days for their review and preparation of the final Fan finding would be ready in Iby 1984.

We do not have a plan subnission schedule fran the State of Ohio. Po3i on V will contact the State to obtain such a schedule. Since both State plans must be subnitted to FDR's National Office simultaneously, the Iby 1984 date could be affected by Ohio's choice of a subnission date.

Additionally, these dates are conditioned on the assumption that there am rid significant deficiencies in the several plans that need to be corrected before IWR can appn3ve.

' 8211100009 821116 . _ _]

PDR ADOCK 05000358 i O PDR , _ .

2-The second issue is the school evacuation plans. The Applicant placed a schedule of corpletion of SOP's including the sclool evacuat3on plans at the hearing. Stone and Webster did nei hdhem to this schedule. Regians IV and V have received and reviewed the SOP's. Neither Region found the SOP's acceptable at the tino.

mn originally assumed, based uron Stone and Websters representations that we would be able to accmplish verification of items during the exercise which was scheduled in Novunber 1982 At the Applicant's request, the exercise date was changed to June 1983. It is mm's intenticn to establish a procedure for field verifying those items of concern to the ASIB by the end of Novcnber. mW intends to conduct field verificaticn prior to and during the exercise in June 1983.

The ASIB indicatc<1 that once the final IT:MA finclings are coipleted, they will alloa the Intervenors an opportunity to exanine FDM on the rmaining open issues. It appears that FDM's final finding will not be availablo until thy 1984. (bnsequently, it seems that a hearing could not be held until scnetime after June 1984.

Sincerely, 1

Bu )

. ac'dy Regional Counsel t

cc: Megs liepler, NDI Frederick Sharmcks, NDI John lleard, NDI, Ib3 icn IV tbn Barent, NDI, Dogion V 4