Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
- - _ _ _ _ _ -_ -__________ ______ _ _ _ _
.g-OPERATING DATA REPORT ,
DATE August 5, 1980 COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATING STATUS .
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 [40TES A 2. REPORTING PERIOD: JULY 1980 . .
C 3. LICENSED THERMAL POWER (MWT): 1518. . .
O 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
g
- 5. DESIGN ELECTRICkL RATING (NET MWE): 497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519.
cb 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495 ~
8 . IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGil 7) SINCE LAST REPORTe GIVE REASONS:
M NOT APPLICADLE
- 9. POWER LEVEL TO WHICH RESTRICTEDe IF ANY (NET MWE): 390.0
- 10. REASONS FOR RESTRICTIONS, (IF ANY): SEXXXKTTA00lNE3EIR$ Power restriction is the result of a self-imposed D reduction in core average temperature in an attempt to inhibit corrosion of steam generator tubt.s within the tubesheet crevice. THIS MONTil YR TO DATE CUMULATIVE
- 11. Il00RS IN REPORTING PERIOD 744 5,111 85e343
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 601.4 4,218.5 70,735.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 19.1 601.3
- 14. HOVRS GENERATOR ON LINE . 600.0 4,073.3 68,467.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 151.5 753.9
- 16. GROSS THERMAL ENERGY GENERATED (MWHI 722e969 4e908e025 95e660e820
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 233,820 1,598,000 32,231,750
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 220e574 le509e414 30e699e592 i 19. UNIT SERVICE FACTOR 80.6 79.7 80.2
- 20. UNIT AVAILADILITY FACTOR. 80.6 82.7 81.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 59.9 59.7 73.9
- 22. UNIT CAPACITY FACTOR (USING DER NET) 59.7 59.4 72.4
- 23. UNIT FORCED OUTAGE RATE 0.2 01 3.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEe DATEe AND DURATION OF EACH':
Unit scheduled to shut down November 7, 1980, for approximately one month for ref+ ling.
- 25. IF SHUTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP: A GUST 8, 1980 DATA REPORTED AND FACTORS CALCULATED AS REGbESTED IN NRC LETTER DATED SEPTEMBER 22e 1977
e g OPERATING DATA REPORT .
DOCKET No. 50-301 DATE August 5, 1980 s COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATING STATUS.
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT 0 nit 2 * [40TES .
- 2. REPORTING PERIOD: JULY 1980 . .
- 3. LICENSED THERMAL P0hER (MWT): 1518. . .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
6~. MAXIMUM DEPENDADLE CAPACITY (GROSS MWE): 519. . .
< 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495 . . . . . . . . . . . . . . . . . . . .....
- 8. IF CHANGES 0CCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORTe GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTEDe IF ANY (NET MWE): NOT APPLICABLE j 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE
' THiS MONTH YR TO DATE CUMULATIVE
- 11. HOURS iN REPORT NG PERIOD , 744 S e 111. 70e128
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 'i44.0 4,010.9 62e907.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 19 2 . 185.3
- 14. HOURS GENERATOR.ON LINE 744.0 3e994 7 61e671.7
- 15. UNIT RESERVE SHUTDOWN HOURS .
0.0 13.5 . 119.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,114,363 5,749,170 83,401,706
- 17. GROSS ELECTRICAL ENERGY GENERATED (MhH) 374e720 le922,570 28e283e910
- 18. NET ELECT 8ICAL ENERGY GENERATED (MWH) 357,605 1,829,787 . 26,904e914
- 19. UNIT SERVICE FACTOR 100.0 77.2 87.9
- 20. UNIT AVAILASILITY FACTOR. 100.0 77.4 88 1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 97.1 72.3 78.2
- 22. UNIT CAPACITY FACTOR (USING DER NET) 96.7 72.0 77.2
- 23. UNIT FORCED OUTAGE RATE 0.0 8.2 1.9 I
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEe DATEe AND DURATION OF EACH):
NONE t
- 25. IF SHUTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF START P: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REGOESTED IN NRC LETTER DATED SEPTEM0ER 22e 1977
~
, . . - _ - _. -_l- .- -.- _ _. ... . . -. -. ._
DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE August 5, 1980
- COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL i
MONTH July, 1980 AVERAGE AVERAGE AVERAGE
, DAILY DAILY DAILY I
POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 370 11 371 21 376
]
22 371 '*
l 2 371 12 371 3 371 13 358 23 370 4 373 14 371 24 322 5 374 15 375 25 344 6 372 16 368 26 -6 7 371 17 372 27 -2 j
8 372 18 372 28 -2 i
9 372 19 373 29 -2 ,
10 373 20 374 30 -2 i
31 -2 AD-28A (1-77)
" DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE August 5, 1980 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL i MONTH July, 1980 l
AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL
, DAY MWe NET - DAY MWe NET DAY MWe NET 1 458 11 489 21 488 2 426 12 486 22 486 3 468 13 486 23 485 4 483 14 487 24 482 5 468 15 488 25 486 6 442 16 488 26 486 7 486 17 488 27 483 8 488 18 485 28 487 9 488 19 492 29 483 10 488 20 484 30 484 31 483 AD-28A (1-77)
, UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 -
UNIT NAME Point Beach Unit 1 DATE Aunust 5. 1980 l REPORT MONTH anly. 1990 COMPLETED BY C. W. Fav TELEPHONE 414/277-2811 c u tn o 4 e
av au "co man St Pe ao in ce No. Date g 4g g jjg Licensee Event y g'g Cause and Corrective Action b :s :c e v .c Report No. ua so To Prevent Recurrence Q~ D'e e U) o 2: o i 0 I
4 3 800724 F 1.4 II 1 N/A IIF PILTEli The outage was due to a high i
differential pressure across the circulating water screens caused by a buildup of alewives that
- entered the intake crib.
4 800726 S 142.6 D 1 80-009/OlT CB llTEXCil As required by NRC Confirmatory i Order of 11-30-79, the unit was
- taken off line for the 90 effective full power day steam generator testing. Both steam generators are
- undergoing a 100% eddy current I examination through the first j support plate on the hot leg side, with 3% full length examinations.
i 1 3 F: Forced Reason: Metho'd:
- Exhibit G-Instruc-i S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry
] C- Refueling 3- Automatic Scram Sheets for LER File
- D- Regulatory Restriction 4- Other (explain) (NUREG-0161)
! E- Operator Training & License Exam i 5 F- Administrative Exhibit I- Same
- AD-28B G- Operational Error (explain) Source l
(01-78) 11- Other (explain)
j : 1 41 1 i (A
0D 1- N 2 o 78 .
8B
)
1 D
SF a
- : t e
SF co hr ec de ud N (Le~
l e
d Q:s ea3c
~:gu2 c
~
I I GFEDCBAR %egoc"
- - - - e a . _
OOAORRMEs tp dp e e a q o :
2 vjo
h e m e g fiu n R N e r ir u u n i: )cge3t U. p E I ranaletp titalem 8*C geRou" P O
T _
( isotine R S eotronan T H xnr rgnt L U paaTy c i M T lltr eF c O D c iaR a Re N O iEvie oi en ps T W nrans rl H N
) r it u oe S o nr Tr re r gi ee t A c s E N
( &t t( Nv J D e i e o. ne u x Lo x l P p in p t y O l c l , W a e a E i n i u 1 R
)
n s e )
n )gnV ga' .
9 8 R E
0 E D x U a C m UoEgas4 T I
og'e o O N
S 432lM
- - e t C OAMMh a tuaao Tu .
htnnd os eouu: e rmaaall P
ra C
( t en TO eiS vd EM D xcc e LP UO p r nC EL NC lSa to PE IK acm ir Rr r HT OE TE T
na ee ND N
) m cc E AN ut MO 5 4 ri E.
rv SE ( Sate ee 4 C P 5 ox Nhtix n 1 o 0 uh U e io h cA 4 i -
ri Reoni ec / n 3 cb Etnsb t 2 t 0 ai Gs i i 7 1 t - oft o 7 F B 0ffo n - a e I 1o rG 2 a
- 6rD - 8 c 1 API 1 h S ) Ltrn 1 a Eaes U m R pt n e Ear i Fnru t ,
it c '
lr - 2 ey
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-266
, Unit Name Point Beach Unit 1 Date August 5, 1980 Completed By C. W. Fay Telephone 414/277-2811 Unit 1 operated at 375 MWe net throughout most of the period with two shutdowns and one load reduction. The load was reduced to 330 MWe net for two hours on July 13, 1980 for turbine stop valve testing.
A leak check of the spent fuel pool detected four very small leaks. The leaks were repaired.
The unit was taken off-line for 1.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> on July 24, 1980, due to a high differential pressure across the circulating water screens caused by a buildup of alewives that entered the intake crib.
The unit was taken off-line at 0123 hours0.00142 days <br />0.0342 hours <br />2.03373e-4 weeks <br />4.68015e-5 months <br /> on July 26, 1980, for the 90 effective full power day steam generator testing and repair outage. An 800 psig secondary-to-primary leak check of both steam generators was performed on July 28, 1980.
In the "A" steam generator, two dripping explosive plugs and two wet end plugs were identified in the hot leg with no leaks detected in the cold leg. In the "B" steam generator, one wet end explosive plug and one dripping tube were identified in the hot leg with no leaks detected in the cold leg. Further investigation including eddy current examination is being conducted.
Pertinent maintenance being performed during the shut-down are condensate pump seal repairs and charging line isolation valve repairs. The auxiliary feed line orifice flange modification was initiated. No other major safety related maintenance was per-formed during the period.
l
. c.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date August 5, 1980 Completed By C. W. Fay Telephone 414/277-2811 Unit 2 operated at 495 MWe net throughout the period with 15 load reductions. One load reduction on July 16, 1980, was for crossover steam dump testing. The unit generated its 28 billionth kilowatt hour at 0548 hours0.00634 days <br />0.152 hours <br />9.060847e-4 weeks <br />2.08514e-4 months <br /> on July 8, 1980, with site production surpassing 60 billion kilowatt hours during tne period.
The 2P14A containment spray pump was out of service to repair minor leaks and the varidrive on the "B" charging pump was repaired. No other major safety related maintenance was performed during the period.
I i
l
- . . . - _ _ - . . _ .