Monthly Operating Repts for Jul 1980
ML19331B535
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/05/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML19331B533 List:
References
NUDOCS 8008120400
Download: ML19331B535 (8)


Text

- - _ _ _ _ _ -_ -__________ ______ _ _ _ _

.g-OPERATING DATA REPORT ,

DATE August 5, 1980 COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATING STATUS .

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 [40TES A 2. REPORTING PERIOD: JULY 1980 . .

C 3. LICENSED THERMAL POWER (MWT): 1518. . .

O 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .

g

5. DESIGN ELECTRICkL RATING (NET MWE): 497.
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519.

cb 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495 ~

8 . IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGil 7) SINCE LAST REPORTe GIVE REASONS:

M NOT APPLICADLE

9. POWER LEVEL TO WHICH RESTRICTEDe IF ANY (NET MWE): 390.0
10. REASONS FOR RESTRICTIONS, (IF ANY): SEXXXKTTA00lNE3EIR$ Power restriction is the result of a self-imposed D reduction in core average temperature in an attempt to inhibit corrosion of steam generator tubt.s within the tubesheet crevice. THIS MONTil YR TO DATE CUMULATIVE
11. Il00RS IN REPORTING PERIOD 744 5,111 85e343
12. NUMBER OF HOURS REACTOR WAS CRITICAL 601.4 4,218.5 70,735.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 19.1 601.3
14. HOVRS GENERATOR ON LINE . 600.0 4,073.3 68,467.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 151.5 753.9
16. GROSS THERMAL ENERGY GENERATED (MWHI 722e969 4e908e025 95e660e820
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 233,820 1,598,000 32,231,750
18. NET ELECTRICAL ENERGY GENERATED (MWH) 220e574 le509e414 30e699e592 i 19. UNIT SERVICE FACTOR 80.6 79.7 80.2
20. UNIT AVAILADILITY FACTOR. 80.6 82.7 81.1
21. UNIT CAPACITY FACTOR (USING MDC NET) 59.9 59.7 73.9
22. UNIT CAPACITY FACTOR (USING DER NET) 59.7 59.4 72.4
23. UNIT FORCED OUTAGE RATE 0.2 01 3.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEe DATEe AND DURATION OF EACH':

Unit scheduled to shut down November 7, 1980, for approximately one month for ref+ ling.

25. IF SHUTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP: A GUST 8, 1980 DATA REPORTED AND FACTORS CALCULATED AS REGbESTED IN NRC LETTER DATED SEPTEMBER 22e 1977

e g OPERATING DATA REPORT .

DOCKET No. 50-301 DATE August 5, 1980 s COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATING STATUS.

1. UNIT NAME: POINT BEACH NUCLEAR PLANT 0 nit 2 * [40TES .
2. REPORTING PERIOD: JULY 1980 . .
3. LICENSED THERMAL P0hER (MWT): 1518. . .
4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .

6~. MAXIMUM DEPENDADLE CAPACITY (GROSS MWE): 519. . .

< 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495 . . . . . . . . . . . . . . . . . . . .....

8. IF CHANGES 0CCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORTe GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTEDe IF ANY (NET MWE): NOT APPLICABLE j 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE

' THiS MONTH YR TO DATE CUMULATIVE

11. HOURS iN REPORT NG PERIOD , 744 S e 111. 70e128
12. NUMBER OF HOURS REACTOR WAS CRITICAL 'i44.0 4,010.9 62e907.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 19 2 . 185.3
14. HOURS GENERATOR.ON LINE 744.0 3e994 7 61e671.7
15. UNIT RESERVE SHUTDOWN HOURS .

0.0 13.5 . 119.9

16. GROSS THERMAL ENERGY GENERATED (MWH) 1,114,363 5,749,170 83,401,706
17. GROSS ELECTRICAL ENERGY GENERATED (MhH) 374e720 le922,570 28e283e910
18. NET ELECT 8ICAL ENERGY GENERATED (MWH) 357,605 1,829,787 . 26,904e914
19. UNIT SERVICE FACTOR 100.0 77.2 87.9
20. UNIT AVAILASILITY FACTOR. 100.0 77.4 88 1
21. UNIT CAPACITY FACTOR (USING MDC NET) 97.1 72.3 78.2
22. UNIT CAPACITY FACTOR (USING DER NET) 96.7 72.0 77.2
23. UNIT FORCED OUTAGE RATE 0.0 8.2 1.9 I
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEe DATEe AND DURATION OF EACH):

NONE t

25. IF SHUTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF START P: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REGOESTED IN NRC LETTER DATED SEPTEM0ER 22e 1977

~

, . . - _ - _. -_l- .- -.- _ _. ... . . -. -. ._

DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE August 5, 1980

COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL i

MONTH July, 1980 AVERAGE AVERAGE AVERAGE

, DAILY DAILY DAILY I

POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 370 11 371 21 376

]

22 371 '*

l 2 371 12 371 3 371 13 358 23 370 4 373 14 371 24 322 5 374 15 375 25 344 6 372 16 368 26 -6 7 371 17 372 27 -2 j

8 372 18 372 28 -2 i

9 372 19 373 29 -2 ,

10 373 20 374 30 -2 i

31 -2 AD-28A (1-77)

" DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE August 5, 1980 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL i MONTH July, 1980 l

AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL

, DAY MWe NET - DAY MWe NET DAY MWe NET 1 458 11 489 21 488 2 426 12 486 22 486 3 468 13 486 23 485 4 483 14 487 24 482 5 468 15 488 25 486 6 442 16 488 26 486 7 486 17 488 27 483 8 488 18 485 28 487 9 488 19 492 29 483 10 488 20 484 30 484 31 483 AD-28A (1-77)

, UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 -

UNIT NAME Point Beach Unit 1 DATE Aunust 5. 1980 l REPORT MONTH anly. 1990 COMPLETED BY C. W. Fav TELEPHONE 414/277-2811 c u tn o 4 e

av au "co man St Pe ao in ce No. Date g 4g g jjg Licensee Event y g'g Cause and Corrective Action b :s :c e v .c Report No. ua so To Prevent Recurrence Q~ D'e e U) o 2: o i 0 I

4 3 800724 F 1.4 II 1 N/A IIF PILTEli The outage was due to a high i

differential pressure across the circulating water screens caused by a buildup of alewives that

entered the intake crib.

4 800726 S 142.6 D 1 80-009/OlT CB llTEXCil As required by NRC Confirmatory i Order of 11-30-79, the unit was

taken off line for the 90 effective full power day steam generator testing. Both steam generators are
undergoing a 100% eddy current I examination through the first j support plate on the hot leg side, with 3% full length examinations.

i 1 3 F: Forced Reason: Metho'd:

  • Exhibit G-Instruc-i S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry

] C- Refueling 3- Automatic Scram Sheets for LER File

D- Regulatory Restriction 4- Other (explain) (NUREG-0161)

! E- Operator Training & License Exam i 5 F- Administrative Exhibit I- Same

AD-28B G- Operational Error (explain) Source l

(01-78) 11- Other (explain)

j  : 1 41 1 i (A

0D 1- N 2 o 78 .

8B

)

1 D

SF a

: t e

SF co hr ec de ud N (Le~

l e

d Q:s ea3c

~:gu2 c

~

I I GFEDCBAR %egoc"

- - - - e a . _

OOAORRMEs tp dp e e a q o  :

2 vjo

  • H U _

h e m e g fiu n R N e r ir u u n i: )cge3t U. p E I ranaletp titalem 8*C geRou" P O

T _

( isotine R S eotronan T H xnr rgnt L U paaTy c i M T lltr eF c O D c iaR a Re N O iEvie oi en ps T W nrans rl H N

) r it u oe S o nr Tr re r gi ee t A c s E N

( &t t( Nv J D e i e o. ne u x Lo x l P p in p t y O l c l , W a e a E i n i u 1 R

)

n s e )

n )gnV ga' .

9 8 R E

0 E D x U a C m UoEgas4 T I

og'e o O N

S 432lM

- - e t C OAMMh a tuaao Tu .

htnnd os eouu: e rmaaall P

ra C

( t en TO eiS vd EM D xcc e LP UO p r nC EL NC lSa to PE IK acm ir Rr r HT OE TE T

na ee ND N

) m cc E AN ut MO 5 4 ri E.

rv SE ( Sate ee 4 C P 5 ox Nhtix n 1 o 0 uh U e io h cA 4 i -

ri Reoni ec / n 3 cb Etnsb t 2 t 0 ai Gs i i 7 1 t - oft o 7 F B 0ffo n - a e I 1o rG 2 a

- 6rD - 8 c 1 API 1 h S ) Ltrn 1 a Eaes U m R pt n e Ear i Fnru t ,

it c '

lr - 2 ey

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-266

, Unit Name Point Beach Unit 1 Date August 5, 1980 Completed By C. W. Fay Telephone 414/277-2811 Unit 1 operated at 375 MWe net throughout most of the period with two shutdowns and one load reduction. The load was reduced to 330 MWe net for two hours on July 13, 1980 for turbine stop valve testing.

A leak check of the spent fuel pool detected four very small leaks. The leaks were repaired.

The unit was taken off-line for 1.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> on July 24, 1980, due to a high differential pressure across the circulating water screens caused by a buildup of alewives that entered the intake crib.

The unit was taken off-line at 0123 hours0.00142 days <br />0.0342 hours <br />2.03373e-4 weeks <br />4.68015e-5 months <br /> on July 26, 1980, for the 90 effective full power day steam generator testing and repair outage. An 800 psig secondary-to-primary leak check of both steam generators was performed on July 28, 1980.

In the "A" steam generator, two dripping explosive plugs and two wet end plugs were identified in the hot leg with no leaks detected in the cold leg. In the "B" steam generator, one wet end explosive plug and one dripping tube were identified in the hot leg with no leaks detected in the cold leg. Further investigation including eddy current examination is being conducted.

Pertinent maintenance being performed during the shut-down are condensate pump seal repairs and charging line isolation valve repairs. The auxiliary feed line orifice flange modification was initiated. No other major safety related maintenance was per-formed during the period.

l

. c.

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date August 5, 1980 Completed By C. W. Fay Telephone 414/277-2811 Unit 2 operated at 495 MWe net throughout the period with 15 load reductions. One load reduction on July 16, 1980, was for crossover steam dump testing. The unit generated its 28 billionth kilowatt hour at 0548 hours0.00634 days <br />0.152 hours <br />9.060847e-4 weeks <br />2.08514e-4 months <br /> on July 8, 1980, with site production surpassing 60 billion kilowatt hours during tne period.

The 2P14A containment spray pump was out of service to repair minor leaks and the varidrive on the "B" charging pump was repaired. No other major safety related maintenance was performed during the period.

I i

l