ML20003A960

From kanterella
Revision as of 23:28, 17 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised LER 80-087/03X-1
ML20003A960
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/20/1981
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20003A961 List:
References
2-011-21, 2-11-21, NUDOCS 8102100125
Download: ML20003A960 (1)


Text

1 y

1 ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. AAKANSAS 72203 (f 31) 371-4000 January 20, 1981

<, u 4 4 .

- ~

2-011-21 6-2 FEB0G1981

  • Mr. K. V. Seyfrit, Director Office of Inspection & Enforcement 3
  • pw**ume *

3 U. S. Nuclear Regulatory Comission 9, Region IV W x 611 Ryan Plaza Drive, Suite 1000 md4'e Arlington, Texas 76011

SUBJECT:

Arkansas Nuclear One-Unit 2 Docket No. 50-368 License No. NPF-6 Licensee Event Report No. 80-087/03 X-1 (File: 2-0520)

Gentlemen:

In accordance with Arkansas Nuclear One-Unit 2 Technical Specification 6.9.1.9.b., attached is the subject report concerning the failure of the High Pressure Safety Injection Valve (2CV-5056) during Mode 2 operation. This is an update to a previous report submitted December 26, 1980.

Very truly yours, 0f David C. Trimble Manager, Licensing DCT:GAC:st k

Attachment cc: Mr. Victor Stello, Jr. , Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission /l 8p Washington, D.C. 20555 #

Mr. Norman M. Haller, Director 'I' ,f Office of Management and Program Analysis U. S. Nuclear Regulatory Comission Washington, D.C. 20555 8102100 Mb ' usues - ccessoum unemessvsrau s