Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. NDE of Unit 4 Identified No Crack Indications.Nde of Unit 3 Will Be Completed During Cycle 12 Refueling,Currently Scheduled to Begin in Nov 1989
ML17345A661
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/04/1989
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17345A662 List:
References
IEB-88-008, IEB-88-8, L-89-176, NUDOCS 8905110028
Download: ML17345A661 (5)


Text

A.C CE1Z P>'TED DlR1BUTlOY DEMONS~04 SYPrgg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8905110028

  • DOC.DATE: 89/05/04 NOTARIZED: YES DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) k

SUBJECT:

Responds to NRC Bulletin 88-008, "Thermal Stresses in Piping Connected to RCS."

DISTRIBUTION CODE: IE16D COPIES RECEIVED:LTR TITLE: Bulletin Response 88-08 Thermal Stres%

4 inENCL Piping SIZE:

to RCS.

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME PD2-2 LTTR ENCL ID CODE/NAME PD2-2 PD LTTR ENCL LA 1 0 1 1 EDISON,G 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB ,

1 1 NRR HARTZMAN,M 1 1 NRR HUM,M 1 1 NRR REEVES,E.A. 1 . 1 NRR/DEST/ADE 8H 1 1 NRR/DEST/ADS 7E 1 1 NRR/DEST/MEB 9H 1 1 NRR/DOEA/EAB 11 1 1 NRR/DOEA/GCB 11 1 1 NRR/DREP/EPB 10 1 3 N S ILRB12 1 1 NUDOCS-ABSTRACT 1 1 REG FIL 02 1' RES/DSIR/EIB 1 1 RG 2 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 S

A 0

p D NOIX 'IO ALL "RID" RECIPZENIS:

S PIZASE HELP US 'IO iKDUCZ HASTE,! CGNI'ACT 'IHE DOCUMENT CONGEAL DESK, ROOM Pl-37 (EXI'." 20079) K) ELIHZNATE YOUR NME PKR DIBTRIBVZIGN LZSIS FOR DOCUMENIS YOU DON'T NEZD!

TOTAL. NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 21 P

P.O. Box14000,Juno Beach, FL 33408 0420 FPL MAYi 4 3989 L-89-176 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRC Bulletin 88-08 Thermal Stresses in Piping Connected to Reactor Coolant S stems NRC Bulletin 88-08, "Thermal Stresses in Piping Connected to Reactor Coolant Systems", dated June 22, '1988, requested that licensees (1) review their reactor coolant systems (RCS) to identify any conhected, unisolable piping that could be subjected to temperature distributions which would result in unacceptable thermal stresses, and (2) take action, where such piping is identified, to ensure that the piping will not be subjected to unacceptable thermal stresses.

By letter L-88-436 dated October 14, 1988, Florida Power & Light Company (FPL) responded to action items 1 and 2 of the bulletin, providing the results of our review for Turkey Point Units 3 and 4, and a plan and schedule for completing the non-destructive examination (NDE) required by the bulletin.

The NDE of Turkey Point Unit 4 has been completed. No crack indications were observed. A report of the examination is included as Attachment 1. The Unit 3 NDE will be completed during the cycle 12 refueling outage, currently scheduled to begin November 1989.

S5'05110028 85'0504 PDR ADOCk 050002 0 Cv F'DC

U. S. Nuclear Regulatory Commission L-89-176 Page two Action item 3 of the bulletin required that licensees plan and implement a program to provide continuing assurance that the unisolable sections of all piping connected to the RCS will not be subjected to the conditions described in the bulletin. In letter L-88-558 dated December 30, 1988 FPL discussed plans to have flow tests performed to demonstrate that those conditions are unlikely at Turkey Point Units 3 and 4. The flow tests have been completed.

The results of the testing and the conclusions reached are included in Attachment 2. No further actions beyond those described in are required.

Should there be any questions, please contact us.

Very truly yours, W. F Conw Senior Vic President Nuclear WFC/TCG/gp Attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident inspector, USNRC, Turkey Point Plant

STATE OF FLORIDA

) ss.

COUNTY OF PALM BEACH )

~W.F.C *d Fd d d,d That he is Senior Vice President- Nuclear of Florida Power 8 Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and b'elief, and that he is authorized to'xecute the document on behalf of said Licensee.

.F.Co ay Subscribed and sworn to before me this

~doy of 1+ d ISF9.

NOTARY PUBLIC, in and for the nty of Palm Beach, State of Florida gotary Public, State of Florida Expires furre I, 1989 My <ommission rein ~ rnhehenhe, Inc My Commission <<xpires: bonded lrdfn lhoy