ML19209B732

From kanterella
Revision as of 05:25, 2 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notifies That Response to 790808 Ltr Re Adequacy of Facility Electric Distribution Sys Voltages Cannot Be Made Until 791108
ML19209B732
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/05/1979
From: Clayton F
ALABAMA POWER CO.
To: Gammill W
Office of Nuclear Reactor Regulation
References
NUDOCS 7910100369
Download: ML19209B732 (1)


Text

Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 323-5341

'e o c side'nt AlabamaPower the southen erectre system October 5, 1979 Docket No. 50-348 Mr. William Gammill, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Gammill:

RE: Adequacy of Station Electric Distribution Systems Voltages Your letter dated August 8, 1979 on this subject requested that a detailed review of the electric power systems at Farley Nuclear Plant be conducted and a copy of the analysis be provided to the NRC within sixty (60) days of the date of your letter.

The review is in progress but due to the magnitude of the efforts involved it cannot be cc.npleted and provided to the NRC until November 8, 1979.

Yours very truly, 1 +. .g .

a bxys-K F. ,*')Clayton, L. Jr.

FLCJr/TNE:bhj -

cc: Mr. R. A. Thomas Mr. G. F. Trowbridge 1138.117 J

\D 10 7910 @ 0 g} &